Summary of 861118 Meeting W/Util,Bechtel,Westinghouse & Shaw,Pittman,Potts & Trowbridge Re Revised Containment Temp Profile.List of Participants Encl
ML20214Q072
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/25/1986
From: Mark Miller
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8612040504
Download: ML20214Q072 (5)


Text

/

snRitv*

, ,og UNITED STATES

! o NUCLEAR REGULATORY COMMISSION l #'g *E WASHINGTON, D. C. 20555

, , e s...../

Locket Nos.: 50-424 and 50-425 AFPLICAFT: Georgia Power Company FACILITY: Vogtle, Units 1 and 2

SUBJECT:

SUPMARY OF MEETING TO DISCUSS V0GTLE CONTAINMENT TEMPERATURE PROFILE On November 18, 1986, the staff met with the applicant and its representatives to discuss the applicant's revised containment temperature profile for equip-ment qualification. Participants are listed in the enclosure.

The applicant had provided input information to the computer code used to calculate the revised containment profile of 320*F by letter dated November 13, 1986. The main steamline break (MSLB) scenario was used since it produces the highest containment temperature. The staff had outckly re-viewed this infomation prior to the meeting. The staff questioned the applicant's use of 14.7 psia as the initial containment pressure when the Technical Specifications indicate that pressure can be as low as 13.2 osia.

The applicant explained that a pressure such as 13.2 psia is not possible during an MSLB and indicated that a value of 14.7 psia was reasonable.

The staff inquired about the size of the Vogtle containment. The applicant indicated that the Vogtle containment has a 140 ft, diameter and is 158 ft.

in height with a 70 ft. radius on the dome making it 23 ft. higher than the SNUPPS containment.

The staff and applicant discussed the use of two separate profiles: one for containment response and another for equipment qualification. The staff stated that one curve is accepted for both purposes. However, the applicant indicated that Palo Verde had 2 separate curves presented in FSAR Section 6 with the equipment qualification profile at a lower temperature than the con-tainment profile.

The staff expressed concern that the 320 F profile was tco low fo a Westing-house 4-1000, large, dry containment. The applicant indicated that Byron has a profile of 318*F.

The staff questioned the ability of the fan coolers to respond within their duty curve if a very rapid temperature rise occurs. The applicant explained that it had takcn a delay in fan cooler start into account in its analysis.

The staff pointeo out that the value of 8.15 x 105 in FSAR Table 6.2.1-3 is inconsistent with Table 6.2.2-2 and needs to be corrected. The applicant stated that the FSAR would be revised, h200504861125 A DOCK 05000424 PDR 1

b.7 The staff questioned the applicant's large. heat sink values in the Vogtle analysis, in particular the piping values. The applicant provided heat sink ccn.parative infonnation in that the Vegtle heat sink totals are 10% larger than those of Palo Verde. The applicant clso indicated that it reviewed many drawings to accurately compile piping areas es well as relied on the piping infonnation in FSAR Table 6.1.2-2. The staff questioned how the applicant considered heat transfer across piping plus the applicant's boundary conditions. The applicant responded that it only took credit for uninsulated piping containing anibient water. The staff expressed its concern that the applicant did not consider hot piping as a heat source contributing to con-tainment terrperature.

Due to the various staff questions, the applicant concluded at the end of the meeting that it would rot be able to resolve staff concerns in time to allow completion of environmental equipment qualification issues to support licensing of Vogtle Unit 1. Instead, the applicant stated that it would pursue a thenral lag analysis from 352 F which is the approved containment profile as discussed in the SER. A meeting to discuss the thermal lag analysis was tentatively set for November 25, 1986.

Pelanie A. Miller, Project Manager PUR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page Flyi4[S)WR-A PW PWR-A MtImer/mac BJYoungblood 11/ /86 11g/86

,, . s .

Enclost're ,

PARTICIPANTS NRC BECHTEL

11. Miller J. Failey J. Huang J. Purucker P. Ballard P. Barbour G. Bagchi S. Freid C. Li GEORIGA POWER COMPANY SOUTHERN COPPANY SERVICES T. Penland J. Bailey R. Thomas J. Preless WESTINGHOUSE SHAW. PITTMAl', FCT15, Af;D TROWBRIDGE J. Butler D. Lewis Pt. Shannon C. Benten

e O '

g g.

,5 ' 6, sQ s*

9,i.o%o,+ >Y q 00 s

f O, 4%g ,,"

hf 4^c

^

S S f f+,

f S%

eS e, o ego,' o % ,e c

^

O 0 8 r 9 I:# 9  % -

% 9 (f

  • v,*d $1-'s% 7 S

' 0$* o<,%*,.

o 5e,

+% e q<r % o s

<o s

, s.

o .c o e,e c' < , T ' S o+ & $,

C e ,% ' d 4 << * -

., f, o, 'd Y,*c <,i gs t o, G y p O 5 4

a

,%{%% 4 54 00 #g ,

,4,

,0c ~%,

" g%

s. g,sg. . .

"*/, g S

,,;g

!f,5g;+

,A q,.g

. "O ', U+

g. , -

J},Tf 4

                       ??%' q 6,*e
              g                                                                                             S                                                  s
            "               **> "i,.

M'+t+4,$,g,,;%

                                                                                                          "         "o,,              e%9%
    $@",$IO                                                                                           ,       i                .
s. ,f**s .$a?t a+  %'1 t
                                                                . .e %          w4  t v,  'ot o,# s%^ $u            <S 'i 4

g  ?'@<g -7 9 q%,%, g% y ve,v,' b , ' 'st, f,e"g' d'  %,%%l%'Sl%lg o

                                                                               "s g       %

C; f  :

                                                                                                                                                                                        ,     /
                                                                                                  &                                                    ;; * . -w a 1,.,         j "
                                                                                                                                                .(

l* R 1 v',_ gg

                                                                                                                   ...-g+b
                                                                                                                      ^                                ,y a

N

                                                                            .r
                                                                                                                                          )  ,
                      ,,a
                                  /
ay
                                                        ~
   ,eorgia     er Company                                 Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Conraission Georgia Power Corpany P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 3083C Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company / Suite 225 Southern Company Services, Inc. 32 Peachtree Street, N.W. P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Donald O. Foster Troutman, Sanders , Lockeman, Vice President & Project General Manager & Ashmore - Georgia Power Company Candler Building ( Post Office Box 299A, Route 2 127 Peachtree Street, N.E. Waynesboro, Georgia 30830 Atlanta, Georgia 30303 $ Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc. P.O. Box 2625 Carol Stangler Binningham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr. Atlanta, Georgia 30307 Bruce W. Churchill, Esq. Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W. Washington, D. C. 20037 Mr. G. Bockhold, Jr. Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 R$gionalAdministrator,RegionII U.S. Nuclear Regulatory Comission 101 Marietta Street, h.W. , Suite 2900, Atlanta, Georgia 30323

           /

f < .. J' 0 r

                                                  ~

Georgia.Cnsdbay yr, n : F Power Company Vogtle Electric Generating Plant

                                          +

CC: Fr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Conruission Georgia Power Cerpany P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Fr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company / Suite 225 Southern Company Services, Inc. 32 Peachtree Street, N.W. P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Donald 0. Foster Troutman, Sanders , Lockeman, Vice President & Project General Manager & Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E. Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc. P.O. Box 2625 Carol Stangler Binningham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr. Atlanta, Georgia 30307 Bruce W. Churchill, Esq. Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W. Washington, D. C. 20037 Mr. G. Bockhold, Jr. Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regioncl Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. , Suite 2900 Atlanta, Georgia 30323

MEETING

SUMMARY