ML20214W927
| ML20214W927 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/04/1987 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| Shared Package | |
| ML20214W931 | List: |
| References | |
| NUDOCS 8706160252 | |
| Download: ML20214W927 (3) | |
See also: IR 05000424/1987033
Text
_ - - _ _ _ _ _ -
_ _______ _ __- - _ _ ____ _______ _____ __ __ _ ______ - ___ _ _ ____ ___ _ ___ _
. _ _ _ _ _
.
. bM
.
.*
4
'
3@ 0
Docket No. 50-424
i
License No. NPF-61
j
Georgia Power Company
.
ATTN: Mr. James P. O'Reilly
.
i
Senior Vice President-
Nuclear Operations
t
P. O. Box 4545
l
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-424/87-33
ThisreferstotheNuclearRegulatoryCommission(NRC)inspectionconductedby
P. T. Burnett on May 5-8, 1987. The inspection included a review of activities
authorized for your Vogtle 1 facility. At the conclusion of the inspection,
the findings were discussed with those members of your staff identified in the
,
'
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
>
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
.
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
[
will be placed in the NRC Pubite Document Room.
'
!
Should you have any questions concerning this letter, please contact the
Division of Reactor Projects Section Chief.
Sincerely,
ORIGINAL SIGNto SY
I
ALAN R. HERDT
!
el g
PD4
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
Enclosure
NRC Inspection Report
cc w/ enc 1:
(Seepage 2)
!
-rg*(/
.
JUN 0 4 1987
,s
Georgia Power Company
2
,
cc w/ enc 1:
R. E. Conway, Senior Vice President &
Project Director
C. Whitney, General Manager Project
Support
P. D. Rice, Vice President, Project
Engineering
R. H. Pinson, Vice President, Project
Construction
C. W. Hayes, Vogtle Quality
Assuranco Manager
G. B. Dockhold, General Manager,
Nuclear Operations
L. Gucwa, Manager, Nuclear Safety
and Licensing
J. A. Dailey, Project Licensing
Manager
D. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
J. E. Joiner, Troutman, Sanders,
Lockerman and Ashmoro
J. G. Ledbetter, Commissioner,
Department of Human Resourcos
C. H. Badger, Office of Planning
and Budget
D. Kirkland, III, Counsel,
Office of the Consumor's Utility
Council
D. Felg, Georgians Against
Nuclear Energy
M. B. Margultos, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
G. A. Linenborger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
Panol
bec w/ encl:
(500 page 3)
-
.
-
-
.
-
-
-
-
F
JUN O 4 W
,. .
Georgia Power Company
3
bec w/ encl:
E. Reis, 0GC
W. M. Hill, IE
M. Miller, NRR
W. Brach, ED0
M. Sinkule, RI!
E. Christnot, RI!
NRC Resident Inspector
Document Control Desk
State of Georgia
R
R!l
RI!d//
j,
P urnott:or
F,Ja e
Msinkyto
05u487
OW /07
05/f/81