ML20215C691

From kanterella
Jump to navigation Jump to search
Summary of 860923 Meeting W/Util in Region II Ofc Re Const of Administered Operator Licensing Exams.Ltr & Encl to Be Placed in PDR (Ref 10CFR2.790).List of Attendees Encl
ML20215C691
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/01/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8610100406
Download: ML20215C691 (3)


Text

-

l 00T 1 1986 lorida Power and Light Company TTN: Mr. C. O. Woody Group Vice President Nuclear Energy Department P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT:

MEETING SUMIARY, DOCKET N05. 50-250 AND 50-251 This refers to the management meeting conducted at your request in the NRC Region II office on September 23, 1986. This meeting was held to discuss the construction of the NRC and Florida Power and Light Company (FPL) administared operator licensing examinations.

FPL attendees presented some general conclusions concerning areas where it was thought that the examinations could be improved to enhance understanding by the examinee. NRC attendees indicated that they intended to consider these conclusions and if appropriate factor them into future examinations. A list of attendees at the meeting is shown in Enclosure 1.

It is our opinion that this meeting was bene,ficial in that it provided us with a better understanding of your examination review process.

In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning these matters, we will be pleased to discuss them.

Sincerely, Original Signed by Luis A. Reyes /for Roger D. Walker, Director DivisionofReactorProjects

Enclosure:

List of Attendees

/ccw/ enc 1:

V C. M. Wethy, Vice President

/ Turkey Point Nuclear Plant v C. J. Baker, Plant Manager Turkey Point Nuclear Plant

. W. Bladow, Plant QA Superintendent J. Arias, Jr. , Regulatory and Compliance Supervisor '

W. J. Waylett, Jr. , Manager, Nuclear Training

. C. Miller, Training Superintendent Turkey Point bec w/ encl: (See page 2) e61o100406 e61ool yDR ADOCK 05000250 PDR

~

r Florida Power and Light Company 2 gg i 1o86

. xc w/ encl:

A RC Resident Inspector Document Control Desk State of Florida 1

RII RII RII RI]

N CChristensen:jd SElrod DVerrelli AGi son 9/j/86 2 9/y/86 9/ /86 9/y/86 27

007 1 1986 ENCLOSURE MEETING ATTENDEES Licensee Attendees C. J. Baker, Plant Manager, Turkey Point Nuclear Plant W. J. Waylett, Jr. , Nuclear Training Manager W. C. Miller, Training Superintendent, Turkey Point Nuclear Plant P. L. Pace, Licensing Supervisor NRC Attendees A. F. Gibson, Director, Division of Reactor Safety (DRS)

V. W. Panciera, Deputy Director, DRS C. A. Julian, Chief, Operations Branch, DRS, S. A. Elrod,. Chief, Reactor Projects Section 2C, Division of ReactorProjects J. F. Munro, Acting Chief, Operator Licensing Section, DRS W. Dean, Operator Examiner, DRS e

l r

l I

l

,. - ..-~-