Text
_
DEC 5 1986 Tennes Valley Authority ATTN:
- r. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
SUBJECT:
RECENT ALLEGATION - DOCKET NO. 50-260 k
The enclosure to this letter summarizes a recent allegation involving the safe end replacement program at Browns Ferry Unit 2.
To assure a timely review of issues involved with this allegation, the information in the enclosure was discussed by telephone on November 28, 1986, with Mr. M. J. May, Browns Ferry Licensing Manager.
We request that TVA review and evaluate this allegation and assure that
{'
appropriate action is taken. we also request that you inform us promptly of the results of your review.
If you have any questions regarding this allegation, please contact Ken Barr at (404) 331-0342.
Sincerely, ORIGINAL StGNED BY GARY G. ZECH Gary Z. Zech, Director Division of TVA Projects
Enclosure:
Allegation RII-86-A-0314 d
,9 w/ encl:
- w. P. Pomrehn, Site Director Browns Ferry Nuclear Plant
. L. Lewis, Plant Manager
. L. Gridley, Director Nuclear Safety and Licensing
/ W. Cantrell, Acting Director jNuclear Engineering W1. J. May, Site Licensing Manager bcc w/ encl:
(See page 2) 8612150348 861205 PDR ADOCK 05000260 P
[ eof
DEC 5 1986 Tennessee Valley Authority 2
wienc1:
N. Grace, RII
. R. Denton, NRR t,K L. Thompson, NRR c d. M. Taylor, IE v8. B. Hayes, 01 y.R.Connelly,01A s
v. Gears, NRR vff. Grotenhuis, NRR
/ K. P. Barr, RII DeMiranda, PII M. Upright, RII C Resident Inspector NRC Document Control Desk State of Alabama l
l I
l
/
RI RII
/
RII d
gh :
w e i,saj pGJenkins,
,i ni.
u
T[,.
V DEC 5 196 6 ENCLOSURE ALLEGATION Rll-86-A-0314 On November 26, 1986, a TVA pipefitter alleged that 30 to 50 General Electric Company contract personnel are not qualified to perform the safe end replacement-work on Browns Ferry Unit 2.
He stated that the contractors were hired off the street and have never had any nuclear plant experience.
He also stated that the background checks of these individuals were inadequate.
He stated that TVA people are fully qualified and badged on site, but were not given this job.
The alleger stated that since TVA people were available, this may violate conflict of interest restrictions on contractors.
1