Forwards Insp Repts 50-498/87-07 & 50-499/87-07 on 870202-0327.No Violations or Deviations Noted
ML20215B139
Person / Time
Site: South Texas  
Issue date: 06/10/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20215B141 List:
References
NUDOCS 8706170233
Download: ML20215B139 (2)


See also: IR 05000498/1987007

Text

}

x

. JUN 10 1987 -

x

,.

'

k

i

'

In. Heply Refer To:

,

_

Dockets:

50-498/87-07.-

<

50-499/87-07-

'~

Houston Lighting & Power Company

4'

ATTN: .J..H. Goldberg

Group Vice President, Nuclear

.P. O.-Box 17003

Houston', Texas 77001.

.Gentiemen:

This: refers to the' inspection conducted by Messrs. C. E. Johnson and other

members of the NRC staff during the period February -2 through March '27,1987,

b

of activities.-authorized by NRC Construction Permits CPPR-128 and CPPR-129'for

.the South' Texas Project, Units-1 and 2, and to the discussion'of our findings

with J. T. Westermeier and other members of your staff at the' conclusion of the

inspection.

L

Areas examined during the inspection included site tours, licensee action on

previously reported items, licensee action on IE Circulars, procurement,

receiving and storage, safety-related structural steel, post-tensioning,

safety-related components, safety-related pipe supports and restraints,

!

protective coatings, cooling water reservoir, concrete testing, and followup on

allegations. Within these areas, the inspection consisted of selective

1 examination of procedures and-representative records, interviews with_

personnel, and' observations by the NRC inspectors. The inspection findings ~are

documented in the enclosed inspection report.

'Within the' scope of the inspection, no violations or deviations were

identified.

We' have also examined actions.you have taken with regard to previously

identified inspe'ction findings. The. status'of these-items is identified in

paragraph 3.of the' enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

'%Mginal Staned @

p

H. E. H AtL"

"

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure: .(see next page)

RIV:SRjff

RPB/ @

RPB/A M RPB/

RPB/C M C:RPB/C h

CEdohnson/lr DLGarrison WMMcNeill

RGTay r HFBundy GLConstable

.(,/$ /87

G/

7

4 / v/87

6/3 /87 s / 3 /87

7/87AC

ME ers n_ .J Gag ardo)Y

AC

l[P

/

gl/g

\\

(,/3/ 87 .(a/}/87

8706170233 870610

'

qb

i l

PDR.'ADOCK 05000498

o

3

,

10 -

PDR

j

j

- ,

-

-

-

a

..

,

,.

. , .

,

,

'

' ' '

^

>

,3

+

n

y.

,

,

,

8- (

(

,

-

m

,

,

,

y

,

-

nq }

,

.e

,

s

Jy

' Hbustbn Lightirig & Power Company .

' - 2 - --

.

n

.

lEnclosurei . .

l Appendix - NRC Inspection Report

.

%

50-498/87-07'-

M,

'

50-499/87-07-

,

4-

cc.w/ enclosure:

.

.

- ,,

'

'

'

Houston Lighting & Power Company

' ATTN:. M.HWisenberg,. Manager,

'

-

.-'

.

Nuclear' Licensing.

.P."O.sBox.17004

Houston,-, Texas: 77001

' Houston Lighting'& Power Company

LATTN:

G.,Vaughn, Vice, President,

.

.,

..

i Nuclear Operations

P. 0. Box 17005 . ' '

.

-Houston,;, Texas ,77001,

4.

Texas Radiation Control Program Director

  • =

..

abcctdDMB-(IE01):-

1

,

bec distrib'. by RIV:

  • RPB

'

.

DRSP.

  • RRI-0PS .

R.~D. Martin, RA ,

~ * RRI-CONST.'

  • SectionChief(RPB/C)-

'

s

'* MIS System-

  • R&SPB- .

'*D. Weiss, RM/ALF

'

  • RIV File

^

. R. Pirfo,. ELD

  • RSTS Operator-'

.

  • R'. G.. Taylor, RPB/C;

"*RSB

  • Project 1 Inspector.
  • R. Hall
  • P.

Kadambi',LNRR'

M. Emerson

,

'*W. McNeill

<

,

  • w/766

"r

"

,

i

1

i

,

'

L

'$

.