ML20214R849
Jump to navigation
Jump to search
| ML20214R849 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/31/1986 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20214R307 | List: |
| References | |
| NUDOCS 8609290296 | |
| Download: ML20214R849 (2) | |
Text
Docket No. 50 77 l
s
- 20. WIT AVAILABILITY FACTOR 36.3 77.9 63.5
- 21. WIT CAPACITY FACTOR (USING PWC NET) 31.5 71.4 56.2 i
- 22. WIT CAPACITY FACTOR (USING DER HET) 31.1 70.5 55.5
- 23. WIT FORCED OUTAGE RATE 63.7 20.0 13.5 2%. SHUTDOINS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, Me DURATIDH OF EACH)*
REFUELING OUTAGE FEBRUARY 28,1987 TO MAY 30,1987
- 25. IF SHUTDalN AT EPs OF REPORT PERIOD, ESTIMATED DATE OF STARTUP8 E6. WITS IN TEST STATUS (PRIOR TO CotetERCIAL OPERATION)*
FORECAST ACHIEVED INITIAL CRITICALITY 09/16/.73 INITIAL ELECTRICITY
__ __/_18_/.74 02 CDPetERCIAL OPERATION 07/05./.74 t
i l
l l
l l
l I
8609290296 860918 PDR ADOCK 05000277 R
PDR s'
_8 j
Docket No. 50-278 l
4
- 20. LMIT AVAILABILITY FACTOR 35.0 50.5 63.1.
=
- 21. LMIT CAPACITY FACTOR (USING feC NET) 25.6 40.7 60.2
- 22. UNIT CAPACITY FACTOR (USING DER NET) 24.9 39.5 58.5
- 23. LMIT FORCED OUTAGE RATE 65.0 23.4 7.9
- 24. SHUTD0lNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. Ate DURATION OF EACHit SAFE-Ete/ PIPE WELD INSPECTION JANUART 3.1987 TO JANUART 23. 1987
- 25. IF SHUTD0lN AT Ete OF REPORT PERIOD. ESTIMATED DATE OF STARTUPt
- 24. UNITS IN TEST STATUS (PRIOR TO CotMERCIAL OPERATIOHit FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/10/74 CatMERCIAL OPERATION 12/D/M l
l l
l
,1