ML20214T312
| ML20214T312 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/03/1986 |
| From: | Mark Miller Office of Nuclear Reactor Regulation |
| To: | Conway R GEORGIA POWER CO. |
| References | |
| NUDOCS 8612080554 | |
| Download: ML20214T312 (2) | |
Text
.
Docket No.: 50-424 3 DEC 1986 Mr. Richard Conway, Senior Vice President and Project Ger.eral Director Georgia Power Company Route 2, Box 299A Waynesboro, Georgia 30830
Dear Mr. Conway:
Subject:
Vogtle Unit 1 Mechanical Equipment Oualification Program The staff stated in a letter dated January 15, 1985, to Georgia Power Company that part of the NRC staff review of the Vogtle application for an operating license includes an audit review of Vogtle's environmental qualification pro-gram for safety-related mechanical equipment.
To facilitate this effort, we are requesting that Georgia Power Company provide complete qualification in-formation, including engineering drawings, for the following three items of mechanical equipment.
i Item Plant ID No.
4 1.
Techno Corporation / tornado damper 11551W7300 2.
Anchor Darling /stop check valve 11302U4128 3.
Garrett / valve IPV0455A This information should be provided by December 5,1986, in order not to impact Vogtle Unit 1 fuel load.
If there are any questions on this matter, j
contact me at (301)492-7357.
Sincerely, Melanie A. Miller, Project Manager PKP, Project Directorate #4 Division of PWR Licensing-A 8612030554 861203 cc: See next page PDR ADOCK 0500 4
A ESTR!nnTrn hocketFile)n.
OGC/Bethesda NRC POR ACRS (10) local PDR PRC System PWR#4 Rdg MDuncan MMiller JPartlow BGrimes EJordan NThompson
[
l-(PWR-A 1
I ghE-A PHR
[i WR-A MBdhra(DPWR-A PWRfv P
4 BJY uncj[ blood r/mac n
H er
'{/86 12// /86 124
/86 12/'1/ /86 1
w, 4
Mr. R. E. Conway i
Georgia Fcwer Company Vogtle Electric Ger.critirg Plant cc:
Mr. L. T. Gucwa Resident Inspector Chief fluclear Engineer Nuclear Pegulatory Connaission Georgia Power Company P. O. Box 572 P.O. Bux 4545 Waynesboro, Georgia 30P30 Atlanta, Georgia 30302 Fr. Ruble A. Thomas Depoish Kirkland, III, Cconsel Vice President - Licensing Office cf the Consumers' Utility Vogtle Project Council Georgia Power Ccrpany/
Suite 225 Southern Corpany Services, Inc.
32 Peachtree Street, f:.V.
P.O. Box 2625 Atlanta, Georgia 30303 Bimingham, Alabama 35202 Jeres E. Joiner ftr. Donald O. Foster Troutman, Sanders, Lockerman, Vice President & Project General l'anager
& Ashmore Georgia Power Ccmpany Candler Building Post Office Box 299A, Route 2 127 Peachtree Street,f!.E.
Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.
P.O. Box 2625 Carol Stangler Birmingham, Alabama 35202 Georgians Against Nuclecr Energy 425 Euclid Terrcer Ernest L. Blake, Jr.
Atlanta, Georgia 30307 Bruce W. Churchill, Esq.
Shew, Pittman, Potts and Trowbridge 2300 h Street, N.W.
Washir.gton, D. C.
20037 Mr. G. Bockhold, Jr.
Vogtle Plant Manager Georgia Power Cor.pany Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Adninistrator, Region 11 U.S. Nuclear Regulatory Conmission 101 Marietta Street,fl.U., Suite 2900 Atlanta, Georgie 30323