Ack Receipt of 870223 Response to Request for Addl Info Re Violations Noted in Insp Repts 50-321/86-28 & 50-366/86-28. Basis for Denial of Request That Violations Be Classified as Severity Level V Discussed in Encl
ML20214N682
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/19/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
References
NUDOCS 8706030015
Download: ML20214N682 (3)


See also: IR 05000321/1986028

Text

,

. ~s SGA

gg 19 DO

Georgia Power Company

ATTN: Mr. James P. O'Reilly

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

"

Gentlemen:

SUBJECT: REPORT NOS. 50-321/86-28 AND 50-366/86-28

Thank you for your response of February 23, 1987, to our request for additional

~

information letter, dated January 12, 1987, concerning activities conducted at

your Plant Hatch facility. The additional information was appreciated and

taken into consideration.

4 After careful consideration of the bases for your request that the violations

be classified as Severity Level V violations,-we have concluded, for the

. reasons presented in the enclosure to this letter, that the violations should

remain as presented in the Notice of Violation.

We have evaluated your responses to the two violations and found that they meet

the requirements of 10 CFR 2.201. We will examine the implementation of your

corrective actions during future inspections.

.

We appreciate your cooperation in this matter,

j

Sincerely,

'

DFJ2:". O EDGL

1 NEx. C.d

J. Nelson Grace

Regional Administrator

Enclosure:

Staff Assessment of Licensee Request

c w/ enc 1:

. T. Beckham, Vice President, Plant Hatch

. C. Nix, Site Operations General

Manager

_/A. Fraser, Acting Site QA Supervisor

/L. Gucwa, Manager, Nuclear Safety

and Licensing

bec w/ enc 1: ,

Document Control Du k

ftateofGeorgia

'

]

NfC Resident Inspector i

\)1 ugh S. Jordan, Executive Secretary l

8706030015 870519 2 )

PDR ADOCK 05000321 '

G PDR: j l

\ ' ZEo]

. . - - - - - _ _ _ _ - _ - _ . .

__

'

+

.- 2

4 j

'

!

1

Georgia Power Company 2: g g 1987

bcc.w/en-?: . .

' Document ;ontrol Desk.

' State of Georgia-

'NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

a

RIIQ4 RII RII A. RII

dot 5Ad -

MSeett:tj- FCa/0

ntrell TEM AS 94

'! =6th

-a PJ., -

5/(q /87 5// 87 5lp 5//Y/87 l$/87

- _ .

.

.

..

ENCLOSURE

STAFF ASSESSMENT OF LICENSEE REQUEST

After evaluating the information provided, we have determined that the two

violations are properly classified as Severity Level IV violations for the

following reasons:

Violation A: The control room ventilation surveillance procedure did not

contain instructions to ensure the technical specification

requirements were met.

Violation B: The surveillance frequency specified in the technical

specifications was not met. The Plant Hatch Surveillance

Coordinators' records are not considered as appropriate quality

. records for performance of the surveillance procedure on

October 25, 1982, and December 6, 1985. Likewise, the undated

affidavit prepared and signed with no supporting data, as the

result of the inspectors' findings, to document the December 6,

1985, surveillance does not constitute a quality record.

We do not agree that you have shown that the violations had no

potential safety consequences. The technical specification

requirements ensure that the system functions as analyzed to

meet the requirements of 10 CFR 50, Appendix A, Criteria 19.

The potential safety consequences associated with a failure to

meet 10 CFR 50, Appendix A, Criteria 19 requirements constitute

a violation which is of more than minor safety or environmental

significance.

,