ML20215C729
| ML20215C729 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/01/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20215C731 | List: |
| References | |
| NUDOCS 8610100419 | |
| Download: ML20215C729 (3) | |
See also: IR 05000424/1986005
Text
.
-
c
ve\\\\oa
'-
.
-
.
OCT 1
1986
Docket No. 50-424
License No. CPPR-108
'orgia Power Company
TTN: Mr. J. H. Miller, Jr.
President.
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW. OF V0GTLE READINESS REVIEW MODULE NO.13A, FOUNDATION
MATERIALS AND BACKFILL - NRC INSPECTION REPORT NO. 50-424/86-05
The NRC has completed a detailed review, inspection, and verification of the
subject. Module which you submitted to the NRC on January 9, 1986. Reviews were
conducted at NRC Atlanta and Bethesda offices and during periodic inspections
conducted at the Vogtle site.
Resultant findings were discussed with members of
your staff at the conclusion of these inspections.
Arcas contained in the module which were reviewed, examined, and verified are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress and
review of your licensing commitments.
The results of Module No. 13A reviews and inspections are provided in the Summary
and Conclusions Sections of the enclosed report.
l
Based on the review of this module and the results of previous NRC inspections,
the inspectors concluded that foundation construction was performed in accordance
'
with the appropriate procedures and that records reflect quality of the
construction.
The NRC findings are that the Vogtle prcgram for the design and
construction of Category 1 foundations complies with the Final Safety Analysis
Report and that compliance is verifiable with existing documentation.
The conclusions within the report are based upon information currently available
to the inspectors and reviewers.
Should information subsequently become
available which was not considered during this review, or which conflicts with
earlier information, it will be evaluated to determine what effects it may have
on the above conclusion.
'
Should you have any questions concerning this letter, please contact us.
l
Sincerely,
86101%[gh
[
"
ORIGINAL SIGNED BY:
O
J. NE!.303 CRACE
J. Nelson Grace
Regional Administrator
Enclosure:
(See page 2)
g
/
!.
.
'
WIl
M
Georgia Power Company
2
Enclosure:
Report No. 50-424/86-05
w/ enc 1:
J. P. O'Reilly, Senior Vice President
/ Nuclear Operations
(V . E. Conway, Senior Vice President &
Project Director
D. O. Foster, Vice President, Project
Support
/P.D. Rice,VicePresident, Project
Engineering
d . H. Pinson, Vice President, Project
Construction
/J.T.Beckham,VicePresident&
/ General Manager - Operations
VR. A. Thomas, Vice President,
j Licensing
/ D. S. Read, General Manager,
/QualityAssurance
VC. W. Hayes, Vogtle Quality
/ Assurance Manager
W . C. Ramsey, Manager -
/ Readiness Review
./G. B. Bockhold, General Manager,
/ Nuclear Operations
VL. Gucwa, Manager, Nuclear Safety
/andLicensing
vff. H. Googe, Project
/ Construction Manager
V . D. Groover, Quality
Assurance Site Manager -
/ Construction
/J. A. Bailey, Project Licensing
j Manager
yG. F. Trowbridge, Esq., Shaw,
j Pittman, Potts and Trowbridge
V B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
/E.L.Blake,Jr.,Esq.,Shaw,
/Pittman, Potts and Trowbridge
v0. E. Joiner, Troutman, Sanders,
~ .
.
h.LockermanandAshmore
G. Ledbetter, Commissioner,
Department of Human Resources
jC.H. Badger,OfficeofPlanning
I
l
and Budget
(cc w/ enc 1 cont'd - see page 3)
i
!
- - -
---
. . _ _ . _ _ . ,
_ . . _ . .
E
.
'
,
E I
1996
Georgia Power Company
3
,
d{te w/enci - cont'd)
. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
/DannyFeig,GeorgiansAgainst
/ Nuclear Energy
y M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
/ Panel
V Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
/G. A. Linenberger, Jr., Administrative Judge
Panel
Atomic Safety and Licensing Board
j Panel
4 B. P. Garde, Citizens Clinic, Director
/
Government Accountability Project
/.cw/ encl:
Reis, ELD
f.M. Hill,IE
/ H. Miller, NRR
/4. Brach, ED0
1. Sinkule, RII
. Christnot, RII
RC Resident Inspector
Document Control Desk
State of Georgia
' ~ ~ -
~
,
.
_
...
-
,
RI( -
RI
RI
R
RII
,
,
JLenah :Jw
JHarri
onlon
AHerdt
AGib on
MSinkule VBrownlee
'
4/g[/86
4/p//86
4/pj/86
4//f/86
4/p/86
4
/
A/d/86
,
l
RI
NRR-D
DQAUR,IE ELD
l
r
ht%-
MLIG/n
MOS f"
l
3 .alker
TMNo k
BGrimes
EChristgnbury
4/
4/ /86
9fn/86lt6
fa/86hs
1lMh'
- Q3/86
4/
1
-
.
.
-
.