ML20215A809

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-425/87-22 on 870419-0518.No Violations or Deviations Noted
ML20215A809
Person / Time
Site: Vogtle 
Issue date: 05/28/1987
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20215A811 List:
References
NUDOCS 8706170093
Download: ML20215A809 (2)


See also: IR 05000425/1987022

Text

r

(

g.

1

l

4

1

i

MAY r8 gggy

Docket No. 50-425

License No. CPPR-109

peorgia Power Company

/ ATTN:

Mr. James P. O'Reilly

Senior Vice President-Nuclear

,

Operations

P. O. Box 4545

.

Atlanta, GA 30302

i

!

Gentlemen:

SUBJECT:

INSPECTION REPORT NO. 50-425/87-22

This refers to the Nuclear Regulatory Commission (NRC) intpection conducted by

Mr. H. H. Livermore on April 19 through May 18, 1987. The inspection included

i

a review of activities authorized for your Vogtle facility. At the conclusion

~

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

The response directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

1

i

Should you have any questions concerning this letter, please contact us.

Sincerely,

i

f

g. d S

%OM70093 h05

000425

gpOCK

PDR

Thomas A. Peebles, Acting Chief

a

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

l

Inspection Report

'

cc w/ench.

(See page 2)

I

{

Q 1svI

{

3

.-

,

,

Georgia Power Company

2

) g jgy;

c w/ enc 1:

R. E. Conway, Senior Vice President &

j Project Director

l

/ . Whitney, General Manager Project

Support

P. D. Rice, Vice President, Project

j Engineering

/R.H.Pinson,VicePresident, Project

J

j Construction

j

,/C. W. Hayes, Vogtle Quality

/ Assurance Manager

i

V G

B. Bockhold, General Manager,

j Nuclear Operations

A.Gucwa, Manager,NuclearSafety

.

and Licensing

l

A. Bailey, Project Licensing

'

/ Manager

,

f3. W. Churchill, Esq. , Shaw,

/ ittman, Potts and Trowbridge

j

P

VS. E. Joiner, Troutman, Sanders,

l

/ ockerman and Ashmore

L

0

9 . G. Ledbetter, Commissioner,

/

/ Department of Human Resources

VC. H. Badger, Office of Planning

and Budget

D. Kirkland, III, Counsel,

1

Office of the Consumer's Utility

j

Council

D. Feig, Georgians Against

Nuclear Energy

. B. Margulies, Esq., Chairman,

V

Atomic Safety and Licensing Board

/ Panel

VDr. O. H. Paris, Administrative Judge

,

Atomic Safety and Licensing Board

)

Panel

i

'

G. A. Linenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

Panel

Acc w/ encl:

/E. Reis, 0GC

. M. Hill, IE

. Miller, NRR

W. Brach, EDO

M. Sinkule, RII

E. Christnot, RII

/RCResidentInspector

'

Document Control Desk

State of Georgia

<*JI

R

RII

w

,e

EChristnot:

MSinkule

5/28/B7

5/28/87