DPERATING DATA REPORT WNP-2 01-Aug-86 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
Jul-86 OUTAGE + ON-LINE HOURS 744 3.
UTILITY CONTACT:
LEONARD HUTCHIBON (509) 377-2486 4.
LICENSED THERMAL POWER (MWt):
3323 5.
NAMEPLATE RATING (GROSS MWe):
1200.1 6.
DESIGN ELECTRICAL RATING (NET MWe):
1100 7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1140 C.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1095 9.
IF CHANGES DCCUR ABOVE SINCE LAST REPDRT, GIVE REASONS:
NONE
- 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
- 11. REASONS FDR RESTRICTIONS, IF ANY: _
MONTH YEAR CUMULATIVE
- 12. REPDRT PERIOD HOURS 744 5087 14287.2
- 13. HOURS REACTOR CRITICAL 717.4 2874.9 10191.0
- 14. RX RESERVE SHTDWN HRS O.O 340.4 340.4
- 15. HRS GENERATOR ON LINE 709.2 2656.9 9683.3
'.16.
UNIT RESERVE SHUTDOWN HOURS O.0 381.7 381.7
- 17. BROSS THERMAL ENERGY (MWH) 2078400 6318330 23882610
- 18. BROSS ELECTRICAL ENERGY (MWH) 696050 2006620 7909870
- 19. NET ELECTRICAL ENERGY (MWH) 667000 1998390 7585163 l 20. UNIT SERVICE FACTOR 95.3%
52.2%
67.8%
' 21. UNIT AVAILABILITY FACTDR 95.3%
59.7%
70.4%
' 22. UNIT CAPACITY FACTOR (MDC NET) 81.9%
35.9%
48.5%
- 23. UNIT CAPACITY FACTOR (DER NET) 81.5%
35.7%
48.3%
- 24. UNIT FORCED OUTAGE RATE 4.7%
3.6%
0.4%
. 25. FDRCED DUTAGE HOURS 34.8 100.0 885.0
' 23. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):
NONE r
l
' 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
8610100173hk@O397 PDR ADOCW PDR R
/@
0
e AVERAGE DAILY UNIT POWER LEVEL 50-397 DOCKET NO.
UNIT WNP-2 DATE 8/1/86 COMPLETED BY LB Hutchison TELEPHONE (509)377-2486 MONTH
.1HI Y 10R6 DAY AVERAGE Y
WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1067 2
734 908 is 836 3
1s 992 4
1002 20 inu 1058 5
21 926 e
1071 955 22 1073 968 7
23 a
1061 1009 24 1066 515 9
2s 10 5
364 2s i
253 887 l
11 27 810 I
12 2s 967 13 922 970 2s.
14 1049 30 981 15 1065 994 18 10 9 INSTRUCTIONS On this form, list the averap daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole mepwatt.
1hese figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is l
used for the not electrical rating of the-unit, thers may be occasions when.the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
DOCKET NO.
50-397 LN1'T tW1E ~
-WNP-2
~ ~.,
DATE August 1, 1986 LNIT SIUTDOWNS / REDUCTIONS COMPLETED BY L. B. Hutchispn REPORT PERIOD ~ JULY 1986 TELEPilotE (509)377-2486
- month, year
~ NO.
D7(TE TYPE IOURS REASON N LER nut 43ER SYSTEN COMPONENT CAUSE & CORRECTIVE ACTION TO HlEVENT RECURRENCE 86-08 7/10/86 F 17.1 G
3 86-023 EC INSTRU-P REACTOR SCRAMED AT 100% POWER ON HIGH APRM NEUTRON FLUX, WHEN POWER TO MICROWAVE TELE-METRY EQUIPMENT WAS M0MENTARILY INTERRUPTED WHILE TROUBLE SHOOTING A GROUND Of! 125VDC DISTRIBUTION SYSTEM. AN ENGINEERING EVALUATION WILL BE MADE TO PROPERLY IDENTIFY CRITICAL POWER SUPPLIES 86-09 7/25/86 F 17.7 A
3 86-025 HB VALVEX REACTOR SCRAMED AT 72% POWER ON RPV HIGH PRESSURE, WHILE PERFORMING WEEKLY TURBINE VALVE TESTS. A BROKEN PIN TO LINKAGE ON A GOVERNOR VALVE CAUSED FALSE VALVE POSITION SIGNAL AND RESULTED IN FAILURE OF DEH SYSTEM TO CONTROL PRESSURE. THE PIN WAS REPLACED AND PLANT RETURNED TO SERVICE.
I I
l SLt11ARY l
)
TYPE REASON METHOD SYSTEM & COMP 0ENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched 0-Maint or Test G-Oper Error 241anual Scram Instructions for C-Refueling Il-Other 3-Aute Scram Preparation'of l
D-Rc0ulatory Restriction 4-Continued Data Entry Sheet i
5-Reduced Load Licensee Event Report E-Operator Training 9-Other (LER) File (NUREG-0161) j
& License Examination l
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
- 3000 George \\\\'ashington \\\\'ay
- Richland, \\\\'ashington 99352 Docket No.
50-397 August 8, 1986 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for July 1986 as required by our Technical Specifications 6.9.1.6.
Very truly yours, hlil hun-C. M. Powers (M/D 927M)
WNP-2 Plhnt Manager CMP /lc Enclosure cc: Mr. John B. Martin -
NRC, Region V NRC Site Representative - WNP-2 Ms. Dottie Sherman -
ANI, Farmington CT Mr. J. T. Wheelock -
INP0 GY p
i.t i