Forwards Insp Repts 50-327/86-53 & 50-328/86-53 on 860929-1003.Violation Described in Insp Rept Under Investigation for Escalated Enforcement Action.No Notice of Violation Issued at Present
ML20214Q306
Person / Time
Site: Sequoyah  
Issue date: 11/24/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20214Q311 List:
References
NUDOCS 8612050094
Download: ML20214Q306 (2)


See also: IR 05000327/1986053

Text

h

C$

'

November 24, 1986

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Annessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

'

Gentlemen:

-

"

SUBJECT:

NRC INSPECTION REPORT NOS. 50-327/86-53 AND 50-328/86-53

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. A. Belisle on September 29 - October 3, 1986.

The inspection included a

review of activities authorized for your Sequoyah facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

, identified in the enclosed . inspection report,

~j. Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of~ procedures and

rep,resentative records, interviews with personnel, and observation of activities

in progress.

The violation described in the enclosed Inspection Report is under consideration

for escalated enforcement cction. Accordingly, no Notice of Violation is being

issued at this time, and no response to this letter is required. However, please

be advised that the number and characterization of violations described in the

enclosed Inspection Report may change as a result of further NRC review.

You

will be advised by separate correspondence of the results of our deliberations on

this matter.

-

The problem identified in this inspection report is viewed by the NRC as a

failure to successfully implement your established corrective action system.

This problem was discussed during a meeting between Region II and TVA management

on October 29, 1986. During this meeting TVA stated that proposed corrective

action for this issue was being pursued end presented an outline for this

,

corrective action. TVA is requested to document this outlined corrective

action, including specific dates for completion, and forward this information

to the NRC. Prior to the restart of either Sequoyah unit, the NRC intends to

verify that your actions have been successful.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

l

8612050094 861124

j

-

,

DR

ADOCK 0500

7

~[, Y

^

.

l

'

.

Tennessee Valley Authority

2

November 24,=1986'

Should you have any questions concerning this letter, please contact us.

-

Sincerely,

ORIGINAL SIGHED BY

L NELSOR. GRACE

Js Nelson Grace

Regional Administrator

.

Enclosure:

NRC Inspection Report

cc w/ enc 1:

4. L. Abercrombie, Site Director

Sequoyah Nuclear Plant

7. R. Wallace, Plant Manager

,

pF. A. Kirkebo, Director

Nuclear Engineering

d.L.Gridley, Director

Nuclear Safety and Licensing

/.R. Harding,SiteLicensing

Manager

bec w/ encl:

J. N. Grace, RII

LM. R. Denton, NRR

(M. L. Thompson, NRR

(g.M. Taylor,IE

B. Hayes, 01

R. Connelly, 01A

G. R. Jenkins, RII

K. P. Barr, RII

R, Gibbs, RII

LflRC Resident Inspector

NRC Document Control Desk

f"; State of" Tennessee --

-.

2

c

,,

state 01 Tennessee

l

RI

,,7

!

R % RII

RI

RII

RII

RII

,

y y

}

l

l.

'*

-

M

jan:aw.

AB isle

CAJ

an

AFGi

n

RCarroll

B

s

i

11/01/86

11/JJ/86

11/l'-/86

11/(/86

11// 3/86

/g/86

11/

6

[

,

-

,

!

,

II

RI

' '

et

Ernst

11/jC /86

11/}<>/86

~

-.

.

-

-