ML20214P893
| ML20214P893 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/27/1987 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8706040152 | |
| Download: ML20214P893 (2) | |
Text
._
9 TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place MAY 271987 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 - NEC OIE INSPECTION REPORT NOS.
50-327/86-68 AND 50-328/86-68, " SAFETY SYSTEMS OUTAGE MODIFICATION INSPECTION" Stewart D. Ebneter's April 24, 1987 letter to S. A. White, which transmitted a notice of seven violations, required a response by May 24, 1987.
Based on a c
conversation between M. R. Harding and G. G. Zech on May 20, 1987, the due date for the subject inspection report response has been extended by 30 days to June 23, 1987.
If you have any questions, please call M. R. Harding at (615) 870-6422.
Very truly yours, TENNESSEE VALLEY AUTHORITY f
A./m R. Gridley, Director Nuclear Safety and Licensing cc: See page 2
~
B706040152 870527 j
PDR ADOCK 05000327 G
PDR of 9s An Equal Opportunity Employer
/O
I
.. '~
1 U.S. Nuclear Regulatory Commission 9
i cc:
Mr. G. G. Zech, Assistant Director
'I for Inspection Programs office of Special Projects U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlar ta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379
-. _... _ _.. ~,,, _
,