ML20214M837

From kanterella
Jump to navigation Jump to search
Forwards App to SALP 6 Board Repts 50-456/87-01 & 50-457/87-01 for Dec 1985 - Nov 1986,summarizing 870317 Meeting
ML20214M837
Person / Time
Site: Braidwood  
Issue date: 05/27/1987
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20214M840 List:
References
NUDOCS 8706010444
Download: ML20214M837 (2)


See also: IR 05000456/1987001

Text

p.

- >-

u

-

,

.

,

bad

..

,

,

Docket No. 50- 156

Docket No. 50-s57

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

!

-Post Office Box 767

i

Chicago, IL 60690

Gentlemen:

,

1

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP) 6

Board Report for the Braidwood Station, our meeting of March 17, 1987, which

discussed in detail the contents of the report, and your written comments

dated April 16, 1987, relative to the report.

Attached, ar, an Appendix to the SALP Board Report, is a summarization of our

,

'

meeting which includes names of those persons in attendance.

Issuance of the

Appendix serves as the final step in our SALP assessment process,

i

In accordance with Section 2.790 of the NPM'S " Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter with the

referenced attachments will be placed in the NRC's Public Document Room.

No reply to this letter is required; however, should you have questions on the

conclusions reached by the NRC, please let us know and we will be pleased to

discuss them with you.

=2

Sincerely,

,

8706010444 870527 ^

Ca*IMr.et st.74d by

.

PDR

ADOCK 05000456

1

o

PDR

A. Bert Davis

i

,

Regional Administrator

Attachments:

1.

Appendix to SALP Board Reports

.; _

No. 50-456/87001;

'

No. 50-457/87001

2.

Licensee Response dtd

April 16, 1987

j.

See Attached Distribut. ion

/

'

R111

' A

RI I

R

RI

RIII

1

.

ly.

3r;-]ffD

4

W

elkk/NI)

'

JMcCo

a er Sct eibinz

L

leL

No

us Chrissotimos

!

ke

s

a

>

>

.

d

iello

Davis ,

l

f

)

spw

q +ler

(y

4

.

, . ,

._.

__.

_

, _ . . - .

- . . , _ , - . . ,

. = , . . ~ . _

, . . . , . , ,

, . . , ,

r

.

Commonwealth Edison Company

2

Distribution

cc w/ attachments:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, OGC

G. Berry, OGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

J. M. Taylor, Deputy Executive

Director for Regional Operations

T. E. Murley, Director, NRR

Regional Administrators

RI, RII, RIV, RV

L. W. Zech, Chairman

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

K. M. Carr, Commissioner

J. A. Stevens, NRR Project Manager

F. Maraglia, NRR Division Director

J. Lieberman, Office of Enforcement

M. R. Johnson, SALP Coordinator

RIII PRR

RIII SGA

State Liaison Officer, State

of Illinois

INP0