| Site: | Vogtle |
| Issue date: | 12/05/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20215C405 | List: |
| References | |
| NUDOCS 8612150124 | |
| Download: ML20215C404 (3) | |
See also: IR 05000424/1986049
Text
3
-
,
J.
$
~
.,:
-
DEC 0 51986
Docket No. 50-424
License No. CPPR-108
Georgia Power Company
ATTN: Mr. J. H. Miller, Jr. ,
President
P.O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE NO. 20, INSTRUMENTATION
AND CONTROLS - REPORT NO. 50-424/86-49
The NRC has completed a detailed review, inspection, and verification of the
subject Module which you submitted to the NRC on April 4,
1986.
Periodic
inspections were conducted at the Vogtle site, and the result and findings were
discussed with members of your staff at the conclusion of these inspections.
Technical reviews also were conducted in NRC Bethesda offices, and the findings
from these reviews have been discussed with your staff.
Areas contained in the module, which were reviewed, examined, and verified, are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
Open items resulting from Module No. 20 reviews and inspections are summarized as
Inspector Followup Items. Your attention is invited to these matters which will
be pursued during future licensing reviews and inspections.
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the applicant's program for design and construc-
tion of instrumentation and controls for safety-related systems at Vogtle Unit
No. 1 are acceptable and comply with applicable regulatory requirements with the
exception of those items or areas identified in the enclosed report.
This
decision is based on information currently' available to the inspectors and
reviewers.
Should information subsequently become available which was not
considered during this review or which conflicts with earlier information, it
will be evaluated to determine what effect it may have on the above conclusion.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8612150124 861205 T
g"-~
3%
,.
'
ADOCK 05000424'
G
J. 4.i;i C:Zi
J. Nelson Grace
Regional Administrator
}
Enclosure:
(See page 2)
I
.cc ol
,
.-
F
?,s
.,
Georgia Power Company
2
DEC0 5 W
Enclosure:
Report No. 50-424/86-49
cc w/ encl:
4. P. O'Reilly, Senior Vice President
Nuclear Operations
gg E. Conway, Senior Vice President &
Project Director
ig. O. Foster, Vice President, Project
Support
(P" D. Rice, Vice President, Project
Engineering
(p. H. Pinson, Vice President, Project
onstruction
. T. Beckham, Vice President &
Jeneral Manager - Operations
M. A. Thomas, Vice President,
_J.icensing
F. S. Read, General Manager,
Quality Assurance
ft W. Hayes, Vogtle Quality
Assurance Manager
g C. Ramsey, Manager -
JeadinessReview
LY. B. Bockhold, General Manager,
Nuclear Operations
d / Gucwa, Manager, Nuclear Safety
and Licensing
M H. Googe, Project
JonstructionManager
E D. Groover, Quality
Assurance Site Manager -
Construction
if A. Bailey, Project Licensing
Manager
(JV F. Trowbridge, Esq., Shaw,
fittman, Potts and Trowbridge
lE W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
tM L. Blake, Jr., Esq., Shaw,
_/.Pittman,PottsandTrowbridge
E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
LY G. Ledbetter, Commissioner,
Department of Human Resources
fl/H. Badger, Office of Planning
and Budget
gjk Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
i
e-
'
.
.-
,
DN
Georgia Power Company
3
cc,w/ enc 1:
(cont'd)
(f. Feig, Georgians Against
uclear Energy
. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
fanel
IDf. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
,_fanel
Ur. A. Linenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
Janel
tr. P. Garde, Citizens Clinic, Director
Government Accountability Project
bec w/ encl:
T. Reis, GS0
tjV M. Hill, IE
@/, Miller,NRR
y Brach, GSO
M. Sinkule, RII
E. Christnot, RII
% Resident Inspector
Document Control Desk
State of Georgia
i
l
l
l
h
if{l'$
MHunhg.
g
TECon on
ARHerdt
'VPa ciera
MSinkule
{
/
i
09/op/86
$/A/86
jifA 3/86
03/ /56
09/g /86
tofull&
RII
NRR
hTR
'
Aso'6 / c~t-
HUS /es -
alke ,
TNovaR'
E i
s
EChristenbury
$/3/86
AMT/g /86
09/
86
09/ /86
I Z.
Jg l
l
t
h
._
-
.
-- -
.-_-_.
--_
-.