Advises That Portions of 860729 Rev 19 to Security/ Contingency/Training & Qualification Plan Consistent W/ Provisions of 10CFR50.54(p) & Acceptable.Portions Decreasing Plan Effectiveness Discussed in Withheld Encl 1
ML20214M759
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/05/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 8609110266
Download: ML20214M759 (2)


Text

- _ _ - __

SEP 5 1986 In Reply Refer To:

Docket:

50-285 Omaha Public Power District ATTN:

R. L. Andrews, Division Manager-Nuclear Production

~1623 Harney Street Omaha, Nebraska 68102

Dear Mr. Andrews:

This is in response to your letter of July 29, 1986, regarding Revision 19 changes to the Fort Calhoun Station Security / Contingency / Training and Qualification Plan. We have reviewed the information contained in the plan revision and have determined that portions of the revision are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable. However, as indicated in Enclosure 1, certain other portions decrease plan effectiveness and are therefore inconsistent with the provisions of 50.54(p). Accordingly, you are.to follow the previously approved plan in regard to these items.

Resubmit corrected plan pages as necessary to maintain plan continuity.

Should you want to pursue changing the security plan with the changes set forth in Enclosure 1, you should resubmit under the provision of 10 CFR 50.90.

If you have any questions concerning this matter, please contact Mr. A. B.

Earnest at (817) 860-8146.

Sincerely "Onginal Signed by:"

J. E. Gagliardo, Chief Reactor Projects Branch

Enclosure:

Safeguards Enclosure cc w/o safeguards enclosure:

W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 (cc continued on next page)

I s

RI C:EP&S,S C:R&SPBh C:RPB[

C:RPB

/

AB

/jt LAYandtrT WLFisher DRH ter JEGag (do 1/3/86

'l/ 9 /86 9/y/86 9/ /86

}/g Casework No. 50-285/06-XA ENCLOSURE CONTAINS

\\

SAFEGUARDS INFORMATION.

8609110266 860903 UPON SEPARATION TH13 1

ADOCKOS00g5 PAGE IS DECONTROLLEi).

I DR

=

Omaha Public Power District Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bpc w/o safeguards enclosure and ltr. dated 7/29/86 4A)MB(RG01) bec w/ safeguards enclosure and licensee's ltr. dated 7/29/86:

RIV Security File G. McCorkle, NMSS J. Gibson, SSPD/NRR Resident Inspector R. Martin Security Inspector Chief, EPSPS bec w/o safeguards enclosure and w/ltr. from licensee dated 7/29/86 RPB D. Weiss, LFMB (AR-2015)

Section Chief (RPSB)

RIV File RITS Operator R&SPB R. L. Bangart, DRS&S E. H. Johnson, DRS&P W. L. Fisher, R&SPB 50.54(p) book NRR Docket File f

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED.

i l

l

l VN Omaha Public Power District

@b b

1623 Harney Omaha. Nebrdska 68102 2247 402 536 4000 July 29, 1986 LIC-86-360

-'p REVIEWED BY:

egio d in or J. K. Gasper M

U.S. Nuclear Regulatory Commission (NAME) f (SIGN /TURE)

Region IV 611 Ryan Plaza Drive, Suite 1000 M n ge_r-Administrative Servicts 7/23/85 Arlington, Tx. 76011 o

i

~D

References:

1.

Docket No. 50-285 2.

Letter OPPD (R. L. Andrews) to NRC (R. D. Martin) dated July 31, 1986 (LIC-85-353) 3.

Letter NRC (J. E. Gagliardo) to OPPD (R. L. Andrews) dated May 23, 1986 l

Dear Mr. Martin:

Transmittal of Fort Calhoun Station Security Plan Revision The purpose of this letter is to submit changes to the Fort Calhoun Station Site Security Plan in accordance to 10 CFR 50.54(p).

Specifically, this letter serves two purposes.

The first is to establish a new position within the Fort Calhoun security force.

The second is to provide a response to Reference 3, which contained descriptions of portions of the Reference 2 Security Plan Revi-sion 16, that were either unacceptable to the NRC or required clarification.

The new position to be added to the Fort Calhoun Security Force is that of the l

Nuclear Watch Officer. includes the site security plan change that establishes this position.

Included in this Enclosure is an explanation and justification of the tasks to be performed by this officer. contains OPPD's response to the comments provided by the NRC in En-closure 1 of Reference 3.

(to the site security plan The enclosure contained comments regarding changes In Enclosure 2, a response)is provided to each comment.that were considered by th

, Enclosure 3 contains OPPD's response to the comments provided by the NRC in En-closure 2 of Reference 3.

(to the site security plan) that required clarification.The enclosure contained commen In Enclosure 3 a re-sponse is provided to each comment, v.W":t * :G g s,,

'suGE iS FPCmBtTED, g[C,

' t.ERGY ACT 1954 ANS1 CR,e

.'. COLAT;CNS SUBJECT TO civil AND CRIMINAL SANCTIONS D

\\

0 r

..,.m.

m~

19, -F.

u O. Martin IC-86-360 Page 2 consists of the actual revised pages of the Fort Calhoun Station Site Security Plan that represent Revision 19 (with the exception of those pages appearing in Enclosure 1).

It should be noted that OPPD has met with Region IV staff members to discuss specifics of this plan change prior to our submittal.

These changes are being submitted pursuant to 10 CFR 50.54(p).

These changes should be incorporated into your copy #6 of the Fort Calhoun Station Site Security Plan.

If you have any questions, please do not hesitate to call.

Sincerely,

/if '

R. L. Andrews Division Manager Nuclear Production RLA/JRG/me Enclosures cc: w/o Enclosures LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.

Washington, DC 20036 D. E. Sells, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector cc: w/ Enclosures H. R. Denton, NRC Director-0ffice of Nuclear Reactor Regulation (copy #7) v 1