ML20214P139
| ML20214P139 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/25/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| References | |
| NUDOCS 8612040087 | |
| Download: ML20214P139 (3) | |
See also: IR 05000424/1986047
Text
f
'
'r
NOV 2 51986
'
Docket No. 50-424
License No. CPPR-108
orgia Power Company
TTN: Mr. J. H. Miller, Jr.
President
P.O. Box 4545
Atlanta, GA30302
Gentlemen:
-SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 12
ELECTRICAL CABLES AND TERMINATIONS--REPORT NO. 50-424/86-47
The NRC has completed a detailed review, inspection, and verification of the
_
subject module which you submitted to the NRC on April 2,1986.
Periodic
inspections were conducted at the Vogtle site and the resultant findings were
discussed 'with members of your staff at the conclusion of these inspections.
Technical reviews were conducted primarily in NRC Bethesda offices and the
findings from these reviews have also been discussed with your staff.
Areas contained in the module, which were reviewed, examined, and verified,
are identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
The results of Module No.12 reviews.and inspections are summarized into the
categories of inspector followup and unresolved items. Your attention is invited
to these matters which will be pursued during future licensing reviews and
. inspections.
Based _ upon the NRC review and inspection of those activities identified in the
module, we have determined that the applicant's activity control programs for 1E
electrical cables and terminations at Vogtle Unit No.1 are acceptable and comply
with applicable regulatory requirements with the exception of those items or
areas identified in the Report.
This decision is based on information currently
available to the inspectors and reviewers.
Should information subsequently
become available which was not considered during this review or which conflicts
with earlier information, it will be evaluated to determine what effect it may
'have on the above conclusion.
Should you have any questions concerning this letter, please contact us.
Sincerely,
DREINAL S!GNED BYi
00$[$
4
2.I!Dl0N GRACf!
J. Nelson Grace
Regional Administrator
~ Enclosure: (See page 2)
1
1 f
[E O l _
,
.
.
.
NOV 2 51986
Georgia Power Company
2
Enclosure:
Peport No. 50-424/86-47
cy w/ encl:
go. P. O'Reilly, Senior Vice President
fuclear Operations
LK. E. Conway, Senior Vice President &
d.ProjectDirector
O. Foster, Vice President, Project
Jupport
cf. D. Rice, Vice President, Project
Engineering
f.H.Pinson,VicePresident, Project
jconstruction
(4. T. Beckham, Vice President &
Jeneral Manager - Operations
(fr. A. Thomas, Vice President,
Licensing
1F. S. Read, General Manager,
gualityAssurance
LL W. Hayes, Vogtle Quality
ssurance Manager
. C. Ramsey, Manager -
_ Aeadiness Review
,
L4. B. Bockhold, General Manager,
'
Nuclear Operations
p. Gucwa, Manager, Nuclear Safety
d.andLicensing
H. Googe, Project
Jonstruction Manager
ty. D. Groover, Quality
Assurance Site Manager -
Jonstruction
W. A. Bailey, Project Licensing
anager
,
. F. Trowbridge, Esq., Shaw,
Pittman, Potts and Trowbridge
()(W. Churchill,Esq.,Shaw,
S[Pittman,PottsandTrowbridge
L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
d E. Joiner, Troutman, Sanders,
, A ockerman and Ashmore
1/J. G. Ledbetter, Commissioner,
A epartment of Human Resources
T. H. Badger, Office of Planning
nd Budget
. Kirkland, III, Counsel,
Office of the Consumer's Utility
'
Council
._
..
..
-
-
_ _ _ _ _ - _ _ _ _ _ _ _ _ . _ _ _ - _ _ _
- _ _ _ _ _ _ - _ .
__
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _
_
____
.
..
.
,_
- '
...
-2
NOV 2 51986
Georgia ' Power Company
3
cc w/ encl:
(cont'd)
e4 . Feig, Georgians Against
clear Energy
. B.-Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Mr.anel
P
O. H. Paris, Administrative Judge
Atomic Safety and Licensing. Board
Panel
d A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
bec w/ encl:
ef. Reis, OGC
.dd M. Hill, IE
f. Miller,NRR
p@.Brach,EDO
Sinkule, RII
ti. Christnot, RII
(plRC Resident Inspector
Document Control Desk
State of Georgia
x
_
RII
RII C -7
RII
RII.
RII
H
hg
TConlon
AHe-dt
VP nciera
MSinkule
9/.30/86
f/t/86
g /gn/86
9/ /26 -
9/ /86
6
RI
R aue(r/jt p #r
m t~
TNovak
i.es
EChristenb6ry
C
.9/ W 8b
A/ /86
9/
6
&/ /86
lq cpgl
U fR/86
li
19 66
M S*I
of%
l
,
.
l
.-
- _.
_,
,e-
.
.
NOV 2 51986 '
Georgia Power Company
3
cc w/ encl:
(cont'd)
v D. Feig, Georgians Against
clear Energy
. B. Margulies, Esq., Chairman,
-Atomic Safety and Licensing Board
/r.anel
P
0. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
N' A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
bec w/ encl:-
it. Reis, OGC
g M. Hill, IE
g)t. Miller, NRR
p.Brach,EDO
- @ Sinkule, RII
J . Christnot, RII
@RC Resident Inspector
Document Control Desk
State of Georgia
s
~.
I
!J
l
RII
RII C
RII
RII.
RII
H
hg
TConlon
AHe dt
VP nciera
MSinkule
A/ !W
9/ /86
'
9/30/86
}/tj /86
y / n/86
G \\
RI)e/fsk
7
WK r
Luq (w
rRha
TNovak
i.es
EChristenbary
k,
er
.9/ -186--~~
A/ /86
9/
6
4/ /86
l[qq gk
U fRf86
in
U) 6b
MbeY
fin
\\
,
'
!
4