Forwards Safety Insp Repts 50-456/86-37 & 50-457/86-29 on 860728-0801.No Violations Noted
ML20214L394
Person / Time
Site: Braidwood  
Issue date: 08/21/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20214L396 List:
References
NUDOCS 8609100131
Download: ML20214L394 (2)


See also: IR 05000456/1986037

Text

7

.

s

.

3

AUG 21 1986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Dr. R. B. Holtzman

of this office on July 28 to August 1,1986, of activities at Braidwood Nuclear

Power Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132

and No. CPPR-133 and to the discussion of our findings with Mr. L. E. Davis and

others of your staff at the conclusion of the inspection on August 1,1986.

Additional discussions were held with D. Keneally of your corporate office

and R. Aken on August 5 and with M. Andrews on August 7, 1986.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure:

Inspection Reports

No. 50-456/86037(DRSS);

No. 50-457/86029(DRSS)

See Distribution Attached

&

"N)]O

W

fShaer g'eO

"

Ho tzman/kja

Sch'umacher

Gardner

,

8609100131 860821

PDR

ADOCK 05000456

G

PDR

f

=

.

gg 211986

Commonwealth Edison Company

2

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB