ML20214N410
| ML20214N410 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/22/1987 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| Shared Package | |
| ML20214N412 | List: |
| References | |
| NUDOCS 8706020166 | |
| Download: ML20214N410 (2) | |
See also: IR 05000321/1987008
Text
-4
C/
N
g 22
Docket Nos. 50-321, 50-366
License Nos. OPR-57, NPF-5
eorgia Power Company
ATTN:
Mr. James P. O'Reilly
,
'
Senior Vice President-
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-321/87-08 AND 50-366/87-08
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. Holmes-Ray on March 28 - April 24, 1987
The inspection included a review
of u tivities authorized for your Hatch facility. At the conclusion of the
ins,ection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Your attention is invited to unresolved item identified in the inspection
report. This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
CRIGINAL SIGNED BY
VIRCil L. BROWNLEE
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
(See page 2)
0706020166 070522
ADOCK 05000321
0
\\
t
pfel
' ' ' ,
l
Georgia Pcwer Company
2
22 19 6 I
Enclosure:
NRC Inspection Report
pc w/ encl:
vjJ. T. Beckham, Vice President, Plant Hatch
y H. C. Nix, Site Operations General
Manager
. Fraser, Acting Site QA Supervisor
L. Gucwa, Manager, Nuclear Safety
and Licensing
[NRCResidentInspector
cc w/ encl:
fughS. Jordan,ExecutiveSecretary
Document Control Desk
State of Georgia
1
l
RII [-
R I I,
Rd'o)teau:es
j'h
'
FCantrell
S/ZI/87
SRt /87
- -