ML20214V886

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Re 870528 Emergency Relief Request on Inservice Testing Program Concerning Four Check Valves on RHR Injection Lines to Hot Leg connections.One- Time Relief Granted
ML20214V886
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/04/1987
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20214V889 List:
References
NUDOCS 8706120362
Download: ML20214V886 (3)


Text

_

Docket No. 50-483 Mr. Donald F. Schnell Vice President - Nuclear Union Electric Company Post Office Box 149 St. Louis, Missouri 63166

Dear Mr. Schnell:

The staff has completed its review of your emergency relief request associated with the Inservice Testing Program, dated May 28, 1987. The request concerned four check valves on the residual heat removal (RHR) injection lines to the hot leg connections.

In accordance with Technical Specification 4.0.5, written relief may be granted by the Commission purs .:nt to 10 CFR 50.55a(g)(6)(i). Our review has determined that the granting o, the relief is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest, giving due consideration +o the burden upcn the licensee that could result if the requirements were imposed on the facility.

Therefore, RHR check valves designated 88-89498, BB-8949C, EJ-8841A and EJ-8841B will be tested at the next refueling outage currently scheduled for September 1987 or the next cold shutdown of sufficient duration, whichever comes first.

The one-time relief requested for the affected four valves is granted. A copy of the related safety evaluation is enclosed.

Sincerely, b,

David L. Wigginton, Acting Project Director Project Directorate III-3 Division of Reactor Projects

Enclosure:

As Stated cc: See next page Office: LA/PDI,II-3 P 00-_ P /PDIII-3 Surname: P ther tg to. DWig nton Date: 0 /87 06/p CE/ /. 06/ 87 8706120362 070604 (

PDR ADOCK 05000403 p PDR i

_________-_-___________a

L; -

Mr. D. F. Schnell Callaway Plant Union Electric Company Unit No. 1 i

cc:

c J. O. Cermak, CFA Inc. Lewis C. Green, Esq.

4 Professional Dr., Suite 110 Green, Hennings & Henry Gaithersburg, MD 20S79 Attorney for Joint Intervenors St. Louis, Missouri 65251 Gerald Charnoff, Esq.

m Thomas A. Baxter, Esq. Ms. Marjorie Reilly Shaw, Pittman, Potts & Trowbridge Energy Chairman of the League of gf 2300 N Street, N. W. Women Voters of Univ. City, MO

. Washington, D. C. 20037 7065 Pershing Avenue University City, Missouri 63130

!.: Mr. G. L. Randolph General Manager, Operations Mr. Donald Bollinger, Member b . Union Electric Company Missourians for Safe Energy Post Office Box 620 6267 Delmar Boulevard Fulton, Missouri 65251 University City, Missouri 63130 U. S. Nuclear Regulatory Commission Mr. Dan I. Colef, President Resident Inspectors Office Kay Drey, Representative RRf1 Steedman, Missouri 65077 Board of Directors Coalition for the Environment St. Louis Region Mr. Donald W. Capone, Manager 6267 Delmar Boulevard Nuclear Engineering University City, Missouri 63130 s '

Union Electric Company Post Office Box 149 St. Louis, Missouri 63166 Chris R. Rogers, P.E.

Manager - Electric Department 301 W. High Post Office Box 360 Jefferson City, Missouri 65102 L

f: Regional Administrator L U. S. NRC, Region III y

799 Roosevelt Road f Glen Ellyn, Illinois 60137 b

Z Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P. O. Box 176 Jefferson City, Missouri 65102 Mr. Bart D. Withers Pesident and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P. O. Box 411 -

p Burlington, Kansas 66839 y  :

9 f

_. {

p

\;;w.  : . ^. . .g --

v4..; ' . , .,> .w- m , rg . .. .

~

s

.n d'. f . ll " . C _. ?w )

... s - _.

1. -'

,, Distribution Copies:

viDechetTFile n t NRC PDR ""*e#24 Local'PDR

, 'PDIII-3 r/f PDIII-3 p/f GHolahan

! PKreutzer I l TAlexion l DWigginton OGC-Bethesda 4 DHagan EJordan JPartlow TBarnhart(4) 1 WandaJones EButcher ACRS(10)

GPA/PA

, ARM /LFMB 1

s t

i i

I 4

W i

_____-_-___--_----__2_-.__--__--__-_-__