Confirms 870615-19 for 10CFR50.49 Equipment Qualification Insp,Established During 860520 Conference.List of Documents Required 1 Wk Prior to Insp Encl
ML20214S006
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/01/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8706090089
Download: ML20214S006 (3)


Text

!

h JUN 01 p Philadelphia Electric Company ATTN: Mr. J. W. Gallagher Vice President Nuclear Operations .

2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

10 CFR 50.49 EQUIPMENT QUALIFICATION INSPECTION, PEACH BOTTOM UNITS 2&3 (50-277/87-18, 50-278/87-18)

This letter confirms the dates of June 15-19, 1987 for the NRC 10 CFR 50.49 equipment qualification (EQ) inspection at Peach Bottom Units 2&3. These dates were established during a conference call on May 20, 1986 between Mr. D. Thompson and other members of your organization and Mr. R. Paolino of the NRC Region I office. The inspection will take place at the Corporate Office in Philadelphia with a one day trip on June 17, 1987 to the plant site.

A management entrance meeting is scheduled for 1:00 p.m. on June 15, 1987. The management exit meeting is tentatively scheduled for 1:00 p.m. on June 19, 1987.

The inspection will include the following:

1. Review of your implementation of 10 CFR 50.49 EQ program, including preservation of qualified status of equipment.
2. Review of your implementation of Technical Evaluation Report / Safety Evaluation Report EQ corrective action commitments.
3. Review of EQ documentation files.
4. Physical inspection of equipment from the Master List.

One week prior to the inspection we will require one copy of each document identified in attachment I with a plus (+) mark.

A duplicate copy is to be sent to:

Uldis Potapovs, Chief Equipment Qualification Inspection Section EW/S 312A U.S. Nuclear Regulatory Commission Washington, DC 20555 8706090089 870601 PDR ADOCK 05000277 O PDR _

9 h._ - s-_

i 2

Your cooperation with us during this inspection will be appreciated. Should you have any questions regarding this inspection, you can contact Mr. R. Paolino at (215)337-5285 or Mr. C. Anderson at (215)337-5376.

Sincerely,

, Original Signea Byf Jacqr.eP.Durr

_l William V. Johnston Ir Acting Director .

Division of Reactor Safety

Attachment:

As Stated cc w/ encl:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station John S. Kemper, Senior Vice President, Engineering and Production Thomas S. Shaw, Jr. , Vice President, Production Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric G. Leitch, Nuclear Generation Manager Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Engineer in Charge, Licensing Section Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP y -

Robert J. Bores, DRSS Uldis Potapovs, EW/S 312A RI:DRS /// RI:D RI:DRS RI:DRS g g

Paolino/sif Anderson Durr Bette usen 5/2t/87 5/zS/87 Sbf/

5/A7/87 (

OFFICIAL RECORD COPY PAOLIN05/27/87 - 0002.0.0 05/28/87

1 t

ATTACHMENT 1

, REFERENCES

1. + Licensee's overall EQ Program i 2. +NRC Safety Evaluation Reports concerning environmental qualification of safety-related electrical equipment, including the SER that forwarded the TER to each licensee.
3. + Licensee's commitments for corrective action including May 1983 SER/TER response,1984 minutes of meeting with NRC, and subsequent changes.
4. +a. Licensee's list of equipment requiring environmental qualification (Master List, submitted in May 1983).

I j +b. Master List, version in effect at time of inspection.

5. +a. Generic Letter 84-24, D.G. Eisenhut to Licensee's and Applications, dated December 27, 1984,

Subject:

Certification of Compliance to 10 CFR 50.49.

+b. Licensee's response to Generic Letter 84-24.

6. + Licensee's current System Component Evaluation Worksheets (SCEW sheets) or equivalent (earlier SCEW sheets may have been included in previous licensee submittals).

4

7. + Licensee's procedures applicable to equipment qualification (EQ program, procurement of qualified equipment, maintenance of qualified equipment, modifications to EQ equipment, EQ personnel training (site and corporate personnel), QA/EQ interface including corporate QA, Site QA/QC audits, EQ spare parts procurement and licensee program for EQ related NRC Information Notices / Bulletins.
8.
  • Licensee's qualification documentation and/or files.
  • These documents must be available for the inspectors use throughout the inspection.

+These documents are requested for review before the inspection.