Ack Receipt of 860919 Response to Violation Noted in Insp Repts 50-321/86-20 & 50-366/86-20.Request for Reconsideration of Violation Re Inadequate Design & Installation Controls of CRD Hydraulic Control Units Denied
ML20214K705
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/20/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 8612020424
Download: ML20214K705 (2)


See also: IR 05000321/1986020

Text

'

'

  • j

,%

NOV 201986

Georgia Power Company

ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-321/86-20 AND 50-366/86-20

Thank you for your response of September 19, 1986, to our Notice of Violation

issued on August 20, 1486, concerning activities conducted at your Hatch

facility.

We have evaluated your response and found that it meets the

requirements of 10 CFR 2.201.

We will examine the implementation of your

corrective actions during future inspections.

After careful review of your request for reconsideration of the severity level of

the violation from a Severity Level IV to a Severity Level V, we have concluded

that the assigned severity level should stand as stated in the Notice of Violation.

Our basis for this decision is that the violation was the result of inadequate

design and installation controls of the Unit 1 Control Rod Drive Hydraulic

Control Units (HCUs).

This was a Quality Assurance problem which we do not

consider to be of minor significance especially when our inspectors found that

all Unit 1 HCUs were installed without the required plain punched washers. Also,

the safety significance of the installed HCU configuration was not known at the

time of the finding.

It was subsequently evaluated by your staff and determined

to be acceptable in that the installed HCU configuration did not represent a

problem with respect to continued safe operation of the unit. We do agree with

that evaluation, however, the Quality Assurance problem necessitates a Severity

Level IV classification.

We appreciate your cooperation in this matter.

Sincerely,

Ihr

OL

c)

9

7Lotun.,

bq

J. Nelson Grace

cc:

J. P. O'Reilly, Senior Vice

l President Nuclear Operations

QJ. T. Beckham, Vice President,

Plant Hatch

. C. Nix, Site Operations

General Manager

. Fraser, Acting Site QA Supervisor

. Gucwa, Manager, Nuclear Safety

and Licensing

(bec-seePa9e2)

8612O20424 861120

I

If

PDR

ADOCK 05000321

G

PDR $

QQf

F

- .

.. '; . e '*

-Georgia Power Company

2'

)

bcc:bRCResidentInspector

Hugh S. Jordan, Executive Secretary

Document Control Desk-

State of Georgia

R. Walker

G. Jenkins

/

RII

RII

RII

R

RII

-

L

00

'

A

RC

eau:Jw

Algnatonis

VBr

lee

Walk

MCrnst

  1. d

jf/fl/

11/g%/86

11/lg/86

11//q/86

11//g/86

11/ /86

ft