ML20215B139
| ML20215B139 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/10/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20215B141 | List: |
| References | |
| NUDOCS 8706170233 | |
| Download: ML20215B139 (2) | |
See also: IR 05000498/1987007
Text
}
x
. JUN 10 1987 -
x
,.
'
k
i
'
In. Heply Refer To:
,
_
Dockets:
50-498/87-07.-
<
50-499/87-07-
'~
Houston Lighting & Power Company
4'
ATTN: .J..H. Goldberg
Group Vice President, Nuclear
.P. O.-Box 17003
Houston', Texas 77001.
.Gentiemen:
This: refers to the' inspection conducted by Messrs. C. E. Johnson and other
members of the NRC staff during the period February -2 through March '27,1987,
b
of activities.-authorized by NRC Construction Permits CPPR-128 and CPPR-129'for
.the South' Texas Project, Units-1 and 2, and to the discussion'of our findings
with J. T. Westermeier and other members of your staff at the' conclusion of the
inspection.
L
Areas examined during the inspection included site tours, licensee action on
previously reported items, licensee action on IE Circulars, procurement,
receiving and storage, safety-related structural steel, post-tensioning,
safety-related components, safety-related pipe supports and restraints,
!
protective coatings, cooling water reservoir, concrete testing, and followup on
allegations. Within these areas, the inspection consisted of selective
1 examination of procedures and-representative records, interviews with_
personnel, and' observations by the NRC inspectors. The inspection findings ~are
documented in the enclosed inspection report.
'Within the' scope of the inspection, no violations or deviations were
identified.
We' have also examined actions.you have taken with regard to previously
identified inspe'ction findings. The. status'of these-items is identified in
paragraph 3.of the' enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
'%Mginal Staned @
p
H. E. H AtL"
"
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure: .(see next page)
RIV:SRjff
RPB/ @
RPB/A M RPB/
RPB/C M C:RPB/C h
CEdohnson/lr DLGarrison WMMcNeill
RGTay r HFBundy GLConstable
.(,/$ /87
G/
7
4 / v/87
6/3 /87 s / 3 /87
7/87AC
ME ers n_ .J Gag ardo)Y
l[P
/
gl/g
\\
(,/3/ 87 .(a/}/87
8706170233 870610
'
qb
i l
PDR.'ADOCK 05000498
o
3
,
10 -
j
j
- ,
-
-
-
a
..
,
,.
. , .
,
,
'
' ' '
^
>
,3
+
n
y.
,
,
,
8- (
(
,
-
m
,
,
,
y
,
-
nq }
,
.e
,
s
Jy
' Hbustbn Lightirig & Power Company .
' - 2 - --
.
n
.
lEnclosurei . .
l Appendix - NRC Inspection Report
.
%
50-498/87-07'-
M,
'
50-499/87-07-
,
4-
cc.w/ enclosure:
.
.
- ,,
'
'
'
Houston Lighting & Power Company
' ATTN:. M.HWisenberg,. Manager,
'
-
.-'
.
Nuclear' Licensing.
.P."O.sBox.17004
- Houston,-, Texas: 77001
' Houston Lighting'& Power Company
LATTN:
G.,Vaughn, Vice, President,
.
.,
..
i Nuclear Operations
P. 0. Box 17005 . ' '
.
-Houston,;, Texas ,77001,
4.
Texas Radiation Control Program Director
- =
..
abcctdDMB-(IE01):-
1
,
bec distrib'. by RIV:
- RPB
'
.
DRSP.
- RRI-0PS .
R.~D. Martin, RA ,
~ * RRI-CONST.'
- SectionChief(RPB/C)-
'
s
'* MIS System-
- R&SPB- .
'*D. Weiss, RM/ALF
'
- RIV File
^
. R. Pirfo,. ELD
- RSTS Operator-'
.
- R'. G.. Taylor, RPB/C;
"*RSB
- Project 1 Inspector.
- R. Hall
- P.
Kadambi',LNRR'
M. Emerson
,
'*W. McNeill
<
,
- w/766
"r
"
,
i
1
i
,
'
L
'$
.