ML20214Q219
| ML20214Q219 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/21/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20214Q221 | List: |
| References | |
| NUDOCS 8612050041 | |
| Download: ML20214Q219 (3) | |
See also: IR 05000424/1986102
Text
. . . ..
.
.,...
.
._
..
.
m
b
o'-.
g
November 21, 1986:
.
Docket No. 50-424
License.No.:CPPR-108
_
orgia Power Company
ATTN: - Mr. J. H. Miller, Jr.
-
President
,
- .
P. 0. Box 4545
Atlanta, GA 30302
-
4
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-424/86-102
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
l
. M. F. Runyan on October 20-23, 1986.
The inspection included a review of
.
. activities authorized for your Vogtle . facility.
At .the conclusion of the
inspection, the findings were discussed with those members of'your staff identi-
fied in the enclosed inspection report.
$
Areas examined during the.-inspection are identified in the report. Within these
!
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with perso_nnel, and observation of activities
l
in progress.
Within the scope of the. inspection, no violations or deviations were identified.
,
!
In accordance with Section 2.790 of the NRC's " Rules of. Practice," Part 2
i.
Title 10, Code of Federal Regulations, .a copy of this letter and its enclosure -
will be placed in the NRC Public' Document Room.
l
l
Should you have any questions concerning this letter, please contact us.
l
Sincerely,
!
(Original signed by V. L. Brownlee )
Virgil L. Brownlee, Chief
j
Reactor Projects Branch 3
j
Division of Reactor Projects -
i
I
Enclosure:
'
NRC Inspection Report
I
i'
cc w/ encl: .(Seepage-2)
}
!
B612050041 861121 A
j-
ADOCK 05000424
G
-
m
i
-
ggO\\
c
. - _ .
- _ _ .
4
.
,
'
Georgia Power Company
2
November 21, 1986
pc w/ encl:
VJ. P. O'Reilly, Senior Vice President
!.NuclearOperations
R
E. Conway, Senior Vice President &
"
j Project Director
' D. O. Foster, Vice President, Project
<
Support
_
-
/P.D. Rice,VicePresident, Project-
/ Engineering
V R. H. Pinson, Vice. President, Project
/ onstruction
C
.-
VJ. T. Beckham, Vice President & " '
M.GeneralManager-Operations
A. Thomas, Vice President,
/. Licensing
D
S. Read, General Manhger,
v6.QualityAssurance
W. Hayes, Vogtle Quality
/ Assurance Manager
W. C. Ramsey, Manager -
'
'
Readiness Review
/G. B. Bockhold, General Manager,
d. Nuclear Operations
Gucwa, Manager, Nuclear Safety
j and Licensing
"g
VM. H. Googe, Project
Construction Manager
/E. D. Groover, Quality
Assurance Site Manager -
'j' Construction
VJ. A. Bailey, Project Licensing
Manager
/G.F.Trowbridge,Esq.,Shaw,
/ Pittman, Potts and Trowbridge
VB. W. Churchill, Esq., Shaw,
/.Pittman, Potts and Trowbridge
E
L. Blake, Jr., Esq., Shaw,
/ Pittman, Potts and Trowbridge
VJ. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
VJ. G. Ledbetter, Commissioner,
/ Department of-Human Resources
VC. H. Badger, Office of Planning
j and Budget
j
VD. Kirkland, III, Counsel,
,
Office of the Consumer's Utility
'l
Council
D. Feig, Georgians Against
Nuclear Energy
,
(cc w/enci cont'd - see page 3)
_ _ - - - - _ - _ - - _ - -
.
November 21, 1986
Georgia Power Company
3
i
- j(cc w/ enc 1 cont'd)
v M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
/Dr. O. H. Paris, Administrative Judge
Panel
Atomic Safety and Licensing Board
/ Panel
J G. A. Linenberger, Jr., Administrative Judge
Atomic Safety.and Licensing Board
/ Panel
v1. P. Garde, Citizens Clinic, Director
Government Accountability Project
cc w/ encl:
. Reis 0GC
W. M. Hill, IE
M. Miller, NRR
4.Brach,0GC
/M. Sinkule, RII
/ . Christnot, RII
~
. Gibbs, RII
NRC Resident Inspector
Document Control Desk
State of Georgia
RII
RII
R
RII
RIT
MS nkule
MRunyan:cdg
GBelisle
an
AG
on
-
-
,
lj/y/86
JO/ d/86
10/
10/
86
/ /86
ll
// /1 $6
0
C