ML20214L513

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1986
ML20214L513
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/30/1986
From: Elms A, Romberg W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
MP-9245, NUDOCS 8609100211
Download: ML20214L513 (4)


Text

e*

e s

ettette NRC OPERAT! 3 STATUS REPORT CCMPLETED BY REACTOR EN6INEERING eletest

1. DOCKET.... 50-423 OPERATIN6 STATUS
2. REPORTING PER10D...10NE 1986 0UTABE + ONLINE HOURS.. 0

+ 720

= 720

3. UTILITY CONTACT.................A. L. ELMS 203-444-5300 e****sessesse
4. LICENSED THERMAL P0NER.........................................

3411 e MILLSTONE 6

5. N AMEPLA TE RATING (6ROSS ME)................................... 1,253 M e UNIT 3 e
6. DESIGN ELECTRICAL RATIN6 (NET ME)............................. 1153.61 essessessesse
7. MA!! MUM DEPENDABLE CAPACITY (6ROSS M E)........................

1197

~

8. MAI! MUM DEPENDABLE CAPACITY (NET ME)...........................

1149.35 9.

IF CHAN6ES DCCUR ABOVE $!NCE LAST REPORT, REASONS ARE...........

N/A

10. PONER LECL TO MICN RESTRICTED, IF ANY INET ME)...............N/A
11. REASON FOR RESTRICTION, IF ANY....N/A MONTH YEAR 70 DATE CUMULATIVE TO DATE 38835 BSE3333SSSSS 333333333333333333
12. HOURS IN REPORTIN6 PERIOD 720.0 1655.0 1655.0
13. NUMBER OF HOURS THE REACTOR NAS CRITICAL 720.0 1560.3 1560.3
14. REACTOR RESERVE SHUTDONN HOURS 0.0 83.2 83.2
15. HOURS SENERATOR ONLINE 720.0 1544.2 1544.2
16. UNIT RESERVE SHUTDCM HOURS 0.0 0.0 0.0
17. GROSS THERMAL ENER6Y SENERATED (MNH) 2447154.0 5116303.3 5116383.3 18, 6ROSS ELECTRICAL ENERGY GENERATED (M H) 852657.0 1780366.5 1780366.5
19. NET ELECTRICAL ENERGY 6ENERATED (MNH) 818403.0 1702845.3 1702645.3
20. UNIT SERVICE FACTOR 100.0 93.3 93.3
21. UNIT AVAILABILITY FACTOR 100.0 93.3 93.3
22. UNIT CAPACITY FACTOR (USING MDC NET) 98.9 69.5 89.5
23. UNIT CAPACITY FACTOR (USIN6 DER NET) s 99.5 89.2 89.2
24. UNIT FORCED OLTAGE RATE 0.0 6.7 6.7
25. UNIT FORCED OUTA6E HOURS [

0.0 110.8 110.8 SHUTDONNS SCHEDULED DVER NEIT S!! MONTHS ITYPE, DATE AND DURATION OF EACH)..............

N/A t

IF CURRENTLY SHUTDONN, ESTIMATED STARTUP DATE......N/A l

l 1[h[j 8609100211 860630 PDR ADOCK 05000423 R

PDR j l/ {

/

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE July 7, 1986 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1157 17 1154 2

1131 18 1136 3

1171 19 1120 4

1136 20 1135 5

1134 21 1143 6

1103 22 1136 7

1131 23 1143 8

1153 24 1094 9

1144 25 1130 10 1170 26 1137 11 1107 27 1139 12 1181 28 1154 13 1101 29 1094 14 1161 30 1149 15 1131 31 N/A 16 1125

_--y-

s4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE July 7,1986 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 REPORT MONTH JUNE 1986 l

Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Type (1) (Hours)

Reason (2)

Down Reactor (3) Report #

Code Code Prevent Recurrence NONE l

1 2

3 4

-F:

Forced

-Reason:

-Method:

-Exhibit G - Instructions S:

Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)

E - Operator Training & License previous month Examination 5 - Power Reduction 5 F - Administrative (Duration = 0)

Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)

H - Other (Explain)

~7

~

f 4.

General Otfices

sr tv a cow HARTFORD, CONNECTICUT 06141-0270

.a m. rea ms cc.ea*'

(203) 666-6911 k

L A "a. A$ $nS5e s cowam July 9, 1986 MP-9245 Director, Office of Resource Management U. S. Nuclear Regulatory Commission

~

Washington, D. C. 20555

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operati.nq Report 86-7 covering operations for the month of June is hereby forwarded.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY hh4 Wayne D. Ro rg StationSudrintendent Millstone Nuclear Power Station WDR/ ALE:sb Attachment cc:

Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D.C. (10)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D. C. 20555 4