Monthly Operating Rept for June 1986
ML20214L570
Person / Time
Site: Beaver Valley
Issue date: 06/30/1986
From: Boyle R, Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8609100275
Download: ML20214L570 (6)


Text

_-__

t NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE JUNE 1986 June 1 The Station was in cold shutdown for the Fifth through Refueling and Ten-Year Inservice Inspection.

June 30 The Reactor Coolant System temperature and pressure were at ambient conditions.

5E2 yea"188M Bt8ejig4 1

R

o l

OPERATING DATA REPORT DOCKET NO.:

50-334 REPORT DATE: 07/03/86 COMPLETED BY: R.N. BOYLE TELEPHONE:

(412) 643-1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: JUNE 1986
3. LICENSED THERMAL POWER (MWe):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMUIATIVE

11. HOURS IN REPORTING PERIOD:

720.0 4343.0 89111.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

0.0 3220.1 48821.1

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

0.0 3217.5 47352.3

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

0.0 8049750.4 111073191.5

17. GROSS ELECT. ENERGY GEN. (MWH):

0.0 2638550.0 35419950.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

-2530.0 2483610.0 33009913.0

19. UNIT SERVICE FACTOR: (PERCENT) 0.0 74.1 55.6
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 74.1 55.6
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 70.6 49.2
22. UNIT CAPACITY FACTOR (DER): PCT 0.0 68.5 47.8
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.4 22.6
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

j Fifth Refueline. May 16. 1986. Scheduled 93 Days l

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

8-17-86

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

i l

FORECAST ACHIEVED l

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A i

COMMERCIAL OPERATION N/A N/A

--,p

ol AVERAGE DAll.i UNIT POWER LEVEL DOCXZT NO.

50-334 I

UNIT 3V?S 'Ini:

l DATE July 8, 1986 R. N. Boyle CDMPLETED SY TELEPHONE (412) 643-1825 MONDI JUNE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nes)

(Mwe.Nes:

0 1

g7 0

0 0

1 gg 0

0 3

g, 4

0 20

-0 2,

o 0

0 I

6 g

0 i

7 3

0 3

0 34 0

9 u

0, 10 0

j 26 Ii 0

27 0

0 0

I 12 28 0

13 29 14 0

0 30 0

15 3t 16 0

i l

INSTRUCTIONS On this format. fist the nerage daily unit power lese! in MWe.Nei f.sr esen day in the reporting month. Compute to the nearest whule mepwatt.

14/77) i

e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-314 UNIT N4ME BVPS Unit #1 DATE Julv 3.

1986 REPORT MONIH JUNE COMPLETER) BY R.

N.

Bovie 4

TELErtIONE (412) 643-1825 l

m C^

'*. 60 O j

a e

Corrective No.

Date Event E

0:0 E

.E $ $

  • g Action to N

E Ud Report #

y ao Prevent Recurrence g

u o

o*

7 860601 S

720 C

4 N/A ZZ ZZZZZZ Station remained shutdown for Fifth Refueling.

1 l

i 1

1 I

1 1

1 4

1 l

1 2

3 4

F: F.w.ed Reas.m:

Hethod:

Exteobel G - leistius siimes S-5thedu'ed A Figuipenens Failuseil aplaint g-n.noat i.n Psepasais.wiist Dasa i

B Male eenance a t Test 2-Manual scram 1.nasy Saecces I.= 1.kensee C Refueling 3-Automatic Scram Fsene Mcpius st i R e lise tnt RI G D Regulassu) Resiskni.*

4-Continued From Frevious Month Olbli I (hiesatus Tsaining A liense l'xananasione 5-Reduetion I AJnunist ative 9-Other 5

t. therahimial I e seie ll aplain t I sinhis 1 Sauer,Sounc l'8/77)

II(Ishes ll splaisil l-

s' MAJOR MAINTENANCE 1.

Overhaul of Cooling Tower Pump (CT-P-1A) 2.

Rebuild of Condesate Pump and Motor (CN-P-1A) 3.

Rebuild of Heater Drain Pump Motor (SD-P-1B) 4.

Removal of Fuel and Lower Internals from Reactor Vessel for Ten-Year Inspection.

5.

Dredged both Main and Alternate Intake Structures 6.

Resistance meggering of Reactor Coolant Pump Motor (RC-P-18) 7.

Inspection of Steam generator J-tubes 8.

Overhaul of High-Pressure Turbine

A des

'Af Telephone (412) 393-6000 "2'1ll3""

Shippingport, PA 15077 0004 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:

In accordance with Appendix A,

Technical Specifications, the Monthly Operating Report is submitted for the month of June,1986.

Very trlly yours, O

J. J. Carey Vice President Nuclear Group rw Enclosures cc: NRC Regional Of fice King of Prussia, PA q

>