Geor0:a Power Company.
- 333 Redmont Aven.re Atlanta, Georgia 30308 Telephone 404 526-6724 MaJing Address-Post O%ce Box 4545 Acanta. Georg a 30302 R.E.Conway the soortem electic system Senior Vice Presdent November 21, 1986 Director of Nuclear Reactor Regulation File:
X7N00-29 Attention:
Mr. B. J. Youngblood Log:
GN-1182 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 FSAR AMENDMENT NUMBER 29
Dear Mr. Denton:
Georgia Power Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Elect ric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment 29 to the Vogtle Electric Generating Plant (VEGP) Final Safety Analysis Report (FSAR).
This amendment consists of revisions to the FSAR which documents changes to reflect design and procedural updates. These changes are itemized on.
Also included are instructions for inserting the Amendment 29 FSAR changes.
In accordance with the requirements of 10 CFR 54.30(b) and (c), three (3) signed originals and sixty (60) copies of Amendment 29 are submitted for your use.
Should you have any questions on the enclosed submittals, do not hesitate to contact me.
Yours truly Af$
R. E. Conway g
. ciogDAY OFAND SU SCRIBED BEFORE ME, TiiIS h
1986 m
"'j'!
Notaty PulgTc 0826V Notory P&, RMend %nt6 Care My Commlufen enites June 16, 1970.
8612050172 861121 PDR ADOCK 05000424 K
PDR a
4 FSAR Parag:aph Reason for Change 1.9.68.2 4.t, reflect current procedures to perform natural circulation on decay heat. Test I, individual rod position indication system is primary means of detecting rod misalignment.
Test JJ, reflect preop procedures (14.2.8.2.46) and limit potential damage to selected non IE powered equipment.
1.9.78.2 Credit taken for pump tests as described in Q480.5 2.4.11.5 Correction to reflect design of nonsafety-related
]
intake structure R
3.9.B.8 Update to allow use of displacement transduce rs and load cells 4.4.6.4 Peflect current design of DMIMS 5.2.2.10 Consistent with TS; P-11 actuatica is 1970 psig T5.2.3-3 Revised to reflect NSSS chemistry specification TS.4.10-2 Resolution of IFI 424/66-65-05 l
7.6.2.2 Correction to resolve IFI 50-424/8G-60-11 1
7.7.1.9.1 Correction and clarification of incore instrumentation system 8.3.2.2 Frovide consistency with 8.3.2.1.1 (see 14.2.8.1.74 below)
T9.1.5-5 Reflect crane test sequence 9.3.4.1 Revised to reflect NSSS chemistry specification i
9.4.3.2.4; 9.4.5.6 Correction; change consistent with RG 1.52 9.4.8.1.2; 9.4.8.2.3 Reflect maximum design temperature of 120*F in ESF rooms i
9.5.4.4 Provide consistency with response to Q430.9 10.2.3.6 Correction to reflect testing during preop rather than factory test of turbine hydrogen cooling system (nonsafety-related) 12.3.1 Clarification and consistency with TS l
l
FSAR Paragraph Reason for Change 12.5.3 Clarification in use of RWPs and consistency with TS 13.1.1; 13.1.2, Corrections to Chapter 13 as discussed by 13.4.1; 13.5.1 telephone with staff 14.2.6.1 FSAR consistency and conformance to RG 1.68 14.2.8.1.32 ACCW test to reflect most limiting mode
)
14.2.8.1.35 See 9.4.3.2.4 above 14.2.8.1.45 & 47 Instruments are calibrated during CATS rather than during preop testing 14.2.8.1.54 Clarify test method 14.2.8.1.74 Revised to reflect design 14.2.8.1.84/85 Reformatted to match test abstracts with preop testing 14.2.8.1.87 Clarification on use of check and calibration sources for PERMS testing 14.2.8.1.88 Clarification (see 7.7.1.9.1 above) 14.2.8.1.98 Deleted and incorporated into 14.2.8.1.85 and 106 14.2.8.1.106 See 14.2.8.1.35 above 14.2.8.2.5 Changed to reflect most lioiting condition in Fig. 15. 3. 2-4 14.2.6.2.28 Consisted with RG 1.68 and plant procedures on PERMS testing 14.2.8.2.46 Limit potential damage to non IE powered equipment (see 1.9.68.2-JJ above) 14.2.8.2.58 Reflect commitment in Q640.12 to verify heat transfer capability of ESF chillers 17.2.15 Reflect current policy Q210.48 Correction of valve numbers Q430.1 Augmentation of diesel generator training program to include vendor I&C recommended training Q430.19 Consistency with TS and current procedures
FSAR Paragraph Reason for Change 430.52 Revised to reflect TS Q440.10 Revised to be consistent with Q640.30; bench test of PORVs Q471.06 Staffing change; new HP superintendent Q640.10 Correction to accurately reflect testing of the containment spray system for blockage 0826V