Establishes Protocol for Util Licensing Representative F Stetson of NUS Interface W/Nrc,Per
ML20214W866
Person / Time
Site: Rancho Seco
Issue date: 06/08/1987
From: Miraglia F
Office of Nuclear Reactor Regulation
To: Andognini J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 8706160220
Download: ML20214W866 (6)


Text

I "

Docket No.:~-50-312 DISTRIBUT 1N.

- .F PD5 Plant File NRC & Local PDRs Mr. lJ. Carl Andognini DMCrutchfield Chief Executive.0fficer, Nuclear GMHolahan Sacramento Municipal. Utility District JLee.

14440 Twin Cities Road. GKalman Herald, California' 95638-9799 OGC-Bethesda EJordan

Dear Mr. Andognini:

JPartlow ACRS (10)

SUBJECT:

- WASHINGTON AREA LICENSING REPRESENTATIVE In a letter dated April 15. 1987, you designated Mr. Fred Stetson of'NUS as the Washington area SMUD Licensing Representative. In the past, we have interfaced with local licensing representatives from other utilities and, based on that experience, we feel that Mr. Stetson can be effective in expediting the large number of interactions between SMUD and the NRC staff during the ongoing Rancho Seco restart effort.

To ensure that we continue to maintain centralized control of the restart proceedings as well as ensuring proper regulatory oversight of all licensing issues, we would like to. establish the following protocol for Mr. Stetson's interface with the NRC staff. All contacts with the staff must be coordinated through the NRC project manager assigned to Rancho Seco. . Contacts with the staff include face-to-face meetings, telecons, and document transfers.

Whenever possible, meetings should be scheduled at least'one week in advance to allow sufficient time for releasing the-schedule to the general public.-

If there~are any questions regarding this matter, please' contact Mr.GeorgeKalman(301-492-8593), the NRC project manger assigned to Rancho Seco.

i:  !#4paal Signed By:

hd44 FrankJ.Mf[agli;n Associate Director for Projects Office of Nuclear Reactor Regulation cc: See next page i

s'706160220 8706087 DR ADOCM 0 3y2

  • See previous concurrence
  • DRSP/PDV *DRSP/D:PDV *DRSP/AD *DRSP/D P GKalman:cd GWKnighton GMHolahan DMCrutchfield JW gl I 6/1/87 6/1/87 6/2/87 6/4/87 87-OFFICIAL RECORD COPY

V .4 Mr. G. Carl Andognini Rancho Seco Nuclear Generating Chief Executive Officer Nuclear Station Sacramento Municipal Utility District cc:

Mr. David S. Kaplan, Secretary Mr. John Bartus and General Counsel Ms. JoAnne Scott Sacramento Municipal Utility Federal Energy Regulatory Commission District 825 North Capitol Street, N. E.

6201 S Street Washington, D.C. 20426 P. O. Box 15830 Sacramento, Califcrnia 95813 Thomas A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C. 20037 Mr. John V. Vinguist Acting Manager, Nuclear Licensing Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station 14440 Twin Cities Road Herald, California 95638-9799 Mr. Robert B. Borsum .

Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Resident Inspector / Rancho Seco c/o U. S. N. R. C.

14440 Twin Cities Road Herald, California 95638 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Joseph 0. Ward, Chief Radiological Health Branch -

State Department of Health Services 714 P Street, Office Building #8 Sacramento, California 95814 Sacramento County Board of Supervisors 827 7th Street, Room 424 Sacramento, California 95814 Ms. Helen Hubbard P. O. Box 63 Sunol, California 94586

LDocket No.: 50-312 DISTRIBUTION Docket File PD5 Plant File NRC & Local PDRs Mr. J. Carl Andognini DMCrutchfield Chief Executive Officer, Nuclear GMHolahan Sacramento Municipal Utility District. JLee 6201 S. Street GKalman Post Office Box 15830 OGC-Bethesda EJordan

Dear Mr. Andognini:

JPartlow ACRS(10)

SUBJECT:

WASHINGTON AREA LICENSING REPRESENTATIVE In_a letter dated April 15, 1987, you designated Mr. Fred Stetson of NUS as the Washington area SMUD Licensing Representative. In the past, we have interfaced with local licensing representatives from other utilities and, based on.that experience, we feel that Mr. Stetson can be effective in expediting the large number of interactions between SMUD and the NRC staff during the ongoing Rancho Seco restart effort.

To ensure that we continue to maintain centralized control of the restart proceedings as well as ensuring proper regulatory oversight of all licensing issues we would like to establish the following protocol for Mr. Stetson's interface with the NRC staff. All contacts with the staff must be coordinated through the NRC project manager assigned to. Rancho Seco. Contacts with the staff include face to face meetings, telecons, and document transfers.

Whenever possible, meetings should be scheduled at least one week in advance

~to allow sufficient time for releasing the schedule to the general public.

If there are any questions regarding this matter, please contact Mr. George Kalman, (301-492-8593) the NRC project manger assigned to Rancho Seco.

Frank J. Miraglia Associate Director for Projects Office of Nuclear Reactor Regulation cc: See next page

  • See previous concurrence k

/

  • DRSP/PDV *DRSP/D:PDV 'D P/ D DR NRR/ADP GKalman:cd GWKnighton GMHolahan DMCrutchfield FJMiraglia 6/1/87 6/1/87 6/ /87 6/(.[/87 6/ /87 0FFICIAL RECORD COPY

,y-Docket No.: 50-312 DISTRIBUTION Docket File PD5 Plant File NRC & Local PDRs Mr. J. Carl Andognini DMCrutchfield Chief Executive Officer, Nuclear GMHolahan Sacramento Municipal Utility District -JLee 6201 S. Street GKalman Post Office Box 15830 OGC-Bethesda EJordan-

Dear Mr. Andognini:

- JPartlow ACRS(10)

SUBJECT:

WASilINGTON AREA LICENSING REPRESENTATIVE In a letter dated April 15, 1987, you designated Mr. Fred Stetson of NUS as the Washington area SMUD Licensing Representative. In the past, we have interfaced with local licensing representatives from other utilities and, based on that experience, we feel .that Mr. Stetson can be effective in expediting the large number of interactions between SMUD and the NRC staff during the ongoing Rancho Seco restart effort.

To ensure that we continue to maintain centralized control of the restart proceedings as well as ensuring proper regulatory oversight of all licensing issues we would like to establish the following protocol for Mr. Stetson's interface with the NRC staff. All contacts with the staff must be coordinated through the NRC project manager assigned to Rancho Seco. Contacts with the staff include face to face meetings, telecons, and document transfers.

Whenever possible, meetings should be scheduled at least one week in advance-to allow sufficient time for releasing the schedule to the general public.

If there are any questions regarding this matter, please contact Mr. George Kalman,(301-492-8593) the NRC project manger assigned to Rancho Seco.

Frank J. Miraglia Associate Director for Projects cc: See next page

  • See previous concurrence
  • DRSP/PDV DRS$ NDV DRSP/AD DRSP/D NRR/ADP GKalman:cd GWRb ghton GMHolahan DMCrutchfield FJMiraglia 6/1/87 6/l /87 6/ /87 6/ /87 6/ /87 0FFICIAL RECORD COPY

.s I

Docket No.:- 50-312 DISTRIBUTION Docket File PD5 Plant File NRC & Local PDRs Mr. J. Carl Andognini DMCrutchfield Chief Executive Officer, Nuclear GMHolahan

-Sacramento Municipal Utility District JLee 6201 S. Street GKalman Post Office Box 15830 OGC-Bethesda EJordan

Dear Mr. Andognini:

JPartlow ACRS(10)

SUBJECT:

WASHINGTON AREA LICENSING REPRESENTATIVE In a letter dated April 15, 1987, you designated Mr. Fred Stetson of NUS as the Washington area SMUD Licensing Representative. In the past, we have interfaced with local licensing representatives from other utilities and, based on.that experience, we feel that Mr. Stetson can be effective in steam-lining the large number of interactions between SMUD and the NRC staff during the ongoing Rancho Seco restart effort.

To ensure that we continue to maintain centralized control of the restart proceedings as well as ensuring proper regulatory oversight of all licensing issues we would like to establish the following protocol for Mr. Stetson's interface with the NRC staff. All contacts with the staff must be coordinated through the NRC project manager assigned to Rancho Seco. Contacts with the staff include face to face meetings, telecons, and document transfers.

Whenever possible, meetings should be scheduled at least one week in advance to allow sufficient time for releasing the schedule to the general public.

If there are any questions regarding this matter, please contact Mr. George Kalman,(301-492-8593) the NRC project manger assigned to Rancho Seco.

Frank J. Miraglia Associate Director for Projects cc: See next page DRS V DRSP/D:PDV DRSP/AD DRSP/D NRR/ADP GKilman:cd GWKnighton GMHolahan DMCrutchfield FJMiraglia l 6///87 6/ /87 6/ /87 6/ /87 6/ /87 '

0FFICIAL RECORD COPY l

1

c L

Document Name: SMUD LICENSING REPRESENTATIVES Requestor's ID: DAWSON Author's Name: GKalman

-MEMORANDUM FOR: James Carl Andognini

SUBJECT:

WASHINGTON AREA LICENSING REPRESENTATIVE ROUTING Initials Date I. J. Lee

2. G. Kalman
3. G.W. Knighton
4. Secretary / Dispatch CAN THIS BE DELETED AFTER DISPATCH? YES NO.

I