Text
N
3
b
utQ
<
.
,
my 2 11987
Docket No. 50-424
License No. hPF-68
orgia Power Company
TTN: Mr. James P. O'Reilly
Senior bice President-
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT N0. 50-424/87-24)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. T. Burnett on March 6-20, 1987.
The inspection included a review of
l
activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report,
,
Areas examined during the inspection are identified in the report.
Within
these araas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements, and
elements to be included in your response are described in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
j
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us,
SincerelyhCNEDBY
ORIGINAL
ALAN R. HERDT
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
cc w/encis:
(See page 2)
e
8706030334 870321
ADOCK 0500
4
a
I
I
.Cso/
L
-
_
_
,
MAY 2 11987
,
Enclo'sures:'
1.
2.
NRC Inspection Report
pc w/encls:
y'R. E. Conway, Senior Vice President &
Project Director
/C. Whitney,GeneralManagerProject
Support
y'P. D. Rice, Vice President, Project
Engineering
/R.H.Pinson,VicePresident, Project
Construction
,
y C. W. Hayes, Vogtle Quality
Assurance Manager
/G.B.Bockhold,GeneralManager,
Nuclear Operations
/L.Gucwa, Manager,NuclearSafety
and Licensing
v'd. A. Bailey, Project Licensing
Manager
vt. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
/J.E. Joiner,Troutman, Sanders,
j Lockerman and Ashmore
vJ. G. Ledbetter, Connissioner,
Department of Human Resources
/C. H. Badger, Office of Planning
and Budget
s/D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
f.Feig,GeorgiansAgainst
Nuclear Energy
v41. B. Margulies, Esq. , Chairman,
Atomic Safety and Licensing Board
vdr.anel
P
O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
v6. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
fccw/encls:
E. Reis, 0GC
W. M. Hill, IE
I M Miller, NRR
f.Brach,ED0
M' Sinkule, RII
.
E. Christnot, RII
J NRC Resident Inspector
Document Control Desk
l
stato nf r:anrnia
RII
RII N
RI
R
RII
p
PTBurnett:tj
p FJJ pe
Al rdt
TP bles
MSinkule
,f////87
5////87
/87
4
87
, ,37 LQ87
.
.
-
-
- - -
-
-
-
-
-
-
-
-