Further Response to 860722 Appeal of Denial of FOIA Request to Release Documents Re Comanche Peak Task Force.Addl Info in One document,G-280,now Publicly Available & Encl.Info in Other 187 Documents Remains Withheld (Ref FOIA Exemption 5)
ML20214T095
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/28/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20214T097 List:
References
FOIA-85-59, FOIA-86-A-132 NUDOCS 8706100115
Download: ML20214T095 (1)


Text

P

]

'g , f( UNITED STATES

  1. a NUCLEAR REGULATORY COMMISSION c j WASHINGTON. D. C. 20555

\ *****

/

NAY 2 8 1987 Billie Pirner Garde, Esquire Government Accountability Project Midwest Office IN RESPONSE REFER 104 E. Wisconsin Avenue TO F01A-86-A-132 Appleton, WI 54915-8605 (F01A-85-59)

Dear Ms. Garde:

This is in further response to your letter dated July 22, 1986, in which you appealed Mr. Donnie H. Grimsley's letter dated June 25, 1986.

Mr. Grimsley's letter denied documents in part that were subject to your Freeaom of Information Act (F01A) request for documents related to the NRC Comanche Peak Task Force. My letter to you dated April 10, 1987, aadressed the agreement which was the basis for deleting certain information in the requested documents. This letter will adoress those portions of 188 documents listed on Appendix G which were initially denied pursuant to an F01A exemption. Mr. Chilk will respond separately concerning 73 documents.

Acting on your appeal, I have carefully reviewed the record in this case and have determined that additional information in one document, G-280, can now be made publicly available. The previously withheld information in the other 187 documents will continue to be withheld from public disclosure pursuant to Exemption (5) of the F0IA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of the Commission's regulations. Your appeal is, therefore, partially granted and partially denied.

Document G-280 is now being made publicly available and is enclosed.

As stated in Mr. Grimsley's letter dated June 25, 1986, the withheld <

portions of the 187 documents relate to the subject of potential violations. The withheld portions were predecisional to the issuing of the enforcement action on Comanche Peak. Exemption (5) shields from mandatory disclosure information generated in the deliberative process that precedes most decisions of government agencies.

t.

'l This is a final agency action on the 187 documents. As set forth in the F01A (5 U.S.C. 552(a)(4)(B)), judicial review of this decision is available in a district court of the United States in the district in which you reside or have your principal place of business or in the District of Columbia.

Sincerely,

/ ,- - f A

i tor S 10, 'r.

cutiv Director for Operations

Enclosure:

As stated 0706100115 070020 PDH FOIA CARDEU6-A-132 PDR

e N

[/

y k UNITED $TATES Wi /

s, e .~.. /s/

i NUCLE AR REGULATORY COMMISSIO*.

,us.uscro=. o e rosss

.* w a c NJ.

i Docket hos. 50-445/50-446 Ms. Billie Pirner Garde, Director Environtr. ental Whistleblower Clinic Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 Washington, DC 20036 lh RESPONSE REFER TO F01A-85-59

Dear Ms. Garde:

This is in further response to your letter dated Januarj 21, 1965, in which you requesteo, pursuant to the Freedom of Inforfration Act (FOIA), records related to the NRC Conanche Peak Task Force established in March 1984 We are now placing one additional box of records (box 6) in the QA/QC category, covering Appendix G records numbered 1 through 332 into the Public Document Room (POR) in file F0!A-85-59 under your name.

Portions of the records identified at numbers 95,140 through 158, 160 through 209,211 through 221, 223 through 239, 242 through 269, and 271 through 332 are being withheld from public disclosure U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of pursuant to Exenstion the Cortunission's 5 of the F0!A (5 regulations. The records contain the advice, opinions, and recomendattor.s of the staff concerning potential violations. The nonexempt portions of the records are being placed in PDR file F01A-85-59 under your name.

    • Pursuant to 10 CFR 9.9 of the Comission's regulations, it has been determined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the undersigned and Mr. Harold R. Denton, Director, Office of Nuclear Reactor Regulation.

This denial may be appealed to the Executive Director for Operations within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Executive Director for Operations U.S. Nuclear Regulatory Comission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0!A Decision."

I

l

  • Mrs.' Garde ,

t The records identified at numbers 1 through 73 and portions of the records i identified at numbers 140 through 142, 159, 201, 202, 240 through 242, 264, ar.d 281 through 283 contain information subject to the agreement reached between r ycu and the NRC staff at a meeting on May 8,1985. Therefore, we are not ,

invoking an FOIA exemption regarding the deletion of this information. ,

A separate set of the released records is being made available for public -

inspection and copying at the Local Public Document Room (LPOR) located at the  ;

University of Texas Library,170 South Cooper Street, Arlington, Texas.

Additional records subject to your request are currently under review and will be placed in the POR and LPDR upon completion of the review.  ;

i Sincerely, l

/ ):.% $ Ys **j Donnie H. Grimsley, Director Division of Rules and Records  :

Office Of Administration

Enclosure:

As stated ,

l l

oew ,

1 i

f l

f i

(

--.__._a... ., --. _--~.----.-a- -

_ .w- _ . .- >-

l RE: F01A-85 59 Box 6 - QA/QC APPENDIX G DATE PAGE -

1. 3-17-81 QA Initial Personnel Certification 5 Sumary Record
2. 3-19-81 QA Initial Personnel Certification 4 Sumary Record
3. 8-25-84 Personal Log 67 L
4. 8-26-84 Copy of Spiral Notebook w/ 27 Notes of Mark W. Eli, TRT
5. 8-26-84 Nonconfonnance Report (NCR #3 i

3 00768)

=

6. 8-26-84 Handwritten Notes 13 i
7. 8-25-84 Handwritten Notes of Rad Waste 61 '

Inspection

8. 8-26-84 DWG #GGH-00-X-A8-024A Rev 4 1 Pipe Support Design Group Small Bore Pipe Supports l
9. 8 26 84 DWG #BRHL CC-X-A8 024A Rev 0 1 Component Cooling Water 10, 8 26 84 DWG #BRHL SI-1-A8-004 Rev. 0 1 Safety injection
11. 8-26-84 DWG #BRHL-SI-1-SB-053 Rev. 0 3 Rev I and Rev 1 Safety injection .
12. 8-26-84 DWG #BRHL-CC-1-RB-065, 1 Rev. 1 Component Cooling Water
13. 8-26-84 DWG #BRHL-CC-1-SB-004 1 Component Cooling Water
14. 8-26-84 DWG BRHL-CC-1-SB-004, Rev. 8 1 Component Cooling Water
15. 8-26-84 DWG #BRHL-51-1-58-015 Rev. 3 1 Safety Injection
16. 8-26-84 DWG #BRHL-51-1-SB-015 1 Safety injection
17. 8-26-84 DWG #BRHL-CS-1-RB-038C Rev. 0 1

~~

Chemical & Volume Control

18. 8-26-84 DWG-BRHL-CS-1-RB-038C 1 Chemical & Volume Control i

19, 8-26-84 DWG 2323-EL-0032, Sheet #56 1 SW Development & Conn Diag.

I

20. 8 26 84 DWG 2323-EL-032, Sheet #57, 1 l TBX-RCPCAX 02 BKR 1PCPX2 j Schematics Diagram i
21. 10-31 80 QA Inspection Certification 1
22. 4-10-81 QA Inspection Certification 2 2

. i i

. . 23. 11-19-81 Procedure-Ql-QP-11.3-24.7 Rev. 3 11 i

24, 1-19-82 Procedure QI-QP-11.10-2 Rev. 9 13 l

25, 3-18-82 QA Inspection Certification 1 s

Procedures CP-QP-15.4 Rev. 2 2

26. 6-29-82
27. 9-21-82 QA Inspection Certification 1 12-30-82 Procedure CP-QP-22.0 Rev 0 7 28.

4 1

29. 3-2-83 QA Inspection Cert. 2 1
30. 2-24-83 Sketch #2323-El-0032 on Elec 3 Cable Separ, & Firing of QC j .
31. 4-11-83 B&R Memo from Karen Morton 2 li _
to Dist. Subj
Update of ,

Certification Matrix ,

32. No Date Sketch - #2323-El-0032 3

-m 33, 4-23-80 Weld Data Card #13265 3 l.

34. 7-18-80 Modification Manufacturing 2 ,

l Record Sheet 4 4 j 35. 1-6-81 Sketch RH-1-024-003-522P, Rev. 4 1 i'

36. 10-15-81 Sketch G1227037-5.3-3K 2 4
37. 5-4-82 Documentation Checklist 6 S1-1-40-003-7 2-25-83, As Built Reverification Report Form 2
  1. 1859 l

i I 3 1

,ip

38. 3-2-83 As Built Reverification 3

+

Report Form 72045

39. 3-2-83 As Built Reverification 3 I Report Form #2051 i
40. 3-3-83 As Built Reverification 3 l Report Form #2046 l 41, 3-3-85 As Built Reverification 3 l

Report Form #1814 l 42. 3-3-85 As Built Reverification 1 l Report Form #2106

43. 3-3-85 As Built Reverification 2 i

Report Form #1971 44, 3-3-85 As Built Reverification 3 Report Form #1970 45, 3-3-85 As Built Reverification 2

  • M Report Form #1931
46. 3-3-85 As Built Reverification 2 Report Form #1902 l

l

, 47. 3-4-85 As Built Reverification 3 l Report Form #2461 48, 3-4-85 As Built Reverification 2

, Report Fonn #2152 49, 2/25/85 As Built Reverification 2 Report Form #1859 l-4 l.

50 3-4-85 As Built Reverification 2 Report Form #2151

51. 3-4-83 As Built Reverification ,4 Report Form #1879
52. 3-14-83, As Built Reverification 3 Report Form #2659 53, 3-14-83 As Built Reverification 3 Report Form #2709
54. 3-14-83 As Built Reverification 2 Report Form #2689
55. 3-14-83 As Built Reverification 2 Report Form #2762
56. 3-14-83 As Built Reverification 3 Report Form #2678
57. 3-14-83 As Built Reverification 4 Report Form #2648
58. 3-15-83 As Built Reverification 2 Report Form #2760
59. 3-15-83 As Built Reverification 2 Report Form #2686
60. 3-15-83 As Built Reverification 2 Report Form #2685
61. 3-15-83 As Built Reverification 2 Report Form #3005 5
62. 3-15-83 As Built Reverification 2 Report Form #3006
63. 3-15-83 As Built Reverification 3 Report Form #3007
64. 3-16-83 As Built Reverification 3 Report Form #2010
65. 3-16-83 As Built Reverification 2 Report Form #2009
66. 3-16-83 As Built Reverification 2 Report Form #2008
67. 3-17-83 As Built Reverification 2 Report Form #2889
68. 3-18-83 As Built Reverification 4 Report Form #2767
69. 3-28-83 As Built Reverification 2 Report Form #2781
70. 3-31-83 As Built Reverification 3 Report Form #2471
71. No Date Copy of Hilti Architects and 18 Engineers Anchor & Fastener Design Manual
72. No Date Examination & Documentation 16 Checklist on Spool Piece No.

SI-1-YD-03-7 6

73 No Date Folder of Bob Harbon, Reviewers 41 Notes

74. 3-31-81 USNRC SSINS #6830 -5
75. 4-11-83 NRC ltr to TUGC-

Subject:

8 Construction Appraisal Inspection 50-445/83-18, 8 50-446/83-12

76. 7-27-83 NRC Ltr to TUGC G. L. Madsen 29 to R. J. Gary - RE: Special Inspection of Fuel Bldg completion
77. 10-3-83 NRC Ltr to TUGC-RE: Inspection 6 of 7-27 thru 9-16-83-Region IV follow up of CAT
78. 10-13-83 NRC Ltr to TUGC from E. H. 6 Johnson to R. J. Gary RE:

Response to NRC ltr and Notice

  • M of Violation dated 7-27-83
79. 10-31-83 Misclassification of Material 14 Case Exhibit 1,052
80. 11-30-83 Nonconformance Report #11,809 6
81. 1-6-84 SIS Report - Case Exhibit #1,054 3
82. 6-21-84 NCR ltr to TUGC - Richard L. 44 Bangort to M. D. Spence RE:

Special Inspection of Cable Spread Room 7

~

83. 3-83 CAT Inspection Summary 72
84. 7-11-83 CPSES/FSAR 27
85. 10-83 Handwritten Notes of Review of 3 TRT Members Answers to CAT Report
86. 7-6-84 NRC ltr to TUGC-Richard L. 17 Bangart to M. D. Spence - RE:

Inspection conducted under the Resident Inspection Program

87. 8-17-84 USNRC IE Information Notice 8
  1. 84-67
88. 9-11-84 TUGC0 Memo to B. R. Clements 13

" Comanche Peak Special Review Team Report (July 13,1984)

89. 9-17-84 B. R. Clements, TUGCO, ltr to 3 R. P. Denise, USNRC " Welding Allegations additional Response File No. 10066.5"
90. 9-10-84 R. L. Bangart, NRC ltr to M. 88 D. Spence, TUGC0 RE: Special Inspection of Unit I reactor Containment Bldg.
91. 12-07-84 D. R. Hunter, NRC ltr to M. 50 D. Spence TUGC0 RE: Special Inspection of the Safeguards and Auxiliary Bldg.

8 -

92. 2-19-79 B&R Materials & Operations 8 Listings
93. 9-21-84 Handwritten Notes by Bob 11 Hedderick Action Plan
94. 10-10-84 Handwritten Notes to Mark: RE: 11 Material Traceability Problems encountered during As-built Inspection
95. 10-10-84 Handwritten notes by Bob 13 Hedderick "As-Built Material Traceability"
96. No Date Copy of page 50 10CFR50 ,

1 Appendix B.

! 97. 12-18-84 USNRC Memorandum Before Admin 10 Judges ASLBP #50-445-OL, 50-446-OL w

98. 4-27-81 TUGC0 As Built Checklist 10
99. 6-4-84 M. R. McBay TUGC0 Office 25-Memo to Dist. RE: CPSES NF-4725 Locking Device" 100. 6-5-84 TRT Guidance - June 1984 18 101. 7-30-84 TUGC0 "As-Built Verification 3 Package Contents,"

CP-EI-4.5-1

9

~

102. 9-21-84 Handwritten Notes by Robert 3 Harbron RE: Chronology of Delays and Roadblocks 103. 12-5-84 Handwritten notes 3 to Herb.

104. 1-22-85 Handwritten notes to 1 Herb " Inspected Supports" 105. No Date Copy of Page 117 and 109 2 of 1983 Edition of NF-4000 106. No Date Copies of Pages 454 thru 3 l 459 of Chapter 1 - NRC Part 50 App B.

107. No Date Copy of Appendix A to CP- 1 IABV-1 108. No Date Handwritten Listing of 1

~~*"

Procedures 109. 7-2-79 Karl V. Seyfrit, NRC to 12 R. J. Gary, TUGC0 RE:

Action on IE Bulletin 79-14 110. 7-18-79 Karl V. Seyfrit, NRC ltr to 12 R. J. Gary, TUGCO-RE: IE Bulletin 79-14 revision to limit scope of work required Ill. 7-24-79 J. T. Merritt Memo to 2 D. N. Chapman " Request for Extension of Time to Answer IE Bulletin #79-14 10

112. 7-20-79 Antonio Vega, Office Memo to 1 J. T. Merritt " Revision 1 to

, NRC IE Bulletin #79-14 -

113. 7-20-79 Handwritten Copy of Telephone 1 Conversation 114, 7-26-79 Antonio Vega Office Memo 1 to J. T. Merritt RE: Request for extension to IE Bulletin 79-14 QA File-IE Bulletin 79-14 8-17-79 Karl V. Seyfrit, NRC ltr 7 115. 8/15/79 R. J. Gary, TUGCO-RE:

Supplement to IE Bulletin 79-14 116. 9-11-79 Karl V. Seyfrit. NRC ltr to 7 1

R. J. Gary, TUGCO-RE: Supple-

-or ment to IE Bulletin #79-14 117. 9-11-79 Antonio Vega, office Memo to 8 J. T. Merritt - RE: Transmittal of Supplement #2 - dtd 9-7-79 i

QA File: IE Bulletin 79-14 118. 10-25-79 R. J. Gary, TUGCO.ltr to Karl 1 V. Seyfrit, NRC - RE: Response to IE Bulletin 79-14 File No.

10115 119. 10-25-79 R. J. Gary, TUGC0 Ltr to Karl 2 V. Seyfrit, NRC, RE: 1981-83 2300 MW Installation, Response to IE Bulletin 79-14 File #10115 11

120. 12-14-79 J. T. Merritt, TUGC0 Office 2 Memo to A. Vega - RE: Progress Report on Response to NRC IE -

Bulletin No 79-14 121, 12-19-79 Mike Laue, TUGC0 Office Memo 1 to J. T. Merritt, RE: Progress Report QA File: IEB-79-14 122. 12-20-79 Design / Construction Significant 1 Deficiency Analysis Report #027 123. 12-21-79 Brown & Root Message Form RE: 2 BDAR-0027 124. 2-29-80 J. T. Merritt, TUGC0 Office 2 Memo to A. Vega, RE: IE Bulletin 79-14 Ref: QNB-47 125. 3-3-80 Mike Laue, TUGC0 Office Memo 3

.r to J. T. Merritt, RE: Progress Report QA File: IEB-79-14 4-24-80 126. 4-24-80 Licensing Correspondence Distribution File #10115 3 127. 4-30-80 J. R. Ainsworth Speed Letter 3 to M. Laue - RE: Progress Report of IE Bulletin 79-14 128. 5-5-80 Mike Laue, TUGC0 Office Memo 1 to J. T. Merritt, RE: Progress Report QA File: IEB 79-14 129. 6-27-80 M. R. McBay, TUGC0 Office Memo 1 I to R. G. Tolson, RE:NRC IE Bulletin #79-14 Ref: CPP-3404 12

130. 6-25-80 B. J. Murray, TUGC0 Office Memo 2 to Mr. R. McBay, RE: Progress Report on NRC IE Bulletin 79-14 131. 7-1-80 Copy of Speed Letter from M. 11 Laue to J. R. Ainsworth RE:

Progress Report IE Bulletin 79-14 132. 12-4-80 J. N. Baker, TUGC0 Office Memo 6 to M. R. McBay, RE: Progress Report on NRC Bulletin IE 79-14 133. 12-8-80 M. R. McBay, TUGC0 Office Memo 3 to H. C. Schmidt, RE: Seismic Analysis for As-Built Safety-Related Piping Systems, Ref CPP-4265 134, 8-6-82 D. W. Westbrook, TUGC0 Office 3 Memo to R. G. Tolson, RE: Tech-

    • " nical Services Response to IE Bulletin 79-14 135. 10-22-82 M. R. McBay, TUGC0 Ltr to H. C. 2 Schmidt of Nuclear Licensing Texas Utilities Services, RE:

Response to NRC IE Bulletin 79-14 i

136. 12-3-82 R. J. Gary, TUGC0 ltr to John l 3

T. Collins, USNRC, RE: Compliance with NRC IE Bulletin 79-14 13

137. 11-11-83 Fred W. Madden, TUGC0 1 Office Memo to M. J. Riggs, RE: IE Bulletin 79-14 Ref -

(1) TXX-3597. (2) CPP-8001, (3) CPPA-34942, (4) GTN-59850 138. 11-17-83 Chris Vale, TUGC0 Office 2 Memo to L. M. 8ielfeldt, RE: IE 79-14 As Built i

139. 6-8-84 A. Vega, TUGC0 Office Memo 1 to J. T. Merritt, RE: As-Built Piping Verification Program 140. 4-15-85 SSER AQ-46-Draft 9-141. 4-15-85 SSER AQ55 and AQ78, Redraft 18 142. 4-22-85 SSER AQ-128, AQ-44, Rev. 4 8 143. 4-13-85 SSER AQ15-AQ-89, Draft 5 144. 4-13-85 SSER AQ 90-I, Draft 5 145. 4-13-85 SSER AQ-21, 22, 119, Draft -

7 146. 2-28-85 SSER AQ-103, AQ-72 Redraft 8 4

147. 3-16-85 SSER AQ-99, Redraft 4 148. 4-15-85 SSER AQ-110, Redraft 5 4 149. 4-15-85 SSER AQ-102, Draft 8

, 14

150. 4-16-85 SSER, AQ-100, AQ-123, Draft 7 151. 4-16-85 SSER AQ-16, Redraft -9 152. 4-16-85 SSER AQ-3, Draft 10 153. 4-17-85 SSER, AQ-33, Draft 5 154. 4-18-85 SSER, AQ-17, AQ 107 10 155. 4-18-85 SSER, AQ-105, Redraft 6 156. 4-18-85 SSER, AQ-111, Redraft 5 157. 4-18-85 SSER,AQ-134, Redraft 4 158. 4-18-85 SSER, AQH-1, AQW-13, Draft 5 159. No Date SSER,AQ-19, Draft 6

-r 160. 4-18-85 SSER, AQ-49, 74, 125, Draft 7 161. 4-18-85 SSER, AQ-45 Draft 5 162. 4-18-85 SSER, AQ-75, 76, Draft 4 163. 4-18-85 SSER, AQ-129, AQH-16, Redraft 5 164. 4-18-85 SSER, AQ-137, Redraft 4 165. 4-18-85 SSER,AQ-7,AQ-83, Draft 2 15

166. 4-15-85 SSER, AQ-23, Redraft 18 167. 4/15/85 SSER, AQ-73 .4 168. 4-23-85 SSER, AQ-91, Final 4 169. 2-28-85 SSER, AQ-130, Redraft 4 170. 2-28-85 SSER,AQ-131, Redraft 3 171. 4-16-85 SSER, AQ-61, Draft 4 172. 4-18-85 SSER, AW-37, AQ-52 Draft 12 173. 4-19-85 SSER, AQ-68, AQ-82, Draft 6 174. 4-19-85 SSER, AQ-117, Draft 4 175. 4-19-85 SSER, AQ-88, Draft 3 176. 4-19-85 SSER,AQ-43,AQ-47,AQ-51, 5 Draft 177. No Date SSER, AQ-98, Draft 3 178. 4-22-85 SSER, AQ-77, 79 & 138 Draf t 20 179. 4-18-85 SSER, AQ-54, AQ-65. Draft 11 180. 4-15-85 SSER, AQ/QC 5.0, Draft 25 I

161. 4-16-85 SSER, AQ-53, Redraft 4 '

182. 4-17-85 SSER, AQ-5, Draf t 6 16 l

183. 4-19-85 SSER AQ-12, AQ-13, AQ-14, Draf t 6 184. 4-19-85 SSER AQ-40, Draft 4 185. 4-19-85 SSER AQ-41, Draft 4 186. 4-15-85 SSER, AQE-41. Draft 4 187. 4-15-85 SSER, AQ-70, Draf t 4 188. 4-15-85 SSER, AQ-38, Revised 6 189. 3-19-85 SSER, AQ-9, Draft 3

'190. 3-20-85 SSER, AQ-127, Redraf t 6 191. 4-18-85 SSER, AQ-20, Draft 4 192. 4-18-85 SSER, AQ-25, Draft 4 193. 4-18-85 SSER, AQ-69, AQ-122, Draft 4

-w 194 4-18-85 SSER,AQ-133, Draft 8 195. 4-18-85 SSER AQ-132, Draft 7 j 196. 4-19-85 SSER AQ-121, Draft 7 197. 4-19-85 SSER AQ-126, Draft 7 i

198. 4-22-85 SSER AQ-113, Redraft 4 i 199. No Date SSER AQ-112, Draft 5 200. 4-12-85 SSER, AQ-135, Redraft 15 '

i 17

_ _ _ _ _ _ _ _ _ _ _ . _ - - - - - - - - - - - - - - - - - - - - - ' - - ' ~ ~ ~ ~ -

201. 10-8-84 SSER, AQ-30, 31, 32, 34, 36, 30 37, 80, 85, 86, 87, 95, 96, 97,106,109,114,116,120 and 124, Draft 202. 1-15-85 SSER, AQ-55, AQ-78, Draf t 16 203, 10-9-84 SSER, AQ-79, Draf t 5 204 10-9-84 SSER, AQ-79, Draf t 6 205. 10-29-84 SSER, AQ-77, Rev. 1 9 206. 10-29-84 SSER, AQ-77. Rev. 1 7

)

i 207. 10-29-84 SSER, AQ-138, Draf t 3 22

{

208. 1-30-85 SSER, AQ-77, 79, 138 Draft 3 21 209. 10-25-84 SSER, AQ54, AQ65. Draft 15 210. 10-25-85 Handwritten Sheet of AQ 1

-w Numbers 211. 10-9-84 SSER, AQ-12, 13, 14, 115, Oraft 9 212, 10-25-84 SSER, AQ-40, Redraf t 6 213. 10-22-84 SSER,AQ-41, Redraft 8 214, 11-6-84 SSER, AQ-5, Redraft 8 215. 11-6-84 SSER, AQ-53, Redraf t 6 216. 1-15-85 SSER, AQ-53, Redraf t 7 f i

l l

18 J

1

217.. 9-6-84 SSER, AQ-70, Draft 6 218. 9-6-84 SSER, AQE-41, Draf t 8 219. 10-9-84 SSER, AQ-46, Draft 12 220. 10-25-84 SSER, AQ-35, Draft 7 221, 10-27-84 SSER,AQ-38,AQ-98 9 l 222. No Date Handwritten List of AQ 1 Numbers a

223. 10-4-84 SSER, AQ-126. Draf t 7 224. 10-5-84 SSER, AQ-9, Draft 5 1

225. 10-5-84 SSER, AQ-9, Draft 4 226. 10-6-84 SSER, AQ-20. Rev. 3 7 227. 10-8-84 SSER, AQ-127 Draft. Rev. 1 8

- -or 228. 10-9-84 SSER, AQ-121, Draf t, Rev. 2 10 229. 10-9-84 SSER, AQ-132 Draft 5 9 230. 10-9-84 SSER, AQ-121 Draft, Rev. I 10 231. 10-24-84 SSER, AQ-25, Draft, 7 4 232, 10-24-84 SSER, AQ-112, Draft 3 7 1

233. 10-31-84 SSER, AQ-113, Draf t 2 11 234. 1-15-85 SSER, AQ-133, Draft, Rev. 1 9 19

235. 10-8-84 SStR, AQ-44, AQ-128, Rev. I 10 236. 1-14-85 SSER, AQ-135, Draft 5 14 237. 2-7-85 SSER, AQ-50, Redraft Rev. 1 49 238. 3-14-85 SSER, AQ-135, Rev. 2 15 239. No Date T. Curry Note on SSER pages 17 "Back up for potential Violations Letter."

240. 7-27-84 CP Technical Issues from 38 Special Review Team Report of 7-13-84 Issues #SRT 1-10 241. 8-6-84 Comanche Peak Allegation 4 Work Package 242. 10-9-84 SSER, AQ-100 and AQ-123, 18 Draft 2

~~*"

243. 10-8-84 SSER, AQ-90, Draft 2 9 244. 10-27-84 SSER, AQ-21, 22, 119, Rev. I 12 245. 1-15-85 SSER, AQ-15, AQ-89, Rev. 2 8 246. 10-1-84 SSER, AQ-110, Draft 9 i

l 247. 10-1-84 SSER, AQ-99, AQ-136, Draft, 6 l

Rev. 1 l

248. 10-1-84 SSER, AQ-99, Draft, Rev. 3 6 20

249. 10-04-84 SSER, AQ-103, AQ-72, Draf t 1 19 250, 10-5-84 SSER, AQ-105, Dra f t, Rev. I 10 i

251. 10-8-84 SSER, AQ4, Draft, Rev. 2 6 252. 10-9-84 SSER, AQH-1, AQW-13. Draf t 8 Rev. 2 253. 10-9-84 SSER, AQ-33, Draft, Rev. 2 8 4

254. 10-9-84 SSER, AQ-134, Draf t 3 6 255. 10-11-84 SSER,AQE-9,AQ-17,AQ-18, 11 AQ-42,AQ-58,AQ-101,AQ-104, and AQ-107, Draft 2 256. 10-11-84 SSER,AQ-16,AQ-57,AQ-60, 12 AQ-71, Draft, Rev. 2 257. 10-24-84 SSER, AQ-19, Draft, Rev. 1 11

~

~""

258. 10-10-84 SSER, AQ-3, Draft, Rev. I 11 259, 12-13-84 SSER, AQ-102, Draft, Rev. I 10 260. 1-15-84 SSER, AQ-111, Draft, Rev. 2 7 261. 10-4-84 SSER, AQ-137, Draft 2 5 262. 10-9-84 SSER, AQ-45, Draft, Rev. 2 7 263. 10-9-84 SSER, AQ-49, AQ-74, AQ-125 12 Draft 2 21

~

264. 10-12-84 SSER, AQ-7, AQ-83, Draft 4 5 265. 10-25-84 SSER, AQ-137, Draft 2 5 1

266. 1-12-85 SSER, AQ-75, 76, Draft, Rev. 3 6 267. 1-15-85 SSER, AQ-129, AQH-16, Draf t, 7 Rev. 4 268. 1-10-85 SSER, AQ-91, Draft, Rev. 4 7 269. 1-15-85 SSER, AQ-23, Redraft Rev. 2 14 270. 10-24-84 SSER, AQ-73 Draft, Rev. 3 6 271. 10-2-84 SSER, AQ-130, Draft 3 5 272. 10-5-84 SSER, AQ-98, Draft, Rev. 3 5 273. 10-5-84 SSER, AQ-88, Draft, Rev. 2 5

~

~'"

274 10-9-84 SSER, AQ-117, Draft, Rev. 2 6 275. 10-9-84 SSER, AQ-61, Redraft, Rev. 1 6 276. 10-12-84 SSER, AQ-131, Draft, Rev. 2 9 277. 10-24-84 SSER, AQ-68. Draft, Rev._4 1 10 278. 1-15-84 SSER,AQ-43,AQ-47,AQ-51, 8 Draft, Rev. 3 279. 2-4-85 SSER, AQ-52 and AW-37, Draft 12 280. No Date SSER Summary 5 4

22 4

281. 3-20-85 SSER, AQ-55, AQ-78, Redraf t, 16 Rev. 2 282. 3-20-85 SSER, AQ-46 Rev. 3 7 283. 2-28-85 SSER, AQ-44, AQ-128, Draf t, 9 Rev. 4 284. 2-22-85 SSER, AQ-90, Redraf t, Rev. 3 7 285. 3-5-85 SSER, AQ-90-1, Rev. 3 6

! 286. 1-25-85 SSER, AQ-3, Redraft, Rev. 2 10 287. 2-25-85 SSER, AQ-4, Redraft, Rev. 2 4 288. 1-24-85 SSER,AQ-17,AQ-107,AQE-9 9 1

Redraft 3 289. 2-25-85 SSER, AQ-16, Redraft, Rev. 3 8 290. 2-25-85 SSER, AQ-19, Draft 4 9 291. 2-25-85 SSER, AQ-33, Redraft, Rev. 3 5 292. 2-28-85 SSER, AQ-103, AQ-72, Redraft 8 Rev. 1 293. 3-13-85 SSER, AQ-99, Redraft, Rev. 4 4 294. 3-18-85 SSER, AQ-105, Redraft, Rev. 2 6 295. 3-18-85 SSER, AQ-110, Redraf t, Rev. 2 5 296. 3-18-85 SSER, AQ-111, Redraft, Rev. 3 5 23

~

291. 3-18-85 SSER, AQ-134, Redraft, Rev. 2 4 298. 3-18-85 SSER, AQH-1, AQW-13. Redra f t, -5 Rev. 2 299. 3-18-85 SSER, AQ7, AQ-83, Redraf t, 4 Rev. 2 300. 3-18-85 SSER, AQ-45, Redraft 5 301. 3-18-85 SSER, AQ-49, 74,125, Redraft 8 302, 3-12-85 SSER, AQ-75, 76, Draf t, Rev. 4 4 303. 3-18-85 SSER, AQ-129, AQH-16. Redraft 5 304. 3-18-85 SSER, AQ-137, Redraft 3 5 305. 2-28-85 SSER, AQ-73, Draft, Rev. 3 5 306. 3-20-85 SSER, ~AQ-91, Draf t, Rev. 5 5 w

307. 3-4-85 SSRE, AQ-23, Redraft Rev. 3 11 308. 10-24-84 SSER,AQ-68,AQ-82, Draft, 8 Rev. 4 309. 2-28-85 SSER, AQ-130, Draft 4 4 310. 2-28-85 SSER, AQ-117, Redraft, Rev. 3 4 311. 2-28-85 SSER, AQ-131 Redraft, Rev. 3 3 312. 3-13-85 SSER, AQ-98, Draft, Rev. 4 3 313. 3-13-85 SSER, AQ-61, Draf t, Rev. 2 3 24

314. 3-13-85 SSER, AQ-88, Draft, Rev. 2 3 315. No Date SSER, AQ-77, 79 and 138 II, 21 Draft, Rev. 2 316, 3-15-85 SSER, AQ54, AQ-65, Draft, 11 Rev. 4 317. 3-15-85 SSER, AQ-30, 31, 32, 34, 35, 23 36, 37, 80, 85, 86, 87, 95, 96, 97, 106, 109, 114, 116, 120 and 124, Draf t, Rev. 2 318. 10-9-84 SSER, AQ-53, Draft, Rev. 2 4 319. 10-25-84 SSER, AQ-41, Draft, Rev.1 5 2

320. 2-28-85 SSER, AQ-5, Draft, Rev. 2 6 321. 2-28-85 SSER, AQ-40, Draft, Rev. 3 4 322. 3-13-85 SSER,AQ-12,AQ-13,AQ-14, 6 Draft, Rev. 3 323. 2-28-85 SSER, AQ-38, Draft, Rev.1 5 324 3-13-85 SSER, AQ-70, Draft, Rev. 2 7 325. 3-12-85 SSER, AQE-41, Draf t, Rev. 2 5 326. 10-24-84 SSER, AQ-25, Draft, Rev. 2 6 327. 11-16-84 SSER, AQ-112, Draf t, Rev. I 9 l

328. 3-19-85 SSER, AQ-9, Draft, Rev. 3 8 1