s N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 7/03/86 COMPLETED BY CZAJKA TELEPHONE 616-465-5901 OPERATING STATUS 1.
Unit Name D. C. Cook Unit 1 2.
Reporting Period JUNE 86 Inotes i
- 3. Licensed Thermal Power (MWt) 3250 I I
- 4. Name Plate Rating (Gross MWe) 1152 I I
5.
Design Electrical Rating (Not MWe) 1030 l I
- 6. Maximum Dependable Capacity (GROSS MWe) 1056 I I
- 7. Maximum Dependable Capacity (Not MWe) 1020 -------------
C.
If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons _ ___ _ ___
- 9. Fo~eE I nvei~To Which ReStEict$d 7 ii~~n~y (Not MWe5~9E_RTP
~~
w A
- 10. Reasons For Restrictions. If Any An administrative powcr'HTnI_oTMf RTP t
has been maintained for Cycle 9 since initial return to service on 851116. The
)s,~Qo,]((o,j,QcHG,~T[{t to minimize steam generator tube degrada 1on.
1 This Mo.
Yr. to Date Cues.
- 11. hours in Reporting Period 720.O 4343.O 100775.O
- 12. No. of Hrs. Reactor Was Critical O.0 3527.3 71816.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
- 14. Hours Generator on Line 0.0 3527.3 70379.9
- 15. Unit Reserve Shutdown Hours O.O O.O 321.O
- 16. Gross Therm. Energy Gen. (MWH) 0 10341972 205337655
- 17. Gross Elect. Energy Gen. (MWH)
O 3363840 67341380
- 18. Net Elect. Energy Gen. (MWH)
O 3236488 64783645
- 19. Unit Service Factor 0.0 81.2 71.2
- 20. Unit Availability Factor 0.0 81.2 71.2
- 21. Unit Capacity Factor (MDC Net) 0.0 73.1 64.3
- 22. Unit Capacity Factor (DER Net) 0.0 72.4 61.9
- 23. Unit Forced Outage Rate 100.0 18.8 8.4
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startups
__ Unit shutdown, expected startup 7/OJ/86_________ ___________
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION f
' (
B609100283 860630 PDR ADOCK 05000315 R
PDR m
9.-
m
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-315 UNIT ONE DATE 7/03/06 COMPLETED BY CZAJKA TELEPHONE 616-465-5901 MONTH JUNE B6 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1
0 17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
O O
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 O
l l
50-315 DOCKET NO.
IlNITSlHill OWNS AND POWEH RLpilrllONS LINit' N AME D.C. Cook, Unit 1 DATE 7-5-86 1
HE PORT Mg) Nill June, 1986 COMPl.ETED NY B.A. Svensson TEl.lfilONE 616/465-5901 "L
w
=
g
.$ 'd 3
!!"j E*
g7, Cause & Causeceive i icensee H.i.
Dale g
gg
,gg livens p
sq Attimi se.
o$
sE - jgg Repose
- vO O
Psevent Hecinogenice H
6 250 860528' F
720 A
3 86-012-0 HA INSTRU The Unit tripped from 90% RTP at 0020 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> EDT due to a spurious main turbine backup overspeed trip signal. The cause.for the over-speed trip signal could not be attributed to a specific component failure. Overspeed testing will be performed during unit startup. The Unit remained out of service at the end of the month. All major main-tenance items have been completed.
The Unit is estimated to be returned to service on June 7, 1986.
1 2
3 4
I:: I oiccil Itcason:
Meehanl:
lixhiliit G - Insisincelines S: Stheilulcel A lisluipmens failnic(Enplain) 1 Manual for Peepasatious of Data 11 Mainienance seiTest 2-Manual Scram.
lintiy Slieces fm ikensee C Hefueling 3-Antomalie S sam.
livens Hepois il l'HI17ile INIIHi~G-D Hegulatosy Hessiicsion l Oehen Ilisplaini 0161) 17 Openalos Isaininga lkenw I:naminatiosi F Ailniissisteative 5
G Ope:atimial 1:: in Ilixpbini INinhat I Same Sinuce l'8//7) 11 Othes liixpbini i
Docket No. ' 50-315 i
Unit'Namns
-D.C. Cook Unit l Completed By:
D. A.
Bruck e
Telephone:
(616) 465-5901 Date:
July 3, 1986 Page:
1 of 1 MONTHLY OPERATING ACTIVITIES - JUNE, 1986 HIGHLIGHTS:
The reporting period began with the. Reactor Coolant System in Mode 5 at 130*F.
The RCS was heated up.to Mode 4 and later cooled back down to Mode 5'due to Reactor Coolant Pump problems.
The reporting period ended with the-Reactor _ Coolant System in Mode 5 at 164*F.
SUMMARY
06-01-86 At 0652, operators started draining the RCS to half loop.
Half. loop was achieved at 0530 on 06-02-86.
06-12-86 At 2053, filling of the RCS began.
The fill was stopped at 0437 on 06-13-86.
06-13-86 At 0703, the pressurizer heatup began in preparation to draw a bubble.
At 1040 the bubble was established.
06-16-86 At 1948, the RCS entered' Mode 4.
06-17-86 At 0400, the RCS heatup was stopped.at 300*F.
. 23-86 At 1728, an RCS cooldown and depressurization to Mode 5 was' started because of reactor coolant pump seal and motor problems.
5 06-24-86 At 0200, the RCS entered Mode-5.
06-25-86 At 0620, operators started draining the RCS to half 4
loop.
Half loop was achieved at-0635 on 06-26-86.
06-29-86 At 0332, filling of the RCS began.
The fill'was-stopped at 0700.
At 0840, the pressurizer heatup began in preparation to 4
draw a bubble.
At 1350 the bubble was established.
06-30-86 At 2030, a depressurization of the RCS was begun for alignment of #11 reactor coolant pump.
i e
v-~,.
rr..,.
-,.,,.-_...,,_,-,,,,,v.,~..._
,...._y,,,,,..m,_m...,.,_._,,_
,_.,_-,__,c
,,__,..~_.,,,,,.._,,,m.m,
_.y,.,,_
DOCKET NO.
50 - 315 UNIT NAME D. C. Cook - Unit No. 1 DATE 7-3-86 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE JUNE, 1986 M-1 CS-321, Containment Isolation Check Valve was leaking exces-sively. Valve was replaced and the new valve tested satis-factorily.
M-2 Reactor Coolant Pump No. 12 had excessive vibrations. Replaced lower motor guide shoe and aligned motor to pump and verified proper operation.
M-3 NRV-151, Pressurizer Power Operated Relief Valve leaked by.
Replaced stem, plug, and seat ring. Valve was retested and returned to service.
M-4 NRV-152, Pressurizer Power Operated Relief Valve was repaired due to leak-by indication. Replaced stem, plug, and seat' ring.
Valve retested satisfactorily.
M-5 NRV-153, Pressurizer Power Operated Relief Valve was repaired due to a leak-by problem. Replaced stem, plug, and seat ring after it was discovered that the old parts were steam cut.
The valve was retested satisfactorily.
C&I-l NIS Intermediate Range Channel, N-35, failed. The detector canister was found to have water in it.
Replaced the detector with a new detector and performed required calibration proce-dures.
n -
.m--
-.e,---
r m--
- - - - - ~ -
V>4 4%
";y Lsy,,,,,.
INDAGNA & MICHIGAN ELEC1BIC COMPAN1 Donald C. Cook Nuclear Plant-P.O. Box 458 Brusgman, Machugan 49106 July 5, 1986 Director, Office Of Management Information and Progratu Control U. S. Nuclear Regulatory Commission Washingtou, D. C.
20555 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear plant Unit 1 Technical Specification 6.9.1.6, the attached Monthly Operating Report for the Month of June, 1986 is submitted.
Sincerely, M!J W. G. Smith, Jr Plant Manager WGS:ab Attachments cc:
J. E. Dolan M. P. Alexich R. W. Jurgensen NRC Region III l
B. L. Jorgensen R. O. Bruggee R. C. Callen S. J. Mierzwa F. S. VanPelt, Jr.
D. W. Paul D. R. Hahn Z.
Cordero J. J. Markowsky J. F. Stietzel PNSRC File INPO Records Center ANI Nuclear Engineering Department I