Text
f W 79gy D6cket No.: So.4g4 Mr. James P. O'Reilly Senior Vice President - Nuclear Operations Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302
Dear Mr. O'Reilly:
Subject:
Results of Examination for Potential Leakage Outside Containment for Vogtle Unit 1 By letter dated March 9, 1987, Georgia Power Company (GPC) submitted the results of an examination for potential leakage outside containment to fulfill the requirements of NUREG-0737 Item III.D.I.1 as stipulated in License Condition 2.C(8)a of the Vogtle Unit I low-power license (NPF-61) dated i
l January 16, 1987.
In that letter, GPC stated that a supplemental report would I
be submitted following completion of testing of the positive displacement pump and valve 1-HV-3258 of the post-accident sampling system.
In Section 11.5.3 of SER Supplement 6, the staff concluded that a subsequent submittal on the above items would be acceptable and that the low-power license condition was satisfied.
By letter dated April 20, 1987, GPC submitted its supplemental report on leakage measurement of the positive displacement pump and valve 1-HV-3258.
GPC indicated that no leakage was detected from either the pump or the valve.
On the basis of its review of the licensee's April 20 submittal, the staff concludes that the requirerrents of NUREG-0737 Item III.D 1.1 are fully satisfied.
Sincerely, 1
i 5
l Melanie A. Miller, Project Manager Project Directorate !!-3 Division of Reactor Projects I/II i
cc: See next page I
l JISTRIBW4%
( Docket H le J SVarga Glainas JPartlow 7 Cal PDF ACRS(10)
OGC-Bethesda EJordan l
NRC PDR MMiller PDII-3 Reading BJYoungblood Reading CWillis i
(
l L43/ PI/II PQII43 PDI 3
0
/II M 4Her/ ad M0drka/DRPI/II n
BJY(
0 /g/87 05/ ] /87 05/g'/87
/
8705290173 070519 PDR ADOCK 05000424 p
F Mr. J.' P. O'Reilly Georgia Power Company Vogtle Electric Generating Plant cc:
Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Comission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Depoish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /
Suite 225 Southern Company Services Inc.
32 Peachtree Street, N.W.
P.O. Box 2625 Atlanta, Georgia 30303 Bimingham, Alabama 35202 James E. Joiner Mr. Paul Rice Troutman, Sanders, Lockeman, Vice President & Project General Manager
& Ashmore Georgia Power Company Candler Building Post Office Fox 299A, Route 2 127 Peachtree Street, N.E.
Waynesboro, Georgia 30E30 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.
P.O. Box 2625 Carol Stangler Bimingham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.
Atlanta, Georgia 30307 Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, D. C.
20037 Mr. G. Dockhold, Jr.
Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Conway Senior Vice President and Project Director Georgia Power Company Rt. 2, P. O. Box 299A Waynesboro, Georgia 30830
)
-