Forwards Draft Addendum to SAIC-87/3004, Review of Risk- Based Evaluation of Isap Issues for Connecticut Yankee..., Re Review of Facility Probabilistic Safety Study.Rept Should Be Finalized by mid-June
ML20214M719
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/27/1987
From: Thomas C
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20214M721 List:
References
NUDOCS 8706010410
Download: ML20214M719 (2)


Text

_ _ _ - _ - _ - _ _ _

Docket No.: 50-213 Mr. Edward J. Mroczka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Engineering Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Mroczka:

SUBJECT:

HADDAM NECK INTEGRATED SAFETY ASSESSMENT PROGRAM Enclosed for your information are our contractor's (Science Applications International Corporation) reports regarding the review of the Connecticut Yankee Probabilistic Safety Study and the individual probabilistic safety analysis for the topics which CYAPC0 found amenable to this type of analysis. Two of the following three reports are final and we plan to have the third report finalized by the middle of June.

(1) "A Review of the Connecticut Yankee Nuclear Power Plant Probabilistic Safety Study," April 30,1987(Final).

(2)- " Review of Risk - Based Evaluation of Integrated Safety Assessment Program Issues for Connecticut Yankee Plant,"

March 6,1987(Final).

(3) " Review of Risk - Based Evaluation of Integrated Safety Assessment Program Issues for Connecticut Yankee Plant (Additional Issues)," April 22, 1987 (Draft).

If you have any questions or coments regarding these reports, please call meat (301)492-7775.

Original signed by Cecil 0. Thomas, Director Integrated Safety Assessment Project Directorate Division of Reactor Projects - III, IV, V and Special Projects

Enclosures:

As stated cc: w/o enclosures DISTRIBUTION M. Boyle Docket File NRC PDR G. Kelly ISAPD File '

Service List AWang-FAkstulewicz ISAPD:LA p f ISAPD:DRSP,fp FAkstulewicz:yk ISAPD: DRSP 'D- SP MShuttleworth:jc jc AWang 5 5//f/87 5/p/87 5/S1/87 SE.J87 8706010410 870527 PDR ADOCK 05000213 P PDR

- _ - _ - - - _ _ _ _ - _ _ _ _ . _ - _ _ _ - _ _ _ _ _ _ - . _ _ _ . __ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _)

,,. g> "%,

go 4 UNITED STATES y g NUCLEAR REGULATORY COMMISSION n j wAsmucTON, D. C. 20555 g.....o May 27, 1987 Docket No.: 50-213 Mr. Edward J. Mroczka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Engineering Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Mroczka:

SUBJECT:

HADDAM NECK INTEGRATED SAFETY ASSESSMENT PROGRAM Enclosed for your information are our contractor's (Science Applications .

International Corporation) reports regarding the review of the Connecticut Yankee Probabilistic Safety Study and the individual probabilistic safety analysis for the topics which CYAPC0 found amenable to this type of analysis. Two of the following three reports are final and we plan to have the third report finalized by the middle of June.

(1) "A Review of the Connecticut Yankee Nuclear Power Plant Probabilistic Safety Study," April 30,1987(Final).

(2) " Review of Risk - Based Evaluation of Integrated Safety Assessment Program Issues for Connecticut Yankee Plant,"

March 6, 1987 (Final).

(3) " Review of Risk - Based Evaluation of . Integrated Safety Assessment Program Issues for Connecticut Yankee Plant (Additional Issues)," April 22,1987 (Draft).

If you have any questions or comments regarding these reports, please call me at (301) 492-7775.

Oxo.o h n Cecil 0. Thomas, Director Integrated Safety Assessment Project Directorate Division of Reactor Projects - III, IV, V and Special Projects

Enclosures: