Forwards SALP 6 Board Rept 50-461/86-05 for Sept 1985 - Aug 1986.Meeting Scheduled for 861217 to Discuss Rept
ML20214T557
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/28/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20214T560 List:
References
NUDOCS 8612080631
Download: ML20214T557 (2)


See also: IR 05000461/1986005

Text

-

--

.

,,

Q$

NOV 28198f3

Docket No. 50-461

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

Enclosed for your review prior to our scheduled meeting on December 17,

1986, is the SALP 6 Board Report for the Clinton Power Station covering the

period September 1, 1985, through August 31, 1986.

Several multiple functional areas relating to the plant construction area,

identified separately in previous SALP reports, have been consolidated into

a single " Construction" functional area in this report. This area was rated

Category 2, and represents the successful completion of the construction and

overinspection efforts at the Clinton Power Station.

The Preoperational Test area was rated Category 1, representing an outstanding

effort in test planning, actual testing, and evaluations of results.

Category 3 ratings were given in the areas of (1) Quality Assurance and

Administrative Controls, and (2) Maintenance. As detailed in the report,

multiple weaknesses were identified in controlling the turnover of systems

from construction to testing and operations, and in the area of maintenance

of equipment. We recognize that you have developed corrective actions in

these areas to the point that the NRC issued a license on September 29, 1986,

allowing fuel loading and low power operation. Nevertheless, we request

that you respond in writing with a description of your corrective actions

in these areas including plans and dates for assuring that the actions are,

or will be, fully implemented.

While you will have sufficient opportunity to present your comments at the

meeting on December 17, 1986, you may also make written comments within 30

days after the meeting. We will evaluate any written comments and provide

you with our conclusions relative to them.

8612030631 861128

PDR

ADOCK 05000461

G

PDR

$5

i

,

i

r-

a

Illinois Power Company

2

NOV 2 81986

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the SALP

Report will be placed in the NRC's Public Document Room.

Should you have any questions concerning the SALP Report, we would be pleased

to discuss them with you.

Sincerely,

Crictnal tfenad by

+. m G. V: ;,: -

James G. Keppler

Regional Administrator

Enclosure:

Inspection

Report No. 50-461/86005(DRP)

cc w/ enclosure:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

Gary N. Wright, Manager

Nuclear Facility Safety

Mark Jason, Assistant

Attorney General,

Environmental Control Division

H. S. Taylor, Quality Assurance

Division

David Rosenblatt, Governor's

Office of Consumer Services

J. M. Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

L. W. Zech, Chairman

J. K. Asselstine, Commissioner

F. M.' Bernthal, Comissioner

K. M. Carr, Commissioner

T. M. Roberts, Comissioner

NRR Project Manager

H. L. Thompson, NRR

J. Axelrad, EI and M. R. Johnson, IE SALP Coordinator

RIII PRR

RIII SGA

State Liaison Officer, State of

Illinois

INP0

its

RIl

R II

RIII

R

Q

RII

RIJI

RIII

)

f

RFW

\\f

P

1[

Ja anski/jp

WfnN

Warnick No lius

ieklo

nd

Davis

Ke Igr

fg'Jicformick-Barger

O ///.2gs%

l CA UM /1998

KN0 fgg

A@

p[i

Schweibinz

g

// 6/&4

d