ML20214T557
| ML20214T557 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 11/28/1986 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20214T560 | List: |
| References | |
| NUDOCS 8612080631 | |
| Download: ML20214T557 (2) | |
See also: IR 05000461/1986005
Text
-
--
.
,,
Q$
NOV 28198f3
Docket No. 50-461
Illinois Power Company
ATTN: Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
Enclosed for your review prior to our scheduled meeting on December 17,
1986, is the SALP 6 Board Report for the Clinton Power Station covering the
period September 1, 1985, through August 31, 1986.
Several multiple functional areas relating to the plant construction area,
identified separately in previous SALP reports, have been consolidated into
a single " Construction" functional area in this report. This area was rated
Category 2, and represents the successful completion of the construction and
overinspection efforts at the Clinton Power Station.
The Preoperational Test area was rated Category 1, representing an outstanding
effort in test planning, actual testing, and evaluations of results.
Category 3 ratings were given in the areas of (1) Quality Assurance and
Administrative Controls, and (2) Maintenance. As detailed in the report,
multiple weaknesses were identified in controlling the turnover of systems
from construction to testing and operations, and in the area of maintenance
of equipment. We recognize that you have developed corrective actions in
these areas to the point that the NRC issued a license on September 29, 1986,
allowing fuel loading and low power operation. Nevertheless, we request
that you respond in writing with a description of your corrective actions
in these areas including plans and dates for assuring that the actions are,
or will be, fully implemented.
While you will have sufficient opportunity to present your comments at the
meeting on December 17, 1986, you may also make written comments within 30
days after the meeting. We will evaluate any written comments and provide
you with our conclusions relative to them.
8612030631 861128
ADOCK 05000461
G
$5
i
,
i
r-
a
Illinois Power Company
2
NOV 2 81986
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the SALP
Report will be placed in the NRC's Public Document Room.
Should you have any questions concerning the SALP Report, we would be pleased
to discuss them with you.
Sincerely,
Crictnal tfenad by
+. m G. V: ;,: -
James G. Keppler
Regional Administrator
Enclosure:
Inspection
Report No. 50-461/86005(DRP)
cc w/ enclosure:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
Gary N. Wright, Manager
Nuclear Facility Safety
Mark Jason, Assistant
Attorney General,
Environmental Control Division
H. S. Taylor, Quality Assurance
Division
David Rosenblatt, Governor's
Office of Consumer Services
J. M. Taylor, Director, IE
H. R. Denton, Director, NRR
Regional Administrators
RI, RII, RIV, RV
L. W. Zech, Chairman
J. K. Asselstine, Commissioner
F. M.' Bernthal, Comissioner
K. M. Carr, Commissioner
T. M. Roberts, Comissioner
NRR Project Manager
H. L. Thompson, NRR
J. Axelrad, EI and M. R. Johnson, IE SALP Coordinator
RIII PRR
RIII SGA
State Liaison Officer, State of
INP0
its
RIl
R II
RIII
R
Q
RII
RIJI
RIII
)
f
\\f
P
1[
Ja anski/jp
WfnN
Warnick No lius
ieklo
nd
Davis
Ke Igr
fg'Jicformick-Barger
O ///.2gs%
l CA UM /1998
KN0 fgg
A@
p[i
Schweibinz
g
// 6/&4
d