Forwards Insp Repts 50-327/87-15 & 50-328/87-15 on 870302-06 & Notice of Violation.Nrc Recommended That Until Nuclear Manager Review Group Perform Followup Audit of Corrective Actions Prior to Restart of Either Unit
ML20214W043
Person / Time
Site: Sequoyah  
Issue date: 05/29/1987
From: Zech G
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20214W046 List:
References
NUDOCS 8706150063
Download: ML20214W043 (2)


See also: IR 05000327/1987015

Text

'

~.

.

.

.

.

May 29, 1987

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Tennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSH:CTION REPORT N05. 50-327/87-15 AND 50-328/87-15)

This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by

L. Watson on March 2-6, 1987.

The inspection included a review of activities

authorized for your Sequoyah facility.

At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection were a review of corrective actions taken

to resolve deficiencies in the maintenance programs.

Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observation of activities in progress.

Your attention is specifically directed to paragraph 5 of the inspection

report which discusses the status of the Nuclear Manager's Review Group (NMRG)

audit of maintenance programs.

The NRC recommends that NMRG should perform a

followup audit of corrective actions at Sequoyah prior to restart of either

unit.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

One violation was identified for failure to follow mainte-

nance procedures.

The violation, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

1

of Violation,

i

l

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

,

will be placed in tha NRC Public Document Room.

l

The responses directed by this letter and its enclosures are not subject to the

clecrance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

l

-

G

,

1

N '

.rEo f

_

-

-

..

~

.

.

,

.-

.x

,

,

Tennessee Valley Authority

2

May 29, 1987

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by G. Zech)

Gary G. Zech, Assistant Director,

Inspection Programs

Division of TVA Projects

Office of Special Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encls:

H. L. Abercrombie, Site Director

Sequoyah Nuclear Plant

J. A. Kirkebo, Director

Nuclear Engineering

R. L. Gridley, Director

Nuclear Safety and Licensing

M. R. Harding, Site Licensing

Manager

bec w/encis:

J. G. Keppler, OSP

-S. D. Ebneter, OSP

J. A. Zwolinski, OSP

B. D. Liaw, OSP

S. D. Richardson, OSP

S. R. Connelly, OIA

K. P. Barr, OSP/RII

NRC Resident Inspector

NRC Document Control Desk

State of Tennessee

i

RIL

RII

I

SP RII

LWa tson: r

CJ

an

FMcC y

KE, rr

/87

p

05g /87

J5/p/87

6

5//s/s)