ML20215C729

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-424/86-05 on Readiness Review Module 13A Re Foundation Matls & Backfill,Submitted on 860109. Foundation Constructed Per Appropriate Procedures & Records Reflect Quality of Const
ML20215C729
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/01/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20215C731 List:
References
NUDOCS 8610100419
Download: ML20215C729 (3)


See also: IR 05000424/1986005

Text

.

-

c

ve\\\\oa

'-

.

-

.

OCT 1

1986

Docket No. 50-424

License No. CPPR-108

'orgia Power Company

TTN: Mr. J. H. Miller, Jr.

President.

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW. OF V0GTLE READINESS REVIEW MODULE NO.13A, FOUNDATION

MATERIALS AND BACKFILL - NRC INSPECTION REPORT NO. 50-424/86-05

The NRC has completed a detailed review, inspection, and verification of the

subject. Module which you submitted to the NRC on January 9, 1986. Reviews were

conducted at NRC Atlanta and Bethesda offices and during periodic inspections

conducted at the Vogtle site.

Resultant findings were discussed with members of

your staff at the conclusion of these inspections.

Arcas contained in the module which were reviewed, examined, and verified are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress and

review of your licensing commitments.

The results of Module No. 13A reviews and inspections are provided in the Summary

and Conclusions Sections of the enclosed report.

l

Based on the review of this module and the results of previous NRC inspections,

the inspectors concluded that foundation construction was performed in accordance

'

with the appropriate procedures and that records reflect quality of the

construction.

The NRC findings are that the Vogtle prcgram for the design and

construction of Category 1 foundations complies with the Final Safety Analysis

Report and that compliance is verifiable with existing documentation.

The conclusions within the report are based upon information currently available

to the inspectors and reviewers.

Should information subsequently become

available which was not considered during this review, or which conflicts with

earlier information, it will be evaluated to determine what effects it may have

on the above conclusion.

'

Should you have any questions concerning this letter, please contact us.

l

Sincerely,

86101%[gh

[

PDR

"

ORIGINAL SIGNED BY:

O

J. NE!.303 CRACE

J. Nelson Grace

Regional Administrator

Enclosure:

(See page 2)

g

/

!.

.

'

WIl

M

Georgia Power Company

2

Enclosure:

Report No. 50-424/86-05

w/ enc 1:

J. P. O'Reilly, Senior Vice President

/ Nuclear Operations

(V . E. Conway, Senior Vice President &

Project Director

D. O. Foster, Vice President, Project

Support

/P.D. Rice,VicePresident, Project

Engineering

d . H. Pinson, Vice President, Project

Construction

/J.T.Beckham,VicePresident&

/ General Manager - Operations

VR. A. Thomas, Vice President,

j Licensing

/ D. S. Read, General Manager,

/QualityAssurance

VC. W. Hayes, Vogtle Quality

/ Assurance Manager

W . C. Ramsey, Manager -

/ Readiness Review

./G. B. Bockhold, General Manager,

/ Nuclear Operations

VL. Gucwa, Manager, Nuclear Safety

/andLicensing

vff. H. Googe, Project

/ Construction Manager

V . D. Groover, Quality

Assurance Site Manager -

/ Construction

/J. A. Bailey, Project Licensing

j Manager

yG. F. Trowbridge, Esq., Shaw,

j Pittman, Potts and Trowbridge

V B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

/E.L.Blake,Jr.,Esq.,Shaw,

/Pittman, Potts and Trowbridge

v0. E. Joiner, Troutman, Sanders,

~ .

.

h.LockermanandAshmore

G. Ledbetter, Commissioner,

Department of Human Resources

jC.H. Badger,OfficeofPlanning

I

l

and Budget

(cc w/ enc 1 cont'd - see page 3)

i

!

- - -

---

. . _ _ . _ _ . ,

_ . . _ . .

E

.

'

,

E I

1996

Georgia Power Company

3

,

d{te w/enci - cont'd)

. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

/DannyFeig,GeorgiansAgainst

/ Nuclear Energy

y M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

/ Panel

V Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

/G. A. Linenberger, Jr., Administrative Judge

Panel

Atomic Safety and Licensing Board

j Panel

4 B. P. Garde, Citizens Clinic, Director

/

Government Accountability Project

/.cw/ encl:

Reis, ELD

f.M. Hill,IE

/ H. Miller, NRR

/4. Brach, ED0

1. Sinkule, RII

. Christnot, RII

RC Resident Inspector

Document Control Desk

State of Georgia

' ~ ~ -

~

,

.

_

...

-

,

RI( -

RI

RI

R

RII

,

,

JLenah :Jw

JHarri

onlon

AHerdt

AGib on

MSinkule VBrownlee

'

4/g[/86

4/p//86

4/pj/86

4//f/86

4/p/86

4

/

A/d/86

,

l

RI

NRR-D

DQAUR,IE ELD

l

r

ht%-

MLIG/n

MOS f"

l

3 .alker

TMNo k

BGrimes

EChristgnbury

4/

4/ /86

9fn/86lt6

fa/86hs

1lMh'

  1. Q3/86

4/

1

-

.

.

-

.