ML20214W213

From kanterella
Jump to navigation Jump to search
Amends 101 & 130 to Licenses DPR-71 & DPR-62,respectively, Revising Tech Specs,Section 3/4.6.3,Table 3.6.3-1 to Extend Allowable Isolation Time for RCIC Sys Steam Isolation Valves from 20 to 30
ML20214W213
Person / Time
Site: Brunswick  
Issue date: 12/04/1986
From: Muller D
Office of Nuclear Reactor Regulation
To:
Carolina Power & Light Co
Shared Package
ML20214W215 List:
References
DPR-62-A-130 NUDOCS 8612100128
Download: ML20214W213 (8)


Text

.

'o UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

y

,1 wAsHmGTON. D. C. 20665 "s.,...../

CAROLINA POWER & LIGHT COMPANY DOCKET N0. 50-325 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 101 License No. DPR-71 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Carolina Power & Light Company (thelicensee)datedSeptember 12, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-71 is hereby amended to read as follows:

8612100128 861204 PDR ADOCK 05000324 p

PDR

.f W

c es (2) Technical Specifications q

7 The Technical Specifications contained in Appendices A'and B, as revised through Amendment No, 101, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of its issuance.g FOR THE NUCLEAR REGULATOP.Y COMMISSION U

w

+

Daniel R. Muller, Dire'etor l

BWR Project Directorate #2 DivisionofBWRLicenspg

Attachment:

Changes to the Technical Specifications f

Date of Issuance: December 4, 1986 r

' \\',

i

{

i t

'i t

4 s

i

)

k i

t

+

ATTACHMENT TO LICENSE AMENDMENT NO. 101 FACILITY OPERATING LICENSE N0. DPR-71 DOCKET N0. 50-325 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.

Pages 3/4 6-15

.i

-~, -

. ~.... -

TABLE 3.6.3-1 (Continued)

E E

PRIMARY CONTAINMENT ISOLATION VALVES E

5 ISOLATION TIME Il VALVE FUNCTION VALVE GROUP (Seconds) 1 E

HPCI steam line isolation valves 4

50 U

E41-F002 E41-F003 HPCI torus suction isolation valves 4

80 E41-F042 E41-F041 l

RCIC steaa line isolation valves 5

30 E51-F007 E51-F008

{

Dryvell purge exhaust backup valve 6

15 CAC-V10 i

G Containment air purge isolation valve 6

15 CAC-VIS Suppression chamber vent valve 6

15 CAC-V22 Dryve11 purge exhaust valve 6

15 CAC-V23 f

Nitrogen makeup and inerting inlet valve 6

15 g

CAC-V4 y

g a

M h

k Suppression chamber inerting inlet valve 6

15 CAC-V5 V

0 s

  1. pa atooq'o UNITED STATES g

8 NUCLEAR REGULATORY COMMISSION o

D E

WASHINGTON, D. C. 20655

%,..... p i

l CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-324 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 130 License No. DPR-62 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Carolina Power & Light Company (the licensee) dated September 12, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this arandment is in accordance with 10 CFR Part 51 l

of the Comission's regulations and all applicable requirements i

have been satisfied.

l 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-62 is hereby amended to read as follows:

l I

l l

. (2)TechnicalSpecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.130, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be ir:plemented within 60 days of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION JA s

Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: December 4, 1986

o ATTACHMENT TO LICENSE AMENDMENT N0. 130 FACILITY OPERATING LICENSE NO. DPR-62 DOCKET NO. 50-324 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.

Pages 3/4 6-15 i

a L

l

(BSEP-2-92)

E TABLE 3.6.3-1 (Continued)-

ai U

PRIMARY CONTAINMENT ISOLATION VALVES 5*

ISOLATION TIME I

II VALVE FUNCTION VALVE CROUP (Seconds) z U

HPCI steam line isolation valves 4

,.. c

  • 50 w

E41-F002 E41-F003 HPCI torus suction isolation valves 4

80 E41-F042 E41-F041 RCIC steam line isolation valves 5

30 E51-F007 E51-F008 Drywell purge exhaust backup valve 6

15 CAC-V10 7:

i Containment air purge isolation valve 6

15 y;

CAC-V15 Suppression chamber vent valve 6

15 CAC-V22 Drywell purge exhaust valve 6

15 CAC-V23 N

a an om

-