ML20214Q670

From kanterella
Jump to navigation Jump to search
Forwards Listing of Rept Numbers,Related Employee Concerns & Previous Submittal Dates for Review.Revised Final Element Repts for Three Elements Addressing QA & Matl Control Also Encl
ML20214Q670
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/26/1987
From: Martin M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20214Q673 List:
References
NUDOCS 8706050108
Download: ML20214Q670 (7)


Text

f.

1 s,

p.

TENNESSEE VALLEY AUTHORITY Watts Bar Nuclear Plant P. O. Box 800 Spring City Tennessee 37381 May 26, 1987 U.S. Nuclear Regulatory Commission Attn: Document. Control Desk Washington, DC 20555 Gentlemen:

In the Matter of the Application of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 EMPLOYEE CONCERNS TASK GROUP (ECTG) provides a listing of the report numbers, the related employee concerns, and the previous submittal dates if applicable. To assist you in your review of these reports, Enclosure 2 provides.a comparison between the ECTG Writer's Guide recommended report format and the transmitted reports.'

, transmits the revised final element reports for 3 elements y

. addressing Sequoyah Nuclear Plant employee concerns in the following categories:

v

-Quality Assurance - 2 reports Material Control - 1 report As indicated by the report cover sheets, these reports have completed final

. review by the Senior Review Panel and the Employee Concern Task Group management.

-Please telephone me at (615) 365-3587 (Watts Bar) if you have any questions.

' 1l Very truly yours, TENNESSEE VALLEY AUTHORITY M. S. Martin

/'

Watts Bar Nuclear Plant ECTG Licensing Manager p

cc (See page 2.):

) J 8706050108 870526 gV DR ADOCK O'50 7

i s

i An Equal Opportunity Employer

w.

? (:

' l' 3

.g 9 -

2 h l..

U.S. Nuclear Regulatory CNealssion

/

)

r cc (Enclosures):e 5 Mr. G. G. Zach! Assistant Director Regional Inspections g

Division of =TVA Erojects Office of Special: Projects U.S. Nuclear Regulatory Commission a

c,,

Region II 2YU 101 Mcrietta Street, NW, Suite 2900 Atlanta, Gdorgia 30323 p

tt Mr. John A. Zwolinski, Assistant Director

.C For Projects r

Division of TVA Pdojects

/

Office of SpeciaK Flrojects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322.

Beth'esdE,~ Maryland 20018 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy,' Tennessee 37379

?'.

.\\p l

l' l

./

l I

I f

i l

t l

I i

ENCLOSURE 1 Page 1 of 1 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Material Control 40705 XX-85-027-X02 Quality Receiving Unit (Revised Final)

Note: Materic1 Control 40705 was submitted final 11/05/87. It its being revised to incorporate SRP comments.

i Quality Assurance 80101 BFM-86-002-001 Quality Assurance (Revised Final)

MRS-85-001 Program Adequacy IN-86-011-003 OE-QMS-1 WBM-86-004-002 XX-85-116-008 Note: Quality Assurance 80101 was submitted final 03/19/87.

It is being revised to incorporate NRC comments.

Quality Assurance 80504 IN-85-91-001 Quality Assurance Records (Revised Final)

  • IN-85-357-001 IN-85-612-X07 JLH-86-001 SQM-86-002-001 SQM-86-002-005 SQM-86-002-006 SQM-86-003-002 SQM-86-009-X04 SQM-86-011-002 SQP-86-002-001 WBP-86-009-001 XX-85-088-X04 XX-85-122-042
    • XX-85-053-001
  • Concern added after 9/26/87.
    • Concern addressed in CO 11106.

Note: QA 80504 was submitted final 4/06/87. This report was revised to incorporate NRC comments.

l l

l

4 5

n oc a--.

I t

,wt,

,m

- -.. - -,-,,,,,,,, -,, w n-e w..-,-,-w

,,v,

,,,y,,----

--g


e--m-w a n g - w, g,,< - - -

g-~w,-,r-

MATERIALS CONTROL Enclosura 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue I.

Introduction

. Characterization II.

Summary of Perceived Problem 2.0 Summary IV.

Summary of Findings Conclusions (Portion) 3.0 Evaluators Cover Sheet Information 4.0 Evaluation-III.

Evaluation Process Methodology

5.0 Findings

IV.

Summary of Findings 6.0 Root Cause V.

Root Cause

    • Overall Root Cause will (Collective Significance)**

not be considered at this report level.

7.0 Attachments /

VIII. Attachments List of Concerns i

Other items included VI.

Corrective Actions in Element (To be provided by Reports line organizations)

VII. Generic Applicability l

l 1905T l

l l

l

T l

l l

i

- - - - - -