J'p May 22, 1987 Docket No. 50-353 1
Philadelphia Electric Company ATTN: Mr. John S. Kemper Senior Vice President Engineering and Production 2301 Market Street Philadelphia, PA 19101 l
Gentlemen:
Subject:
Meeting - April 21, 1987 This refers to the meeting held at the Limerick Generating Station Training Center on April 21, 1987, at the request of NRC Region I.
The meeting was to discuss the Limerick Unit No. 2 Preoperational and Power Ascension Test 1
Programs and was beneficial to the Region I staff in planning inspection activities for the Preoperational Tests Program at the unit.
The subjects discussed at this meeting are included in the meeting summary j
which is enclosed with this letter.
l In accordance with Section 2.790 of NRC's " Rules of Practice", Part 2, Title i
10, Code of Federal Regulations, a copy of this letter and the enclosed report will be placed in the NRC's Public Document Room.
No reply to this letter is required; however, should you have any questions concerning this matter, we will be pleased to discuss them with you.
1 Lee H. Bettenhausen Acting Deputy Director Division of Reactor Safety i
Enclosure:
Meeting Summary cc w/ enc 1:
S. J. Kowalski, Vice President, Engineering and Research 1
W. T. Ullrich, Superintendent, Limerick 2 Project
)
J. M. Corcoran, Quality Assurance Manager Troy B. Conner, Jr., Esquire Eugene J. Bradley, Esquire, Assistant General Counsel Public Document Room (PDR) local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
]
Commonwealth of Pennsylvania 1
0FFICIAL RECORD COPY LIMERICK MEETING 4/21/87 - 0001.0.0 g 870604o327 e70522 p
ADOCK 05000353
[I DR 3
PDR 1*
4 i
i 1
Philadelphia Electric Company 2
bec w/ encl:
Region I Docket Room (with concurrences)
Section Chief, DRP Robert J. Bores, DRSS
]l h 1 0
RIiDRS
- DRS Evans /djh rk h
Bettenhausen- --
5//0/87 5A7/87 5/2V87 Sfd87 0FFICIAL RECORD COPY LIMERICK MEETING 4/21/87 - 0001.0.1 05/11/87
. ~.
D i
l' i
I DOCKET NO.:
50-353 i
LICENSE NO.:
CPPR-107 APPLICANT:
Philadelphia Electric Company (PECo) l FACILITY:
Limerick Unit 2 1
i
SUBJECT:
j' NRC/PECo Management Meeting Concerning Limerick Unit 2 Preoperational and Power Ascension Test Programs on j
April 21, 1987 i
4 t
i
SUMMARY
A meeting was held at the request of NRC, Region I on April 21, 1987, at the Limerick Generating Station (LGS)
Training Center to discuss the Limerick Unit No. 2 Start-up Test l
Program. This meeting was beneficial for both the NRC and the i
l licensee.
Philadelphia Electric Company Attendees 1
I W. Alden, Licensing Engineer l
M. Cooney, Manager, Nuclear Support l
J. Corcoran, Manager, Quality Assurance (QA), LGS Unit 2 1
D. DiPaolo, Branch Head, QA, LGS Unit 2 i
P. Duca, Startup Superintendent, LGS Unit 2 D. Fetters, Engineering Project Manager J. Franz, Manager, LGS J. Grimes, Testing and Laboratories Lead Engineer 1
1 J. Hutton, Operations Coordinator, LGS Unit 2 D. Kelsey, Instrumentation and Controls and Preventive Maintenance Coordinator K. Meck, QA Engineer C. Mengers, Licensing Engineer J. Milito, Supervising Engineer J. Nagle, Test Review Board (TRB) Chairman, LGS Unit 2 R. Panunto, Lead Electrical Field Engineer, P. Pavlides, Director QA i
T. Robb, Engineering and Research Licensing LGS Unit 2 I
W. Ullrich, Superintendent, LGS Unit 2 T. Vandeventer, TRB j
i General Electric Company Attendees R. Ballou, Startup/ Operations A. Jenkins, Startup/ Operations Bechtel Power Corporation Attendees J
W. McCullough, Project Startup Engineer OFFICIAL RECORD COPY LIMERICK MEETING 4/21/87 - 0001.1.0 05/04/87
_____._._-._.,.l
[
1 US Nuclear Regulatory Commission Attendees L. Bettenhausen, Acting Deputy Director, DRS J
L. Briggs, Lead Reactor Engineer B. Clayton, Regional Coordinator, Headquarters M. Evans, Reactor Engineer, TPS, OB, DRS R. Gramm, Senior Resident Inspector, Limerick Unit 2 J. Johnson, Acting Chief, Operations Branch, DRS T. Kenny, Acting Chief, Projects Section 2A, DRP S. Kucharski, Resident Inspector, Limerick Unit 1 J. Linville, Chief, Projects Section 2C, DRP MEETING REPORT
SUMMARY
During this meeting, several representatives from the Philadelphia Electric Company and Bechtel Power Corporation, presented an overview of the LGS Unit 2 Start-Up Program.
Specific items discussed included:
l Test Program Administration and Organization; Construction Testing including Blue Tag Tests; l
Start-Up Testing including Technical and Preoperational Tests, i
Test Review Board; QA/QC Program; Operator Staffing and Responsibilities; and Start-Up Schedule.
Philadelphia Electric Company described their plans to use the results of Blue Tag Tests and Technical Tests to satisfy some preoperational testing require-ments. The NRC stated that this method would necessitate a fully auditable system where the Blue Tag and Technical Tests receive the same level of review and approval as Preoperational Tests. The licensee stated that a system would j
be established to fully control those activities.
NRC Region I Staff briefly described the NRC's Inspection Program for Pre-operational and Power Ascension Test Programs.
This management meeting is the initial activity of the NRC preoperational test program at the Limerick Unit 2 facility.