ML20214R849

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Aug 1986,correcting Transposed Docket Numbers
ML20214R849
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/31/1986
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20214R307 List:
References
NUDOCS 8609290296
Download: ML20214R849 (2)


Text

Docket No. 50 77 l

s

20. WIT AVAILABILITY FACTOR 36.3 77.9 63.5
21. WIT CAPACITY FACTOR (USING PWC NET) 31.5 71.4 56.2 i
22. WIT CAPACITY FACTOR (USING DER HET) 31.1 70.5 55.5
23. WIT FORCED OUTAGE RATE 63.7 20.0 13.5 2%. SHUTDOINS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, Me DURATIDH OF EACH)*

REFUELING OUTAGE FEBRUARY 28,1987 TO MAY 30,1987

25. IF SHUTDalN AT EPs OF REPORT PERIOD, ESTIMATED DATE OF STARTUP8 E6. WITS IN TEST STATUS (PRIOR TO CotetERCIAL OPERATION)*

FORECAST ACHIEVED INITIAL CRITICALITY 09/16/.73 INITIAL ELECTRICITY

__ __/_18_/.74 02 CDPetERCIAL OPERATION 07/05./.74 t

i l

l l

l l

l I

8609290296 860918 PDR ADOCK 05000277 R

PDR s'

_8 j

Docket No. 50-278 l

4

20. LMIT AVAILABILITY FACTOR 35.0 50.5 63.1.

=

21. LMIT CAPACITY FACTOR (USING feC NET) 25.6 40.7 60.2
22. UNIT CAPACITY FACTOR (USING DER NET) 24.9 39.5 58.5
23. LMIT FORCED OUTAGE RATE 65.0 23.4 7.9
24. SHUTD0lNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. Ate DURATION OF EACHit SAFE-Ete/ PIPE WELD INSPECTION JANUART 3.1987 TO JANUART 23. 1987
25. IF SHUTD0lN AT Ete OF REPORT PERIOD. ESTIMATED DATE OF STARTUPt
24. UNITS IN TEST STATUS (PRIOR TO CotMERCIAL OPERATIOHit FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/10/74 CatMERCIAL OPERATION 12/D/M l

l l

l

,1