E-ennu NRC OFERAT!NS STATUS REPCRT CCMPLETED BY REACTCR ENSINEERIM *eseen
- 1. DOCKET.... 50-423 OPERATING STATUS
- 2. REPCRTING PERIOD... JULY 1966 0UTAGE + ONLINi HOURS.. 169
+ 575
= 744
- 3. UllLITY CCNTACT.................A. L. ELMS 203-444-5328
- eennuenn 4.
LICENSED THERMAL P0 DER.........................................
3411 e MILLSTONE e
- 5. NAMEPLATE R Ailmi (6ROSS MbE)................................... 1.253 MW e UNIT 3 e
- 6. DESIGN ELECTRICAL RATING (NET MbE)..............................
1153.61 enuneesese
- 7. MAI! MUM CEPENDABLE CAF ACITY (6RDSS Mutl........................ 1197
- 8. MAI! MUM DEPENDABLE CAPAC!iY (NET MWEl...........................
1149.35 9.
IF CHAN3ES DCCUR ABOVE SINCE LAST REPCRT, REASONS ARE...........
N/A
- 10. FCWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEl...............N/A
!!. REASCN FCR RESTRICTICN, IF ANY....N/A MONTH YEAR TO DATE CUMULATIVE TO DATE 33333 333333333333 333333333333333333
- 12. HOURS IN REPCRTINS FERIOD 744.0 2399.0 2399.0
- 13. NUMBER OF HOURS THE REACTOR NAS CRITICAL 575.0 2135.3 2135.3
- 14. REACTOR RESERVE SHUTCOWN HOURS 0.0 83.2 63.2
- 15. HOURS 6ENERATCR ONLINE 575.0 2119.2 2119.2
- 16. UNIT RESERVE SHUTDCWN HOURS 0.0 0.0 0.0
- 17. GROSS THERMAL ENER6Y 6ENERATED (MWHI 1943450.4 7059833.7 7059633.7
- 19. GROSS ELECTRICAL ENERSY 6ENERATED (MWHI 669546.0 2449912.5 2441912.5
- 19. NET ELECTRICAL ENERBY GENERATED (MWH) 639674.0 2342520.1 2342520.1
- 20. UNIT SERVICE FACTOR 77.3 68.3 68.3
- 21. UNIT AVAILABILITY FACTOR 77.3 98.3 68.3
- 22. UNIT CAPACITY FACTOR (USING MDC NET) 74.8 65.0 65.0 Y
- 23. UNIT CAPACITY FACTOR (USINS DER NET) 74.5 84.6 64.6
- 24. UNIT FORCED OUTAGE RATE 22.7
!!.7 11.7
- 25. UNIT FORCED OUTAGE HOURS 169.0 279.0.
279.6 SHUTD0hWS SCHECULED DVER NEIT S!! MONTHS (TYPE, DATE, AND CURATION DF EACHl..............
NJA i'
4 IF CURRENTLY SHUIDCWN, ESTIMATED STARTUP DATE..... 4UGUST 13 1986 J
J 8610100273 860731 R
[
h,h PDR ADOCK 05000423 L
1/I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE August 6, 1986 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 MONTH
-July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1120 17 1109 2
1143 18 1123 3
1147 19 1175 4
1158 20 1079 5
1125 21 948 6
1130 22 1127 7
1135 23 1129 8
1200 24 942 9
1075 25 0
10 1147 26 0
11 1143 27 0
12 1113 28 0
13 1132 29 0
14 1128 30 0
15 1105 31 0
16 1123 1
l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE August 6, 1986 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 REPORT MONTH JULY.1986 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (1) (Hours)
Reason (2)
Down Reactor (3) Report #
-Code Code Prevent Recurrence 86-04 7-21-86 F 0
G 9
NA SM P
Level Control Valve failure due to improper tagging causes Heater Drain Pump
/47,O 86-05 7-24-86 F
-46er A
3 86-41 SJ TC Trip during shutdown to repair Main Generator Stator Coolant leak and valve in Letdown System.
1 2
3 4
~F:
Forced
~ Reason:
-Method:
-Exhibit G - Instructions S:
Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B.- Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)
E - Operator Training & License previous month Examination 5 - Power Reduction 5 F - Administrative (Duration = 0)
Exhibit 1 - Same Source G. Operational Error (Explain) 9 - Other (Explain)
H - Other (Explain)
I,
'NORT9 EAST 55TIRJTIES cener.i On c... seicen sire.i. Boriin. Connecticut I
n$a
=i ste c""
P.O. BOX 270
$ 7. C',2.,7,'",%~.
HARTFCRD, CONNECTICUT 06141-0270 k
k J
(203) 665-5000 August 11, 1986 MP-9363 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirerrents of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 86-8 covering operations for the month of July is hereby forwarded.
Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY OD&
Wayne D. Rom g
Station Sup tendent Millstone Nuclear Power Station WDR/ ALE:sb Attachment cc: