ML20214T300
| ML20214T300 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/24/1986 |
| From: | Robert Williams KELLY, STANSFIELD & O'DONNELL, PUBLIC SERVICE CO. OF COLORADO |
| To: | |
| Shared Package | |
| ML20214T282 | List: |
| References | |
| TAC-63029, NUDOCS 8609300254 | |
| Download: ML20214T300 (4) | |
Text
-
CEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of the Facility Operating License)
)
of
)
)
PUBLIC SERVICE COMPANY OF COLORADO
)
Application for Amendment to Appendix A of Facility Operating License License No. DPR-34 0F THE PUBLIC SERVICE COMPANY OF COLORADO 4
FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application for Amendment to Appendix A of Facility Operating License, License No. DPR-34, l
1s submitted for NRC review and approval.
Respectfully submitted, PUBLIC SERVICE COMPANY OF COLORADO By R. O. Williams, Jr.
Vice President Nuclear Operations KELLY, STANSFIELD & 0'DONNELL Bryant O'Donnell Robert E. Thompson Public Service Company Building Denver, Colorado 80202 i.
8609300254 860924 PDR ADOCK 05000267 i
P PDR
-n-
-e.---
--n
,,,,-,.n,m.,-,,.,
,,..,,---.,-n r--,.,,
,n,
--~--n..
,e-,,
- -, - -..~.
...---,we+-------~,-r-
SUMMARY
OF PROPOSED CHANGES i
. Attachment 1 to P-86549
SUMMARY
OF PROPOSED CHANGES SECTION DESCRIPTION 3
- 1. SR 5.6.1.b changed to exclude verification that load sequencers are operable.
- 2. SR 5.6.1.e is new surveillance that
~
is performed at each refueling cycle, not to exceed 18 months.
This surveillance requires demonstration that the standby generators automatic controls and load sequences are operable e.g.,
same requirements as the original SR 5.6.1.b.
Basis for Specification 5.6.1.
- 1. Basis has been updated to reflect changes made in surveillance requirements.
PROPOSED CHANGES t
i