Forwards Insp Rept 50-424/87-26 on 870422-24,0429-0503,0512- 13 & 19-21.Violations Identified Under Consideration for Escalated Enforcement Action
ML20214S425
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/01/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20214S428 List:
References
NUDOCS 8706090266
Download: ML20214S425 (3)


See also: IR 05000424/1987026

Text

SAFEGUARDS INFORMATION'

. ~

,

"'

JUN 011987

Docket No. 50-424

License No. NPF-61

Georgia Power Company

ATTN: Mr. James P. O'Reilly

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT N0. 50-424/87-26 (SUPPLEMENT)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

D. Thompson and W. Tobin on April 22-24, April 29 - May 3,

May 12-13 and

May 19-21, 1987. The inspection included a review of activities authorized for

your Vogtle facility. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed

inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The violations described in the enclosed inspection report are currently under

consideration for escalated enfurcement action.

Accordingly, no Notice of

Violation is being issued at this time, and no response to this letter is

required. However, please be advised that the number and characterization of

violations described in the enclosed inspection report may change as a result

of further NRC review. You will be advised by separate correspondence of the

results of our deliberations on this matter.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure

to this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

8706090266 870601

DR

ADOCK 05000424

PDR

J. Nelson Grace

Regional Administrator

Enclosure:

(See page 2)

Enclosure conTArns

SAFEGUARDS INFORMATION

SAFEGUARDS INFO

@ON

uro" ste^ne:<or> ints

acusoccanou

(l

(

'

SAFEGUARDS INFORMATJ0hl

,

Georgia Power Company

2

dnclosure:

NRC Inspection Report

(Safeguards Information)

- cc w/ encl:

R. E. Conway, Senior Vice President &

Project Director

- C. Whitney, General Manager Project

Support

P. D. Rice, Vice President, Project

Engineering

R. H. Pinson, Vice President, Project

Construction

C. W. Hayes, Vogtle Quality

Assurance Manager

G. B. Bockhold, General Manager,

Nuclear Operations

cc w/o encl:

L. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

J. G. Ledbetter, Commissioner,

Department of Human Resources

C. H. Badger, Office of Planning

and Budget

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

G. A. Linenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

Panel

NS

ENCLOSURE CONT

W encl: (See Page 3)

S AFEGUARDS INF

T1118

UPON SEPARA

LLED,

SAFEGUARDS INFORMATION

M+

AncyARDS INFORMATIoqUU

-

.

3

01 27

Georgia Power Company

-

bcc w/ enc 1:

NRR/DRIS/SB

bec w/ Inspection Summary:

NRC Resident Inspector

Document Control Desk, 016

State of Georgia

f

d

p/

i

RII

RI

RI

Tg

RI

plg

(W obin

DTNompson

DMcAuirh

be

JStoir

Christnot

4 .5. n.( <

',

I 5/6/87

5/$3/87

5/y(/87

5

87

5/61/87

5/$/87

g g g,.7

2

RIIn

RII

RII

,

RII

ge

'

VBrownlee

LR yes

en ns

Phst

54 (/87

5/36/87

//87

/ I/87

b' N 'REOM M

~

3 AFECUAt40S INFORh .;10N

Ur-0!! SEPARATION * 'IS

l

Offica 77m; r>'c" 'a orco" tau""-

.

-

- - -

-

- -

- - -

-

-

- - -

-

-

- - - - -

.