ML20214X365

From kanterella
Jump to navigation Jump to search
Forwards SALP Rept 50-213/86-99 for Mar 1986 - Mar 1987. Plant Operations Received Category 2 Rating & Fire Protection Rated as Category 3.Overall Performance Declined Since Last Rept.Meeting Scheduled to Discuss Assessments
ML20214X365
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/10/1987
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20214X369 List:
References
NUDOCS 8706160441
Download: ML20214X365 (2)


See also: IR 05000213/1986099

Text

..

.

.

_

. . - .

-

_ _ . _ - - . _ - _ _

_ .

-.

_.

.

.

.

~

.j.,

, z.4

J

'

y {$1

-

+

.

. .

,

' Docket'No. 50-213

1 Connecticut Yankee Atomic Power Company

ATTN:- Mr. E. J. Mroczka

~

,

Senior Vice President - Nuclear

Engineering.and Operations Group

P. O. Box 270'

' Hartford,~ Connecticut 06101

' Gentlemen:

ISubject:

Systematic. Assessment of Licensee Performance (SALP) Report No.

.'

'50-213/86-99.

<

I0r M9y 14, 1987,Jas documented in the enclosed SALP Board Report, the NRC Region

m

~I SALP Board assessed the performance of.the Haddam Neck Nuclear Power Station for

the period from March-1, 1986 through March 31, 1987. The SALP Board found gener-

ally acceptable. performance which was-directed toward safe operation ~.

However,

.because Plant Operations. received a Category 2. rating and Fire Protection 'was rated

as Category 3, overall facility performance has declined since the:last SALP.

h'

'.A meeting at the Haddam Neck Site has been separately scheduled to discuss both

the Haddam Neck and the Millstone Unit 3' assessments.

(The Millstone Unit-3 SALP'

Board report was previously forwarded to'you by letter dated:May 14, 1987.) This'

-meeting is intended to provide a forum for candid discussions of the performance

evaluation.- At the meeting, you should be prepared to discuss our assessments,

your' plans to-improve performance, and the status
of your corrective ~ action program

for Fire Protection.

Additionally, you may provide written comments within'30 days

!

after the meeting.

'

,

,

Following our meeting and. receipt of-your response (s), the SALP reports and your

4

7

response (s).will be placed~in the NRC Public Document Room.

F

j

'Thank you for your letter dated March 10, 1987 informing us of the implementation

of corrective actions on the previous Haddam Neck SALP. report.

-

i

Your cooperation is appreciated,

i

4

Sincerely,

,

prisiaal siened By

.

William T. Russell

l

Regional Administrator

n

Enclosure:

NRC Region I SALP Report 50-213/86-99

,

}

.,

8706160441 370610

sa aac" a'*in' i

}#

l

II

1

-_-

_ _ . _ . _ . _ _ ._ _ -_ _ ..,_ ._ _ _,_..__ _ _ __.

,.. _ ,._ _

-

_

_

,

. .,: . .f4

,o..

- y.

Connecticut Yankee Atomic Power Company 2

M 10 W

cc w/ enc 1:

.D. B. Miller,' Station Superintendent

-

D. O. Nordquist, Manager of' Quality Assurance

R. Kacich, Generation Facilities Licensing

'W. D. Romberg, Vice President, Nuclear Operations

. Gerald Garfield, Esquire

.

Public Document Room (PDR).

Local Public Document-Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

Chairman Zech

Commissioner ~ Roberts

Commissioner Bernthal

l Commissioner-Asselstine

Commissioner Carr

INP0 (Record Center,-INPO)

IE SALP Coordinator

bec w/ enc 1:

Region I Docket Room-(with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

W. Russell, RI

K. Abraham, RI (2 copies)

T. Martin, RI

W. Johnston, RI

Management Meeting Attendees

N

ra-

RI: RP

RI RP

R

X

DRA

RI:RA

Swetland/meo

McCabe

Wenzinger

r%

1

Russell

St/28/87

$l1T

612.

f

'

0FFICIAL RECORD COPY

RI:DRP

Collins