ML20214M410

From kanterella
Jump to navigation Jump to search
Amends 109 & 136 to Licenses DPR-71 & DPR-62,respectively, Changing Tech Spec Surveillance Requirement 4.8.2.3.1(b) to Define Acceptable Loading of Div Battery Bus B to Allow Operation W/New Standby Uninterruptible Power Supply Sys
ML20214M410
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/27/1987
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20214M413 List:
References
NUDOCS 8706010298
Download: ML20214M410 (8)


Text

.$_ [ [ [

$[

~~

~

'~

)

'kR IIG jo UNITED STATES g

-[

g NUCLEAR REGULATORY COMMISSION g

ij WASHINGTON, D. C. 20555

%,...../

CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-325 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 109 License No. DPR-71 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Carolina Power & Light Company i

(the licensee), dated November 7, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; i

C.

There is reasonable assurance (1) that the activities authorized

'j by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations;

!+

i D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical l

Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. DPR-71 is hereby amended to read as follows:

8706010298 870527 DR ADOCK 05000324 p

PDR

, (2) Technical Specifications The Technical Specifications. contained in Appendices A and B, as revised through Amendment _No.109, are.hereby incorporated in the license. The. licensee shall operate.the_ facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its ' issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Elinor G. Adensam, Director Project _ Directorate II-1 Division of Reactor Projects - I/II

Attachment:

Changes to the Technical Specifications Date of Issuance: May 27, 1987 i

lab 2 R

PM:PD21:DRPR OGC-D 21 DRPR Pk

. on PR-ESylvester/vag-dA E$dhMam 05//' /87-05/sq/87 05// 1/87 05

/87 ea

. =. _ c,

. ;. c; ; _..

_ ~ _.. _ _ _ _ _ _ _ _

ATTACHMENT TO LICENSE AMENDMENT NO. 109 FACILITY OPERATING LICENSE NO. DPR-71 DOCKET NO. 50-325 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.

Remove Insert 3/4 8-8 3/4 8-8 i

I i

%~_.____

l ELECTRICAL POWER SYSTEMS D.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.3 As a minimum, the following D.C. divisions shall be OPERABLE,with tie breakers between divisions opent a.

Division I, consisting of:

~ ~

1.

A 250/125 voit bus 2.

Two 125 volt D.C. batteries, IA-1 and 1A-2, each with a full capacity charger.

b.

Division II, consisting of:

1.

A 250/125 volt bus.

2.

Two 125 volt D.C.' batteries, 18-1 and IB-2, each with a full capacity charger.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

(

With one or more batteries and/or its associated charger inoperable a.

in one division, restore the division to OPERABLE status within 7 days or be in at least HOT SEUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

W'ith one or more batteries and/or its associated charger inoperable in both divisions, be in at least HOT SEUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4 SURVEILLANCE REQUIREMENTS 4.8.2.3.1 Each of the above required D.C. divisions shall be determined OPERABLE with tie breakers open at least once per 7 days by verifying:

Correct breaker alignment and indicated power availability, and a.

b.

That no combination of more than two power conversion modules,

'a consist.ing of either two lighting inverters or one lighting inverter and ohe plant UPS unit, are aligned to division II bus B.

I c

l

/

BRUNSWICK - UNIT 1 3/4 8-8 Amendment No.

109

-~

. _ ~

~: 2

==t % =--- -

= = = - -

r.....

--:~~--. - -

pacy UNITED STATES

[

o,i NUCLEAR REGULATORY COMMISSION

!j WASHINGTON, D. C. 20555

\\...../

CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-324 i

BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 l

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.136 License No. DPR-62 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Carolina Power & Light Company (thelicensee),datedNovember7,1986,complieswiththestandards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations of the Comission; 4

C.

Thereisreasonableassurance(1)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be t

conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. DPR-62 is hereby amended to read as follows:

1 l

w.

,-w

--or

,-g

- -, - ~ - w

. (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.136, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Elinor G. Adensam, Director Project Directorate 11-1 Division of Reactor Projects - I/II

Attachment:

Changes to the Technical Specifications Date of Issuance: May 27, 1987 O'

2)l.DRPR LA PR PM:PD21:DRPR OGC D:

PA on ESylvester/vag ad EA dsam 05//f/87 05/W/87 05//f/87 05/f /87 hl$ (7 t

. = - -,_...,

ATTACHMENT TO LICENSE AMENDMENT NO. 136 FACILITY OPERATING LICENSE NO. DPR-62 DOCKET NO. 50-324 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.

Remove Insert 3/4 8-8 3/4 8-8 J

o 4

,r

-.g

..m.

ELECTRICAL POWER SYSTEMS D.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.3 As a minimum, the following D.C. divisions shall be OPERABLE with tie breakars between divisions open:

a.

Division I, consisting of:

1.

A 250/125 volt bus.

2.

Two 125 volt D.C. batteries, 2A-1 and 2A-2, each with a full capacity charger.

b.

Division II, consisting of:

1.

A 250/125 volt bus.

2.

Two 125 volt D.C. batteries, 2B-1 and 2B-2, each with a full capacity charger.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

With one or more batteries and/or its associated charger inoperable a.

in one division, restore the division to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

With one or more batteries and/or its associated charger inoperable in both divisions, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.8.2.3.1 Each of the above required D.C. divisions shall be determined OPERABLE with tie breakers open at least once per 7 days by verifying:

Correct breaker alignment and indicated power availability, and a.

b.

That no combination of more than two power conversion modules, consisting of either two lighting inverters or'one lighting inverter and one plant UPS unit, are' aligned to division II bus B.

/

BRUNSWICK - UNIT 2 3/4 8-8 Amendment No. }V[ l.36

--