ML20214U954
| ML20214U954 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 11/28/1986 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20214U956 | List: |
| References | |
| NUDOCS 8612090467 | |
| Download: ML20214U954 (2) | |
See also: IR 05000352/1986019
Text
..-
.. .., -..~.
~.o.~
.. .. -
PTE,IC%%.9 OZI'.;:AL
' **
O.r',ir' icd BI:
%k
,
NOV 2 81986
Docket No. 50-352
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
Vice President, Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection No. 50-352/86-19
r
This refers to the routine safeguards inspection conducted by Mr. R. J. Bailey
of this office on September 16-19, 1986 at the Limerick Generating Station,
Limerick, Pennsylvania of activities authorized by NRC Licenss No. NPF-39 and
to the discussions of our findings held by Mr. Bailey with Mr. G. Leitch and
Mr. J. Franz of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the " General Statement of
Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C
(EnforcementPolicy). You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
A section of the enclosed inspection report and Appendix A contain details of
your security program that have been determined to be exempt from public
disclosure in accordance with 10 CFR 73.21 (Safeguards Information).
Therefore, the section so identified in the inspection report and Appendix A
will not be placed in the NRC Public Document Room and will receive limited
distribution. This letter and the remaining portions of the inspection report
will be placed in the Public Document Room, in accordance with 10 CFR 2.790(a).
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
v . -.-.
8612090467 861128
tr.AA'
ADOCK 05000352
lL,M
G
1
,
I \\
0FFICIAL RECORD COPY
11/25/86
,
.
$
.
._,n
--nn,
,
..
Philadelphia Electric Company
2
NOV 2 81986
Your cooperation with us is appreciated.
Sincerely,
Or1 1nal Signed By:
8
James H. Joyner
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosure:
1.
Appendix A, Notice of Violation (Contains Safeguards Information (SGI))
2.
NRC Region I Inspection Number 50-352/86-19 (Contains Safeguards
Information in paragraph 11)
cc w/encls (w/o SGI):
V. S. Boyer, Senior Vice President, Nuclear Power
John S. Kemper, Vice President, Engineering and Research
J. Franz, Manager, Limerick Generating Station
Troy B. Conner, Jr., Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/SGI)
Commonwealth of Pennsylvania
bec w/ enc 1s (w/o SGI):
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
Robert J. Bores, DRSS
RI:
R
FI:DRSS
RI:D
Bai ey/bc
Keimij
Joyner
Mar n
11Ar/86
11Df/86 11/4/86 11/
86
0FFICIAL RE RD COPY
11/25/86
-
. -. .
- -
_ .
--.
_ , . - - _ _ __- - .
_
- - .
.