Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-423/86-27
ML20214W976
Person / Time
Site: Millstone 
Issue date: 12/05/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8612100489
Download: ML20214W976 (2)


See also: IR 05000423/1986027

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ .

,

DEC 0 5 iSS5

'

.

Docket No.

50-423

Northeast Nuclear Energy Company

ATTN:

Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection No. 50-423/86-27

We acknowledge receipt of your letter dated November 13, 1986, in response to

.

our letter dated October 15, 1936.

Thank you for informing us of the corrective and preventive actions documented

in your letter. These actions will be examined during a future inspection of

your licensed program.

l

Your cooperation with us is appreciated.

Sincerely,

0

'

C ? "U'ol

. Martin, Direct

Division of Radiation Safety

and Safeguards

cc:

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurarice

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

8612100489 861205

PDR

ADOCK 05000423

G

PDR

OFFICIAL RECORD COPY

RL MILL 3 86-27 - 0001.0.0

12/04/86

fCM

h

._.

_

..

.

.

bec

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

L. Prividy, RI, BV-2

T. Rebelowski, SRI, Millstone 1&2

8. Doolittle, LPM, NRR

Robert J. Bores, DRSS

,

i

R: RSS

I

S

RI

SS

Miller /mlb

Weadock

Iak

Bellamy

12///86

11/I/86

11/S/86

IV3 /86

0FFICIAL RECORD COPY

RL MILL 3 86-27 - 0002.0.0

11/26/86

- . - -

.

. . -

- -

-

..

---.

. . -

.-

.-

,-

_ . - .

. _ _ - -

/

-

-

.

.

. .

.

NORTHEAST UTILITIES

o.n r.i Orric.. seiden sir i. seriin. conn cticut

1

)'iUNIsYaNUm~v

P.O. BOX 270

.aos **'s.*oata w

HARTFORD, CONNECTICUT 06141-0270

L

t

",S"',jj',[",[,'g",

(203) 665-5000

November 13,1986

Docket No. 50-423

A06152

H2327

<

Mr. Thomas T. Martin, Director

Division of Radiation Safety and Safeguards

' -

'

Region 1

U.S. Nuclear Regulatory Commission

' . , .

631 Park Avenue

- -

King of Prussia, Pennsylvania 19406

-

,

Dear Mr. Martin:

'

Millstone Nuclear Power Station, Unit No. 3

Responte to I&E Inspection Report No. 50-423/86-27 '

In Reference (1), Northeast Nuclear Energy Company (NNECO) was requested to

review three (3) items identified during an inspection conducted from August 18

through August 22,1986, by your office at Millstone Unit No. 3. A response was

to be submitted within thirty (30) days of receipt of Reference (1) on corrective

actions taken or planned in regard to the identified items.

NNECO hereby submits information concerning actions taken or planned in

regard to three items identified as 86-27-01, 86-27-04 and 86-27-06 in the

referenced inspection report.

1)

86-27-01 (Paragraph 4.3.1)

The equipment problems identified during the performance test must be

' ,

'

resolved to ensure PASS sampling capability. In addition, the schedule

for correcting these problems should be provided as requested during the

exit interview.

A.

Leakage in the dissolved gas sampling line.

Response:

1

A plant trouble report (4M3100340) has been generated. Any corrective

actions necessary will be completed by March 31,1987.

B.

Flushing pump tripped five times during performance test.

Oh

.

.

,

. .

.

-2-

.

Response:

A plant modification request (3-86-506) has been generated.

An

engineering evaluation and recommendation for resolution is expected to

be completed by December 31,1986.

C.

Pressure indicator was slow to respond and did not stabilize.

Response:

The pressure indicator was serviced and it was found to function

properly.

D.

Operation of a valve (V-46) which isolates the containment

atmosphere sampling line was hampered for one hour when its

reach rod pin was sheared.

Response:

The pin was replaced.

A plant modification request (3-86-597) was

generated.

An engineering evaluation and recommendations for

resolution is expected to be completed by December 31,1986.

E.

PASS instrumentation was on a 2n year calibration frequency

which was in excess of the vendor recommended frequencies.

Response:

The calibration frequency has been changed to 18 months, which was

agreed to by the inspection team.

2)

86-27-04 (Paragraph 6.4)

o

Improve laboratory procedures for the handling and analysis of

high level samples.

o

Demonstrate that plant personnel can collect, replace and

transport samples within GDC-19 limits.

o

incorporate silver zeolite filters in lieu of charcoal prior to

switchover to silver loaded silica gel, in order to reduce potential

radiation levels due to retained noble gases and to assure a

representative sampling technique.

These items will be reviewed during a future inspection. In addition, the

schedule for this item should be provided as requested during the exit

interview.

Response:

An engineering evaluation is being conducted to address the above items.

It is NNECO's intention to complete the evaluation by December 31,

1986 and to implement the recommendation by March 31,1987.

,

.

.

. - -

.

,3,

,

3)

86-27-06 (Paragraph 7.3)

The licensee was requested to include in their response to this inspection

a description of their intended actions to ensure station radiation

monitor calibration procedures were effectively

reviewed and

implem,ented. This item will remain open and be reviewed in a future

inspection.

'

Response:

The radiation monitor calibration procedures for Millstone Unit Nos.1,2

and 3 will be reviewed for consistency and correctness. It is NNECO's

intention to complete the review of these procedures by December 31,

,

1986 and to implement recommendations by March 31,1987.

We trust the above information satisfactorily responds to your request.

Very truly yours,

NORTHEAST NUCLEAR ENERGY COMPANY

t-

3.F. Opeka

Senior Vice President

,

By: R. W. Bishop

Secretary

,

.__

_