Forwards Matl Control Insp Rept 50-424/86-04.Response to Violations & Related Problems Re Readiness Review App 21E, Matl Control Acceptable
ML20214L128
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/18/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20214L130 List:
References
NUDOCS 8612020580
Download: ML20214L128 (3)


See also: IR 05000424/1986004

Text

_

-

^ ' '

.f

Q

Q

November 18, 1986

Docket No.

50-424

License No. CPPR-108

Georgia Power Company

,

1 ATTN: Mr. J. H. Miller, Jr.

President

P. 0. Box 4545

.

Atlanta, GA 30302

3

Gentlemen:

SUBJECT': NRC REVIEW 0F V0GTLE UNIT 1, READINESS REVIEW APPENDIX 21E, MATERIAL

CONTROL - REPORT NO. 50-424/86-04

-

The NRC has completed a detailed review, inspection, and verification of the

'*

subject Appendix which you submitted to the NRC on November 7,1985.

Periodic

inspections were conducted at the Vogtle site and the resultant findings were

"

discussed with members of your staff at the conclusion of these inspections.

Areas contained in the Appendix which were reviewed, examined, and verified are

identified in the enclosed report.

Within these areas, the inspection and

. verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

' Reviews and inspection of Appendix 21E identified two violations and a number

of-other related problems. Your responses to these violations and other related

problems were - reviewed and found acceptable. Subsequent inspections. verified

that adequate' corrective actions had been taken. Consequently, these issues are

being closed in this report.

,

Based upon the NRC review and inspection of those activities identified in

Appendix 21E, we have determined that the applicant's program for construction

,

material control at Vogtle Unit 1 is acceptable and in complance with applicable

regulatory requirements. This decision is based upon information currently

available to the inspectors. Should information subsequently become available

which was not considered during this review or which conflicts with earlier

information, it will be evaluated to determine what effects it may have on the

above conclusion.

Please contact us should you have any questions concerning this letter.

Sincerely,

(Original signed by M.L.Ernst for J. Nelson Grace)

86120 % h h

2[

J. Nelson Grace

PDR

Regional Administrator

G

Enclosure:

NRC Report Nos. 85-62 and 86-58

(cc w/ encl:

See page 2)

\\

T

Og

_

_

.

..

.

co

a= -

2

November 18, 1986.

t

cc w/ enc 1:

3J. P. O'Reilly, Senior Vice President

Nuclear Operations

R. E. Conway, Senior Vice President &

Project Director

r

'

D. O. Foster, Vice President, Project

,

Support

P. D. Rice, Vice President, Project

Engineering

'

>

H. Pinson, Vice President, Project

'

.

Construction

J. T. Beckham, Vice President &

General Manager - Operations

'

,

'

y R. A. Thomas, Vice President,

-

<

Licensing

,

W0. S. Read, General Manager,

f

Quality Assurance

' C. W. Hayes, Vogtle Quality-

'

Assurance Manager

g W. C. Ramsey, Manager -

\\

Readiness Review

4 G. B. Bockhold, General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

M. H. Googe, Project

Construction Manager

E. D. Groover, Quality

.

Assurance Site Manager -

Construction

J. A. Bailey, Project Licensing

Manager

G. F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

E. L. Blake, Jr. , Esq. , Shaw,

Pittman, Potts and Trowbridge

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

J. G. Ledbetter, Commissioner,

Department of Human Resources

,

C. H. Badger, Office of Planning

- '

\\ D. Kirkland, III, Cc;nsel,

and Budget

Office of the Consumer's Utility

Council

D.'Feig, Georgians Agair.st

Nuclear Energy

(cc w/ enc 1 cont'd - see page 3)

_.

_

a

o

V

3

November 18, 1986

cc w/ encl.

\\sDr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

\\

Panel

4G. A. Linenberger, Jr. , Administrative Judge

i Atomic Safety and Licensing Board

J. Panel

,

B

P. Garde,. Citizens Clinic, Director

Government Accountability Project

,

bec w/ enc 1:

E. Reis, ELD

W. M. Hill, IE

M. Miller, NRR

W. Brach, EDO

M. Sinkule, RII

E.'Christnot, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

s

.

if

,

,

i

RII

.

RII

RII

RI

RII

i

(h

(11!

.

h2,

%n

kson:ht

GABelisle

CAMTian

VPa cifra

EChrisi. t

jf/%/86

8/ //86

-8/f'V86

8/ /89

K)iil'$(

/0/Y{IE80

H/5/86

,D

/0

ELD

RII

RII

RI

RII

NRR

M% ft

NLGh

b/

MU6/es--

MOG h

MVSinkble

VLBRdwnlee

DWa k

Ernst

TNovik

BK

es EChristenbury

'

99/f/86

49/ /86

/

09/ /86 09/ /a

/ /86 09/ /86

n

11 / 5

n g /86 n7nie

n/r/if

a/c/ec

-

.. ._

-

..