Forwards Special Team Insps 50-498/87-17 & 50-499/87-17 on 870330-0403.No Violations or Deviations Noted
ML20214R809
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/01/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20214R811 List:
References
NUDOCS 8706080339
Download: ML20214R809 (2)


See also: IR 05000498/1987017

Text

-

JUN 1

1987

t

.

In Reply Refer To:

Dockets: 50-498/87-17

S0-499/87-17

Houston Lighting & Power Company

ATTN:

J. H. Goldberg, Group Vice

President, Nuclear

P. O. Box 1700

Houston, Texas

77001

Gentlemen:

This refers to the special team inspection conducted by Messrs. R. P. Mullikin,

M. E. Murphy, and D. L. Garrison of this office; Messrs. A. Singh and

R. P. Goel of the Office of Nuclear Reactor Regulation; Messrs. K. Sullivan

and M. Villaran of Brookhaven National Laboratory; and Mr. D. Arnold of

Rolf Jenson and Associates, during the period March 30 through April 3,1987,

of activities authorized by NRC Construction Permits CPPR-128 and CPPR-129 for

South Texas Project, Units 1 and 2, and to the discussion of our findings with

Messrs. J. Bailey, W. Harrison, and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included establishment and implementation

of the fire protection program, and compliance with the requirements of

10 CFR 60, Appendix R, and BTP 9.S-1, per FSAR commitments and SER evaluation.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Oddnal si;;ned ej

J. E. GagDardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

(see next page)

$

C:ES/RSBfI

RIV:PI:RPS/B

PI:h

C:R

C:RPS/C $ C:RPB

MEMu phy

D un er

REIreland

GLConstable

JEGagli

0 \\

Mu[llikin/dp

/

87

r/l /87

2//87

$/22/87

f/yo/87

5'/p

8706080339 870601

PDR

ADOCK 05000498

G

PDR

- - _ - _ _ _ _ - _ _ _ -

I

Houston Lighting & Power Company

-2-

Enclosure:

Appendix - NRC Inspection Report

50-498/87-17

50-499/87-17

cc w/ enclosure:

Houston Lighting & Power Company

ATTN:

M. Wisenberg, Manager,

Nuclear Licensing

P. O. Box 1700

Houston, Texas

77001

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P. O. Box 1700

Houston, Texas

77001

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB

DRSP

  • RRI-0PS

R. D. Martin, RA

  • RRI-CONST.
  • SectionChief(RPB/C)
  • R&SPB
  • MIS System
  • RIV File
  • D. Weiss, RM/ALF
  • RSTS Operator

R. Pirfo, 0GC

  • R. G. Taylor, RPB/C
  • RSB
  • Project Inspector
  • R. Hall

,4

  • R. Mullikin
  • M. E. Murphy
  • w/766