ML20214K828

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-37 & NPF-66,revising Tech Spec Tables 4.3-1 & 4.3-2 to Clarify That Setpoint Verification Not Required During Trip Activating Device Operational Tests.Changes Also Apply to Braidwood.Fee Paid
ML20214K828
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 05/20/1987
From: Hunsader S
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
Shared Package
ML20214K830 List:
References
3100K, NUDOCS 8705290065
Download: ML20214K828 (2)


Text

_ - -

/

a. ,

, Commonwealth Edison

( One First National Plaza, Chicago, Illinois

' \ - - - . /: Address Reply t;: Post Office Box 767 w/ Chicago, Illinois 60690 - 0767 May 20, 1987 Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Application for Amendment to Facility Operating Licenses NPF-37 and NJF-66, Appendix A, Technical Specifications NRC Docket Nos. 50-454, 50-455, 50-456 and 50-457

Dear Mr. Murley:

Pursuant to 10 CFR 50.90, Commonwealth Edison proposes to amend Appendix A, Technical Specifications, of Facility Operating Licenses NPF-37 and NPF-66. The proposed amendment requests changes to Tables 4.3-1 and 4.3-2 to clarify that a setpoint verification is not required when performing the monthly or quarterly Trip Activating Device Operational Test for the undervoltage and underfrequency relays. The new Technical Specification pages are contained in Attachment A. A summary of the proposed changes is also included in Attachment B. These changes also apply to the Braidwood Station Technical Specifications.

The proposed changes have been reviewed and approved by both On-site and off-site review in accordance with Commonwealth Edison Company procedures. We have reviewed this proposed amendment in accordance with 10 CFR 50.92(c) and determined that no significant hazards considerations exist. This evaluation is documented in Attachment C.

Commonwealth Edison is notifying the State of Illinois of our application for this amendment by transmitting a copy of this letter and its attachments to the designated State Official.

8705290065 DR 870520 ADOCK 0500 4 g

ft,% 4) ClL ?$00 I

Mr. Thomas E. Murley May 20, 1987 In accordance with 10 CFR 170, a fee remittance in the amount of

$150.00 is enclosed.

Please direct any questions you may have concerning this matter to this office.

Very truly yours, b-S. C. Hunsader Nuclear Licensing Administrator klj

Enclosure:

Fee Remittance Attachments (A): Proposed Technical Specification Changes (B): Summary of Proposed Changes (C): Evaluation of Significant Hazards Considerations F

cc: Resident Inspector - Byron Resident Inspector - Braidwood L. N. Olshan - NRR J. A. Stevens - NRR Regional Office RIII

. C. Parker - State of Ill.

SUBSCRIBED AND to

- day befojr of rrfp[).

AAthis , , 1987

/ .

0

' "Not5ry fublic' l 3100K

-. _ ._. _ _ __