Forwards Insp Rept 50-424/86-49 of Readiness Review Module 20, Instrumentation & Controls. Applicant Program for Design & Const of Instrumentation & Controls for safety- Related Sys at Facility Acceptable
ML20215C404
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/05/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20215C405 List:
References
NUDOCS 8612150124
Download: ML20215C404 (3)


See also: IR 05000424/1986049

Text

3

-

,

J.

$

~

.,:

-

DEC 0 51986

Docket No. 50-424

License No. CPPR-108

Georgia Power Company

ATTN: Mr. J. H. Miller, Jr. ,

President

P.O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE NO. 20, INSTRUMENTATION

AND CONTROLS - REPORT NO. 50-424/86-49

The NRC has completed a detailed review, inspection, and verification of the

subject Module which you submitted to the NRC on April 4,

1986.

Periodic

inspections were conducted at the Vogtle site, and the result and findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews also were conducted in NRC Bethesda offices, and the findings

from these reviews have been discussed with your staff.

Areas contained in the module, which were reviewed, examined, and verified, are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

Open items resulting from Module No. 20 reviews and inspections are summarized as

Inspector Followup Items. Your attention is invited to these matters which will

be pursued during future licensing reviews and inspections.

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the applicant's program for design and construc-

tion of instrumentation and controls for safety-related systems at Vogtle Unit

No. 1 are acceptable and comply with applicable regulatory requirements with the

exception of those items or areas identified in the enclosed report.

This

decision is based on information currently' available to the inspectors and

reviewers.

Should information subsequently become available which was not

considered during this review or which conflicts with earlier information, it

will be evaluated to determine what effect it may have on the above conclusion.

Should you have any questions concerning this letter, please contact us.

Sincerely,

8612150124 861205 T

g"-~

3%

,.

'

PDR

ADOCK 05000424'

G

PDR

J. 4.i;i C:Zi

J. Nelson Grace

Regional Administrator

}

Enclosure:

(See page 2)

I

.cc ol

,

.-

F

?,s

.,

Georgia Power Company

2

DEC0 5 W

Enclosure:

Report No. 50-424/86-49

cc w/ encl:

4. P. O'Reilly, Senior Vice President

Nuclear Operations

gg E. Conway, Senior Vice President &

Project Director

ig. O. Foster, Vice President, Project

Support

(P" D. Rice, Vice President, Project

Engineering

(p. H. Pinson, Vice President, Project

onstruction

. T. Beckham, Vice President &

Jeneral Manager - Operations

M. A. Thomas, Vice President,

_J.icensing

F. S. Read, General Manager,

Quality Assurance

ft W. Hayes, Vogtle Quality

Assurance Manager

g C. Ramsey, Manager -

JeadinessReview

LY. B. Bockhold, General Manager,

Nuclear Operations

d / Gucwa, Manager, Nuclear Safety

and Licensing

M H. Googe, Project

JonstructionManager

E D. Groover, Quality

Assurance Site Manager -

Construction

if A. Bailey, Project Licensing

Manager

(JV F. Trowbridge, Esq., Shaw,

fittman, Potts and Trowbridge

lE W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

tM L. Blake, Jr., Esq., Shaw,

_/.Pittman,PottsandTrowbridge

E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

LY G. Ledbetter, Commissioner,

Department of Human Resources

fl/H. Badger, Office of Planning

and Budget

gjk Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

i

e-

'

.

.-

,

DN

Georgia Power Company

3

cc,w/ enc 1:

(cont'd)

(f. Feig, Georgians Against

uclear Energy

. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

fanel

IDf. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

,_fanel

Ur. A. Linenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

Janel

tr. P. Garde, Citizens Clinic, Director

Government Accountability Project

bec w/ encl:

T. Reis, GS0

tjV M. Hill, IE

@/, Miller,NRR

y Brach, GSO

M. Sinkule, RII

E. Christnot, RII

% Resident Inspector

Document Control Desk

State of Georgia

i

l

l

l

h

if{l'$

MHunhg.

g

TECon on

ARHerdt

'VPa ciera

MSinkule

{

/

i

09/op/86

$/A/86

jifA 3/86

03/ /56

09/g /86

tofull&

RII

NRR

NRR

hTR

'

Aso'6 / c~t-

HUS /es -

alke ,

TNovaR'

E i

s

EChristenbury

$/3/86

AMT/g /86

09/

86

09/ /86

I Z.

Jg l

l

t

h

._

-

.

-- -

.-_-_.

--_

-.