Forwards Insp Rept 50-267/87-12 on 870518-20.No Violations or Deviations Noted.One Unresolved Item Discussed in Paragraph 7 of Rept
ML20214W497
Person / Time
Site: Fort Saint Vrain 
Issue date: 06/08/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20214W500 List:
References
NUDOCS 8706160054
Download: ML20214W497 (2)


See also: IR 05000267/1987012

Text

-

_-___

.

.

.

JUN 8

1987

>

.

,

In Reply Refer To:

Docket:

50-267/87-12

Public Service Company of Colorado

ATTN:

R. O. Williams, Jr.

Vice President, Nuclear

Operations

P. O. Box 840

Denver, Colorado

80201

Gentlemen:

This refers to the team inspection led by Mr. R. E. Ireland of this office

during the period May 18-20, 1987, of activities authorized by NRC Operating

License DPR-34 for the Fort St. Vrain Nuclear Generating Station, and to

discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included the installation of the steam

line rupture detection and isolation system, preventive and predictive

maintenance for control rod drive and orificing assemblies, fire protection,

licensee actions to correct spurious instrument trips, and reactor moisture

monitor penetrations. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors.

The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

One unresolved item is discussed in paragraph 7 of the attached inspection

report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

8706160054 87 g h

w,w s,g e

PDR

ADOCK O

PDR

4Ew

G

\\

J. E. Gagliardo, Chief

vF

) Reactor Projects Branch

,

'ti

Enclosure:

(see next page)

l

g'

PIfg/

AC:RSB

C: P /A

NRR

I'N

-

l

on gDJKubickiNRR kAff

,

MESkow/dp

REIreland

JJ don

KLHei ner

JFJa

HLAsk

/

6 / 3 /87

(, f/87

fl /87

/S/87

/ /

4 / 5'/87

6 ff 87 /

n

v

Galirdopv[

(Dj

NRR c

R

g

IPargzews i

a

p{(S'!874${ff

I !87

lim

i (

,

-

-

-

- - -

-

-

- - .

_..

c.

.-.

.

.

. .

.

<

-

.

<

,'

~.

.

.

1

Public Service Company of Colorado

-2-

t

Enclosure:

<

Appendix - NRC Inspection' Report

50-267/87-12

cc w/ enclosure:

!

.

Manager, Nuclear Production Division

. Fort St. Vrain Nuclear' Station

16805 WCR 19

Platteville, Colorado.

80651

'

P..Tomlinson, Manager,-Quality

.

Assurance Division

-

I

(same address)'

~

.

,

Colorado Radiation Control Program Director

Colorado 1Public Utilities Commission

bec to DMB (IE01)

bec distrib. by RIV:

1

  • RPB

DRSP

2

  • RRI

R. D. Martin, RA

  • Section Chief (RPB/A)
  • RSB
  • Section Chief (RSB/ES)
  • Project Inspector, RPB

RPSB

  • D. Weiss, RM/ALF
  • MIS System
  • R. Hall

,

  • RSTS Operator

NRR Project Manager

.

  • RIV File
  • w/766

.

,

,

-.

-

.,

i,

., ,

- , , _ __

, . ,.