2 4 SEP 1986 Docket Nos.:
50-498 and 50-499 Mr. J. P. Goldberg, Group Vice President-Nuclear Houston I.ighting and Power Company P.O. Box 1700 Pouston, Texas 77001
Dear Mr. Goldberg:
This is to acknowledge receipt of your letter of September 17, 1986 requesting relief on the applicable Cumulative Usage Factor for pipe break postulation, and also requesting "the earliest possible review". The staff has recognized the need for an expeditious review because of the impact on sizeable hardware items. The review is being conducted on a plant specific basis for South Texas. At this time, the staff feels that sufficient information is available to act on the request although it may not extend over the whole range of the request.
Vincent S. Noonan, Director PWR Project Directorate #5 Division of PWR I.fcensing-A Distribution
' Docket F1Teu P. Kadambi J. Partlow PWR PD#5 V. Noonan N. Thompson NRC PDR OEl.D ACRS (10) 1.ocal PDR E. Jordan M. Rushbrook P. Kadambi
- 8. Grimes OEl.D V. Noonan PD#Sh DIR:PD#5 PKadambi:ss VSNc onan 9Q/86 9
/86 86d9290204 860924 PDR ADOCK 05000498 A
j e
gp rar j
[t 0,,
UNITED STATES g
NUCLEAR REGULATORY COMMISSION WASHWGTON, D. C. 20655
/
2 4 SEP 1985 Docket Nos.:
50-498 and 50-499 Mr. J. H. Goldberg, Group Vice President-Nuclear Houston I.ighting and Power Company P.O. Box 1700 Houston, Texas 77001
Dear Mr. Goldberg:
This is to acknowledge receipt of your letter of September 17, 1986 requesting relief on the applicable Cummulative Usage Factor for pipe break t
i postulation, and also requesting "the earliest possible review". The staff
.has recognized the need for an expeditious review because of the impact on i
l (tzeable hardware items. The review is being conducted on a plant specific basis for South Texas. At this time, the staff feels that sufficient information is available to act on the request although it may not extend over the whole range of the request.
i j
/~
eh S.
oo an. Director WR Proje Directorate #5 Division f PWR l.icensing-A t
j I
- -