ML20215A459

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/87-13 on 870501-31.No Violations Noted.Status of Previously Identified Items Discussed in Paragraph 2 of Rept
ML20215A459
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/11/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20215A462 List:
References
NUDOCS 8706160669
Download: ML20215A459 (2)


See also: IR 05000267/1987013

Text

r

i

l7.' ,

JUN 11 1987

,

In Reply Refer To:

Docket:

50-267/87-13

Public Service Company of Colorado

ATTN:

Robert 0. Williams, Jr.

Vice President, Nuclear

Operations

.P. 0. Box 840

Denver, Colorado

80201

Gentlemen:

This refers to the inspection conducted.by Messrs. R. E. Farrell, P. W. Michaud,

and M. E. Skow of this office during the period May 1-31, 1987, of activities

authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear

Generating Station, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included licensee action on previous

inspection findings, operational safety verification, maintenance,.

surveillance, licensee action on 10 CFR 21 reports, IE Bulletins and Generic

Letters, ESF system walkdown, and plant operations review committee. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

NRC inspectors. The inspection findings are documented in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

e706160669 B7 M h67

PDR

ADOCK O

G

PDR

Odginal Slgned By

J. E. Gagliardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

(seenextda

)

!

PIf//[/

/A

C:RPB

g}h

ME5kow

JP

Hon

JEGagl

do

'

& / 8/87

J/87

t,' /10/

'

i

- -

. . - _ ,

- _ _ _ . - - . . -

- _

_ . ,

-

- . . , .- - . . , . . . - - - . . , _ . . - . ,~.- - -.

' ,

'

.

Public Service Company of Colorado

-2-

Enclosure:

Appendix - NRC Inspection Report

50-267/87-13

cc w/ enclosure:

Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Generating Station

16805 WCR 19 1/2

Platteville, Colorado

80651

P. Tomlinson, Manager, Quality

Assurance Division

(Same Address)

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB

R. D. Martin, RA

  • RRI

DRSP

  • Section Chief (RPB/A)
  • RIV File
  • Section Chief (RSB/ES)
  • R&SPB
  • RSTS OPERATOR
  • MIS System
  • RSB
  • Project Inspector
  • D. Weiss, RM/ALF
  • R. Hall
  • NRR Project Manager
  • w/766

I

)

,

I

-

,

-

,

-,

-,

-=r

---