Text
_-__
t NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE JUNE 1986 June 1 The Station was in cold shutdown for the Fifth through Refueling and Ten-Year Inservice Inspection.
June 30 The Reactor Coolant System temperature and pressure were at ambient conditions.
5E2 yea"188M Bt8ejig4 1
R
o l
OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE: 07/03/86 COMPLETED BY: R.N. BOYLE TELEPHONE:
(412) 643-1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JUNE 1986
- 3. LICENSED THERMAL POWER (MWe):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 4343.0 89111.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
0.0 3220.1 48821.1
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
0.0 3217.5 47352.3
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
0.0 8049750.4 111073191.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
0.0 2638550.0 35419950.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
-2530.0 2483610.0 33009913.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 74.1 55.6
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 74.1 55.6
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 68.5 47.8
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.4 22.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
j Fifth Refueline. May 16. 1986. Scheduled 93 Days l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
8-17-86
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
i l
FORECAST ACHIEVED l
INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A i
COMMERCIAL OPERATION N/A N/A
--,p
ol AVERAGE DAll.i UNIT POWER LEVEL DOCXZT NO.
50-334 I
UNIT 3V?S 'Ini:
l DATE July 8, 1986 R. N. Boyle CDMPLETED SY TELEPHONE (412) 643-1825 MONDI JUNE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nes)
(Mwe.Nes:
0 1
g7 0
0 0
1 gg 0
0 3
g, 4
0 20
-0 2,
o 0
0 I
6 g
0 i
7 3
0 3
0 34 0
9 u
0, 10 0
j 26 Ii 0
27 0
0 0
I 12 28 0
13 29 14 0
0 30 0
15 3t 16 0
i l
INSTRUCTIONS On this format. fist the nerage daily unit power lese! in MWe.Nei f.sr esen day in the reporting month. Compute to the nearest whule mepwatt.
14/77) i
e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-314 UNIT N4ME BVPS Unit #1 DATE Julv 3.
1986 REPORT MONIH JUNE COMPLETER) BY R.
N.
Bovie 4
TELErtIONE (412) 643-1825 l
m C^
'*. 60 O j
a e
Corrective No.
Date Event E
0:0 E
.E $ $
- g Action to N
E Ud Report #
y ao Prevent Recurrence g
u o
o*
7 860601 S
720 C
4 N/A ZZ ZZZZZZ Station remained shutdown for Fifth Refueling.
1 l
i 1
1 I
1 1
1 4
1 l
1 2
3 4
F: F.w.ed Reas.m:
Hethod:
Exteobel G - leistius siimes S-5thedu'ed A Figuipenens Failuseil aplaint g-n.noat i.n Psepasais.wiist Dasa i
B Male eenance a t Test 2-Manual scram 1.nasy Saecces I.= 1.kensee C Refueling 3-Automatic Scram Fsene Mcpius st i R e lise tnt RI G D Regulassu) Resiskni.*
4-Continued From Frevious Month Olbli I (hiesatus Tsaining A liense l'xananasione 5-Reduetion I AJnunist ative 9-Other 5
- t. therahimial I e seie ll aplain t I sinhis 1 Sauer,Sounc l'8/77)
II(Ishes ll splaisil l-
s' MAJOR MAINTENANCE 1.
Overhaul of Cooling Tower Pump (CT-P-1A) 2.
Rebuild of Condesate Pump and Motor (CN-P-1A) 3.
Rebuild of Heater Drain Pump Motor (SD-P-1B) 4.
Removal of Fuel and Lower Internals from Reactor Vessel for Ten-Year Inspection.
5.
Dredged both Main and Alternate Intake Structures 6.
Resistance meggering of Reactor Coolant Pump Motor (RC-P-18) 7.
Inspection of Steam generator J-tubes 8.
Overhaul of High-Pressure Turbine
A des
'Af Telephone (412) 393-6000 "2'1ll3""
Shippingport, PA 15077 0004 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for the month of June,1986.
Very trlly yours, O
J. J. Carey Vice President Nuclear Group rw Enclosures cc: NRC Regional Of fice King of Prussia, PA q
>