ML20214X365
| ML20214X365 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 06/10/1987 |
| From: | Russell W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20214X369 | List: |
| References | |
| NUDOCS 8706160441 | |
| Download: ML20214X365 (2) | |
See also: IR 05000213/1986099
Text
..
.
.
_
. . - .
-
_ _ . _ - - . _ - _ _
_ .
-.
_.
.
.
.
~
.j.,
, z.4
J
'
y {$1
-
+
.
. .
,
' Docket'No. 50-213
1 Connecticut Yankee Atomic Power Company
ATTN:- Mr. E. J. Mroczka
~
,
Senior Vice President - Nuclear
Engineering.and Operations Group
- P. O. Box 270'
' Hartford,~ Connecticut 06101
' Gentlemen:
ISubject:
Systematic. Assessment of Licensee Performance (SALP) Report No.
.'
'50-213/86-99.
<
I0r M9y 14, 1987,Jas documented in the enclosed SALP Board Report, the NRC Region
m
~I SALP Board assessed the performance of.the Haddam Neck Nuclear Power Station for
the period from March-1, 1986 through March 31, 1987. The SALP Board found gener-
- ally acceptable. performance which was-directed toward safe operation ~.
However,
.because Plant Operations. received a Category 2. rating and Fire Protection 'was rated
as Category 3, overall facility performance has declined since the:last SALP.
h'
'.A meeting at the Haddam Neck Site has been separately scheduled to discuss both
the Haddam Neck and the Millstone Unit 3' assessments.
(The Millstone Unit-3 SALP'
Board report was previously forwarded to'you by letter dated:May 14, 1987.) This'
-meeting is intended to provide a forum for candid discussions of the performance
evaluation.- At the meeting, you should be prepared to discuss our assessments,
- your' plans to-improve performance, and the status
- of your corrective ~ action program
for Fire Protection.
Additionally, you may provide written comments within'30 days
!
after the meeting.
'
,
,
Following our meeting and. receipt of-your response (s), the SALP reports and your
4
7
response (s).will be placed~in the NRC Public Document Room.
F
j
'Thank you for your letter dated March 10, 1987 informing us of the implementation
of corrective actions on the previous Haddam Neck SALP. report.
-
i
Your cooperation is appreciated,
i
4
Sincerely,
,
prisiaal siened By
.
William T. Russell
l
Regional Administrator
n
Enclosure:
NRC Region I SALP Report 50-213/86-99
,
}
.,
8706160441 370610
sa aac" a'*in' i
}#
l
II
1
-_-
_ _ . _ . _ . _ _ ._ _ -_ _ ..,_ ._ _ _,_..__ _ _ __.
,.. _ ,._ _
-
_
_
,
. .,: . .f4
- ,o..
- y.
Connecticut Yankee Atomic Power Company 2
M 10 W
cc w/ enc 1:
.D. B. Miller,' Station Superintendent
-
D. O. Nordquist, Manager of' Quality Assurance
R. Kacich, Generation Facilities Licensing
'W. D. Romberg, Vice President, Nuclear Operations
. Gerald Garfield, Esquire
.
Public Document Room (PDR).
Local Public Document-Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
Chairman Zech
Commissioner ~ Roberts
Commissioner Bernthal
l Commissioner-Asselstine
Commissioner Carr
INP0 (Record Center,-INPO)
bec w/ enc 1:
Region I Docket Room-(with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
W. Russell, RI
K. Abraham, RI (2 copies)
T. Martin, RI
W. Johnston, RI
Management Meeting Attendees
N
ra-
RI: RP
RI RP
R
X
RI:RA
Swetland/meo
McCabe
Wenzinger
r%
1
Russell
St/28/87
$l1T
612.
f
'
0FFICIAL RECORD COPY
RI:DRP
Collins